NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 13 pages

Full Environmental Assessment Form, SEQR (Appendix A)

Machine-extracted title · confidence 72%

SEQR Appendix A supporting data for environmental assessment process.

NYC-WTC_000411617–000411629
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

south access road that traverses the east side of Manhattan. Located further west are numerous multi-story, commercial office buildings that are part ofthe financial district within lower Manhattan! Numerous multi-story office building, as well as, interspersed retail establishments supporting these office buildings are located along Water Street, west of the site. South of the site are additional transportation related uses. The Battery Maritime Building, which includes facilities related to the Governors Island ferry, and the Staten Island (a/k/a Wliitehall) ferry terminal are located further south. South ofthe ferry terminal is a U.S. Coast Guard facility and Battery Park.

North of the site are several piers that include recreational and transportation uses. Indoor tennis facilities and the South Street Seaport are located north of the site. In addition, Pier 11 is the location of several commuter ferry operations. North-west of the site is the elevated FDR Drive, additional commercial office buildings and a fire station located along South Street.

8. Is the proposed action compatible with adjoining/surrounding land uses within a 1/4 mile?

Land uses in the immediate vicinity of the Pier 6 facility are primarily comprised of transportation uses (FDR Drive, East River piers, ferry operations) and commercial uses. Immediately south of the site is the Battery Maritime Building. Immediately west of the site is the FDR Drive, a major north-south right of way, and to the west of the highway are South Street and numerous commercial office buildings. North of the site are several existing piers and the continuation of a pedestrian walkway.

The Pier 6 transfer station would generally be inconsistent with these uses. The Pier 6 facility, however, would not be a long term use and is considered a construction-related, temporairy activity. The facility would only operate until the World Trade Center debris removal activities have been completed. Upon the completion of these activities, the facility would be closed and the site restored to its previous condition.

4

CITY_21MC100_0 13377778

NYC-WTC_000411629

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000411629Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000411602

Full SEQR environmental assessment form and guidance for project significance.

Similar indexed content

Compare copies and versions →