NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 15 pages

Full Environmental Assessment Form, SEQR

Machine-extracted title · confidence 72%

Full SEQR environmental assessment form and guidance for project significance.

NYC-WTC_000411602–000411616
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Several sensitive receptor are located in the vicinity of the site, specifically Stuyvesant High School and residential facilities which are 425 and 600 feet to the south, respectively, and the Borough of Manhattan Community College which is 250 feet east of the operations. As the primary operation at the site consists of truck loading/unloading operations, these receptors would be located more than the criterion distances provided within the City Environmental Quality Review (CEQR) Technical Manual (see Table 3R-3, CEQR Technical Manual, 1993). For truck loading/unloading operations, residences and educational facilities more than 150 feet from the noise source generally do not result in significant noise impacts.

In addition, the Pier 25 facility is located within a restricted access area, specifically Zone 5, of the overall World Trade Center Emergency Project area. The primary sources of noise at the site consist of the truck loading/unloading operations and diesel powered cranes. Additional noise may be generated from heavy equipment, such as grapple cranes and front end loaders, although this equipment is only used intermittently and on an as-needed basis . Likewise, operations at the Pier 25 site are considered to be part of the larger emergency operation associated with the destruction of the World Trade Center complex. These construction-related activities are temporary and will only extend for the duration of the debris removal activities which are anticipated to last between 24-30 months. Upon the conclusion of debris removal activities, the facility will be closed and removed from the site.

C. Zoning and Planning Information

6. Is the proposed action consistent with the recommended uses in adopted local land use plans?

The Pier 25 debris removal operation would not be consistent with current approved land use plans for the site and surrounding area. The location of the Pier 25 facility includes an area to be developed as a bikeway and pedestrian walkway as part of the Route 9A project and the Hudson River Park. The Pier 25 operation, however, is a temporary facility that will only operate for the duration of debris removal operations associated with the World Trade Center site and is not intended to be a permanent or long term facility. Upon the conclusion of debris removal activities the site would be restored to it previous condition.

4

CITY_21MC100_013377746

NYC-WTC_000411614

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000411614Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000411617

SEQR Appendix A supporting data for environmental assessment process.

Similar indexed content

Compare copies and versions →