More than 200,000 tons of steel and 425,000 cubic yards of concrete were used in the construction of the WTC complex. One WTC
(North Tower) was completed in December of 1970 and Two WTC (South Tower) was completed in January of 1972. The federal
regulations restricting the use of asbestos in concrete and other construction material began to be enforced in the early 197O's
Although asbestos gives concrete a much higher tensile strength, asbestos fibers are known to have caused such diseases as
Asbestosis and Mesotfielioma, as well as lung cancer, when inhaled. These asbestos fibers are most hazardous when they are in a
friable or pulverized state.
The U.S. Environmental Protection Agency (EPA) - Asbestos Hazard Emergency Response Act (AHERA), Section 206 of Toxic
Substance Contol Act (TSCA) states that it's legal function is to provide for the establishment of Federal regulations which require
inspection for ashesto.s-containing material and implementation of appropriate response actions with respect to asl)eslos-containing
material in the Nation's schools in a safe and complete manner and to mandate safe and complete periodic reinspection of school
buildings following response actions, where appropriate. A memorandum from R. Radhakrshnen, P.E. from the City of New York,
Department of Environmental Protection, dated September 14.2001, gave guidance to building owners on procedures for clean-up of
asbestos containing materials (see attached document). This memorandum and the U.S. Environmental Protection Agency (EPA) -
Asbestos Hazard Emergency Response Act (AHERA), Section 206 of the Toxic Subs:ance Control Act (TSCA) were used as a basis
for the necessary procedures to be perfonried at each school.
School Construction Authority (SCAl
School Construction Authority was responsible for the coordination and construction management of the contractors on behalf of BoE.
The School Construction Authority (SCA) acts on behalf of the New York Board of Education (BoE) to manage all major construction,
repairs, rehabilitation and clean up of all New York City schools. Costs associated with the work performed by SCA consists of regular
time labor ($2,139.05), including the New York City regular lime fringe benefit rate for non-uniform employees of 44.66% ($955.30).
Total incurred cost for regular time labor is $3,094.35. Costs associated with the overtime for labor for SCA ($6,030 13), including the
New York City overtime fringe benefit rate for non-uniform employees of 10.73% ($647.04). Total incurred cost for overtime labor is
$6,677.17.
Air Tech Lab, Inc.
Air Tech Lab, Inc. conducted interior clean up at PS/IS 89 from January 3 to January 10, 2002. This cleanup work consisted of an
intensive clean up of visible dust utilizing wet wipe methods and HEPA vacuumed the 1 st, 2nd. 3rd, 4th, and 5th floors and the 6th floor
mechanical and boiler room. Clean-up performed by KISS Construction cost $448,999.74. Invoice from Air Tech Lab is included in
"Back Up Do Not Scan".
V & R Mechanical Inc.
V & R Mechanical was retained by SCA to clean the HVAC system in PS/IS 89. This was performed to remove all dust and debris
potentially contaminated with asbestos and to prevent asbestos containing material to spread throughout the building. All work
performed under this contract was in accordance to the National Air Duct Cleaning Association (NADCA) Standard 92-01 Costs
associated with HVAC cleaning performed by V & R total $385,000.00. In addition, costs were also incurred for the labor and materials
required to remove and re-install existing wall unit ventilators in order to adequately clean the system ($70,000) and to remove existing
insulation impacted by dust and debris and replace with new insulation ($7,500). Total costs associated with the work performed by V &
R is $463,500 00. Invoice from V & R is included in "Back Up Do Not Scan",
Corinthian Construction
Corinthian Construction was retained to remove all debris and dust from the exterior facade of the building, courtyards and playgrounds.
The exterior facade of the building included all masonry and windows. In addition, the dust an debris that accumulated in the courtyards
and on the playground was power washed. Cleaning to the facade of the building, courtyards and playground, conducted by Corinthian,
cost $231,500.00. invoice from Corinthian is included in "Back Up Do Not Scan ”.
in addition, Corinthian also performed clean up of the roof of PS/IS 89. Because of the fine particulate of the dust, all stones and
insulation were removed from the roof to expose the roof membrane. The roof membrane was washed thoroughly of all dust and
debris, and new installation, filter fabric and stone were replaced to its state prior to the event. Costs asociated with this work total
$68,640.
In addition, Corinthian inspected and repaired previously damaged areas including the membrane, flashings, and pitch pockets. Page
53 Of FEMA's Public Assistance Guide states that "only repairs to disaster-related damage are eligible". These damages were not a
direct result of the collapse of WTC, and therefore, the inspection and tepair of these damages are not eligible for funding by FEMA.
Ineligible costs associated with the inspection and repair of the pre-existing damages total $3,860,
Total costs incurred from services provided by Corinthian is $300,140.
New York Environmental
During the clean-up and remediation project at PS/IS 89, New York Environmental was retained to conduct quality control asbestos
project monitoring and analytical services. The transmission electron microscopy (TEM) samples were collected in the same locations
as the samples being collected by ATC Associates. These samples were then analyzed by Athenica Environmental Services, Inc.
Sampling and analysis v^ras performed in accordance to AHERA regulation. Quality control air monitoring and analytical services
provided by New York Environmental totaled $3,792.50.
ATC Associates, Inc.
ATC Associates monitored the clean up activities at PS/IS 89 and, upon satisfactory visual inspection, collected phase contrast
microscopy (PCM) following all applicable Federal, State and New York City rules and regulations. A final inspection was performed
using aggressive air sampling in conformance with the methodology of the AHERA Final Rule (40 CFR Part 763). The samples were
analyzed for transmission electron microscopy (TEM). Work performed by ATC total $28,100.
TDX Construction Corporation
The TDX Construction Corporation was retained by SCA to perform construction management and oversight duties at PS/iS 89 to
coordinate the contractual duties and to insure that work performed by contractors met the proposed scope of work and professional
quality. TDX was also responsible to insure that the work performed adhered to applicable regulations. Costs associated with
construction management and inspection by TDX totaled $54,273.
PREPARED BY: Daniel Martin Project Officer
FEMA Form 9O^9iA. SEP 98
CITY_21MC100_012692603
NYC-WTC_000385741
OCR can misread numbers and units. Confirm readings against the page image before using them.