NYC-WTC_000359490
Narrative on asbestos considerations in WTC construction materials.
14 shared non-person entities · 1 shared topics · similarity 0.972
machine-extracted · confidence unavailable · Check page ↗Project worksheet with declaration and category for WTC asbestos context.
NYC-WTC_000359494–000359496OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
FEDERAL EMERGENCY MANAGEMENT AGENCY O.M.B. No. 3067-0151 PROJECT WORKSHEET - Narrative Sheet Expires April 30,2001
DECLARATION NO: I PROJECT NO. FIPS NO. I DATE ] CATEGORY FEMA- 1391 -DR- NY | 061-51000-22 I 04/15/02 I E APPLICANT COUNTY New York City, Board of Education New York NARRATIVE
More than 200,000 tons ot steel and 425,000 cubic yards of concrete were used in the construction of the WTC complex. One WTC (North Tower) was completed in December of 1S70 and Two WTC (South Tower) was completed in January of 1972. The federal regulations restricting the use of asbestos in concrete and other construction material began to be erfotced in the early 1970's. Aithcugh asbestos gives concrete a much higher tensile strength, asbestos fibers are known to have caused such (jjeeases as Asbestosis and Mesclhelioma, as well as lung cancer, when inhaled. These asbestos fibers are most hazardous when they are in a friable or pulverized state.
The U.S. Environmenisl Protection Agency (EPA) - Asbestos Hazard Emergency Response Act (AHERA), Section 206 of Toxic Substance Cor^tol Act (1SCA) stales that it’s legal function is to provide tor the establishment of Federal regulations which require inspeclion for asbestos-containing material and implementation ot appropriate response actions with respect to asbestos-containing msterial in the Nation's schools in a sale and complete manner and tc mandate safe and complete periodic reinspectior of school buildings following response actions, where appropriate. A memorandum from R. Radhakrshnen, P.E. from the City of New York, Department of Environmental Prelection, dated September 14, 2001. gave guidance to building owners on procedures for clean-up of asbestos containing rriaterials (see attached document). This memorandum and the U.S. Environmental Protection Agency (EPA) • Asbestos Hazard Emergency Response Act (AHERA). Section 206 of the Toxic Substance Control Act (TSCA) were used as a basis for the necessary procedures to be performed at each school.
School Construction Authority (SCA1 School Construction Authority was responsible lor the coordination and construction management of the contractors on behalf of boE. T he school Construction Auinoriiy (SCA) acts on behaii ot the New York beard ot Educaiion (BoE) to manage an major construction, repairs, rehabilitation end dean up of sH New York City schools. Costs associated with the work performed by SCA consists of regular lime labor (£2,139.05), inctudinc the New York City regular time fringe benefit rate for non-uniferm employees of 44.66% (5956.30). T vial iutui ec toil lur regular lime labor is 53,094.36. Custs essocieied with the ovenime foi labor for SCA (56,030.13), including the New York City overtime fringe benefil rale for non-uniform employees of 10.73% ($647.04), Total incurred cost for overtime labor is 56,677.17.
Air Tech Lab, tnc. Air Tech Lab. Inc. conducted irneiior clear, up et PS/lS 69 from Jenuery 3 lo January 10, 2002. This cleanup work consisted of an tntentivG clean up of visible dust utilizing wet wipe methods and HEPA vacuumed the l6t, 2nd, 3rd, 4th. and Sth floors end the 6lh floor mechanical and boiler rocm. Clean-up pertorrned by KISS Construction cost $448,999.74. Invoice from Air Tech Lab is included in "Back Up Do Not Scan"? - ------ ——“——------------- ——
V & R Mechanical Inc. V & R Mechanics! was retained by SCA to clean the HVAC system in PS/IS 8€. This was performed lo remove all dust and debris potentially contaminated with asbestos and to prevent asbestos containing material to spread throughout the buildirrg. All work performed under this contract was in accordance lo the National Air Dud Cleaning Association (NADCA) Standard 92-01. Costs associated with HVAC cleaning performed by V & R total $385,000.00. In addition, costs were also incurred for the labor and materials required to remove end le-instsll existing wall unit ventilators in order tc adequately clean the system ($70,000) and to remove existing insulation impeded by dust anc debris and replace with new insulation ($7,600). Total costs associated with the work pertorrned by V 6 R is 5463.500.00. Invoice from V & R is included in "Back Up Do Not Scan".
Corinthian Construction Corinthian Construction was leieined to remove all debris and dust from the exterior facade of the building, courtyards and playgrounds. The exterior facade of the building included ell masonry end windows, In eddition, the dust en debris that accumulated in the courtyards ano on the pleygiound was power washed. Cleaning to the facade of the building, courtyards and playground, conducted by Corinthian, cost $231,500.00. Invoice from Corinthian is included in "Back Up Do Not Scan".
