NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 13 pages

Full Environmental Assessment Form, SEQR (Appendix A)

Machine-extracted title · confidence 72%

SEQR Appendix A supporting data for environmental assessment process.

NYC-WTC_000411617–000411629
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Department of Sanitation or contractors to the City for the removal of debris and steel. The East River at and in the vicinity of the project is mapped by the New York State Department of Environmental Conservation as a designated tidal wetland, specifically littoral zone. Wetland impacts associated with the Pier 6 marine-based operation, however, would not be anticipated to be significant. The facility is considered a temporary action that would continue only as long as debris removal actions from the WTC are underway, therefore long term impacts to aquatic resources would not occur.

Potential impacts associated with the loss of materials during the loading of barges are also expected to be minimal. Dredging activities within a portion of the site authorized under the original emergency authorization were completed in late September, therefore, impacts to aquatic resources have previously occurred. In addition, all loading operations are conducted in a manner to minimize or eliminate loss of materials into adjacent waters. The debris removal operations also involve little or no floatable material, as this is largely removed at the World Trade Center site. As part of the proposed closure of the Pier 6 transfer station operation, however, a detailed bathymetric survey of the facility site will be conducted. This survey would encompass the area occupied by the stationary barge-mounted cranes, as well as, mobile cargo barges. If areas are identified these would be further investigated and, if applicable, a plan to mitigate these areas will be developed in conjunction with the City of New York and the Contractor.

B. Project Description

20. Will the project produce operating noise exceeding the local ambient noise levels?

The Pier 6 transfer station will require the use of heavy construction equipment for offloading operations and trucks for the transport of construction debris and steel to the facility from the World Trade Center site. These operations may result in temporary, construction-related noise impacts. Trucks from the World Trade Center site would travel north along South Street, an existing New York City Department of Transportation designated local truck route to the Pier 6 facility.

Two sensitive receptors are located in the vicinity ofthe site, specifically Veterans Memorial Plaza and the ChildrenFirst Broad Street day care facility to the north. The Veterans Memorial Plaza is located 150 feet to the north of the Pier 6 facility, across six lanes of traffic

2

CITY_21MC100_0 13377776

NYC-WTC_000411627

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000411627Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000411602

Full SEQR environmental assessment form and guidance for project significance.

Similar indexed content

Compare copies and versions →