In addition, Corinthian also pertorrned dean up of the roof of PS/lS 89. Because of the fine particulate of the dust, all stones and insulation were removed from tne roof to expose the root membrane. The roof membrane was washed thoroughly of ell dust and debris, and new tnsiailatlon, titer fabric and store were replaced to its slate prior to the event. Costs asocialed wiih this work tolai $68,640.
In addition, Corinthian inspected eno repaired previously damaged areas including the membrane, flashings, and pitch pockets. Page 53 of FEMA’s Public Assistance Guide steres that ‘only repairs to disaster-related damage are eligible". These damages were not a direct resuH of the collapse cf WTC, and therefore, the inspection and repair of these damages are not eligible for funding by FEMA. Ineligible costs associaled with the inspection arid repair of the pre-existing damages total 53,860.
Total costs incurred frcm services provided by Corinthian is 5300.140.
New York Environmental During the clean-up and remedtation project al PS/lS 89, New York Environmental was retained to conduct quality control asbestos project monitoring end analytical services. The transmission electron microscopy (TEM) samples were collected in the same locations as the samples being collected by ATC Associates. These samples were then analyzed by Athenica Environmental Services, Inc. Sampling end analysis was performed in accordance to AHERA regulation. Quality control air monitoring and analytical services provided by New York Environmental totaled $3,792,50.
ATC AssociaJes. Inc. ATC Associates monitored the clean up activities at PS/IS 89 and. upon satisfactory visual inspection, collected phase contrast microscopy (PCM) following all applicable Federal, Stale and New York City rules and regulations. A final inspection was performed using aggressive air sampling in conformsnee with the methodology of the AHERA Final Rule (40 CFR Part 763). The samples were analyzed for transmission electron microscopy (TEM). Work performed by ATC total $28,100.
TDX Construction Cornoration The TDX Construction Corporat'on was retained by SCA lo perform construction msnagemenf and oversight duties al PS/lS 89 to coordinait iht contraciuai autiei sne to nsure ths’work pertoimec bv contieciorj met the proposec scopr ci work and professional quality. TDX was also responsible to insure that the work penormea adhered to applicable regulations. Costs associated with consiiuction management and inspection by TDX totaled $54,273.
PREPARED BY: Daniel Martin Project Officer FEMA Form 90-91A, SEP 98
CITY_21MC100_007213918
NYC-WTC_000359495
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000359490
Narrative on asbestos considerations in WTC construction materials.
14 shared non-person entities · 1 shared topics · similarity 0.972
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000359491
Project worksheet with declaration and category for WTC asbestos context.
12 shared non-person entities · 1 shared topics · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000359489
Declaration and project data for WTC asbestos context.
10 shared non-person entities · 1 shared topics · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000359487
PAPERWORK BURDEN DISCLOSURE for FEMA project worksheet.
7 shared non-person entities · 1 shared topics · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000251589
FEMA project worksheet and paperwork burden disclosure for disaster-related work.
12 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000385741
FEMA worksheet re: WTC and asbestos regulations with sample data.
14 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000411637
FEMA project worksheet for NY disaster with cost estimates and CFR references.
13 shared non-person entities · 1 shared topics · similarity 0.972
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000219967
Federal Emergency Management Agency paperwork worksheet declaring project details and burden disclosure for disaster relief efforts dated September 30, 2001.
9 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000385738
Project worksheet with declaration, project, and FIPS details.
7 shared non-person entities · 1 shared topics · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000385737
FEMA 1391-DR-NY worksheet; declaration, project, and narrative overview.
6 shared non-person entities · 1 shared topics · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000243504
FEMA declaration/project worksheet for WTC asbestos regulations and materials.
11 shared non-person entities · 1 shared topics · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000219966
Federal Emergency Management Agency worksheet documenting disaster declaration and narrative regarding asbestos risks in New York City school construction materials.
11 shared non-person entities · 1 shared topics · similarity 0.955
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000385741
FEMA worksheet re: WTC and asbestos regulations with sample data.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000359490
Narrative on asbestos considerations in WTC construction materials.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000251589
FEMA project worksheet and paperwork burden disclosure for disaster-related work.
Similarity score 0.981 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000219966
Federal Emergency Management Agency worksheet documenting disaster declaration and narrative regarding asbestos risks in New York City school construction materials.
Similarity score 0.981 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000359486
FEMA project worksheet narrative on WTC asbestos context.
Similarity score 0.973 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000359491
Project worksheet with declaration and category for WTC asbestos context.
Similarity score 0.968 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
FEMA project worksheet and paperwork burden disclosure for disaster-related work.
Similar indexed content
NYC-WTC_000385741
FEMA worksheet re: WTC and asbestos regulations with sample data.
Similar indexed content
NYC-WTC_000359490
Narrative on asbestos considerations in WTC construction materials.
Similar indexed content
FEMA project worksheet for NY disaster with cost estimates and CFR references.
Similar indexed content
NYC-WTC_000359491
Project worksheet with declaration and category for WTC asbestos context.
Similar indexed content