NYC 9/11 Public Portal Document
FEDERAL EMERGENCY MANAGEMENT AGENCY O.M.B. No. 3067-0151 PROJECT WORKSHEET - Narrative Sheet Expires April 30. 2001
DECLARATION NO: PROJECT NO. FIPS NO, DATE CATEGORY FEMA- 1391 -DR- NY 061-51000-22 02/27/02 E APPLICANT COUNTY New York City, Board of Education New York NAPPA TIVE
More than 200,000 tons of steel and 425,000 cubic yards of concrete were used in the construction of the WTC complex. One WTC (North Tower) was completed in December of 1970 and Two WTC (South Tower) was completed in January of 1972. The federal regulations restricting the use of asbestos in concrete and other construction material began to be enforced in the early 197O's. Although asbestos gives concrete a much higher tensile strength, asbestos fibers are known to have caused such diseases as Asbestosis and Mesothelioma, as well as lung cancer, when inhaled. These asbestos fibers are most hazardous when they are in a friable or pulverized slate.
The U.S. Environmental Protection Agency (EPA) - Asbestos Hazard Emergency Response Act (AHERA), Section 206 of Toxic Substance Contol Act (TSCA) states that it's legal function is to provide for the establishment of Federal regulations which require inspection for asbestos-containing material and implementation of appropriate response actions with respect to asbestos-containing material in the Nation's schools in a safe and complete manner and to mandate safe and complete periodic reinspection of school buildings following response actions, where appropriate. A memorandum from R. Radhakrshnen. P.E. from the City of New York, Department of Environmental Protection, dated September 14, 2001, gave guidance to building owners on procedures for clean-up of asbestos containing materials (see attached document). This memorandum and the U.S. Environmental Protection Agency (EPA) - Asbestos Hazard Emergency Response Act (AHERA). Section 206 of the Toxic Substance Control Act (TSCA) were used as a basis for the necessary procedures to be performed at each school.
School Conslruclion Authority (SCA) I School Construction Authority was responsible for the coordination and construction management of the contractors on behalf of BoE. The School Construction Authority (SCA) acts on behalf of the New York Board of Education (DoE) to manage all major construction, repairs, rehabilitation and clean up of all New York City schools. Costs associated with the work performed by SCA consists of regular time and overtime for labor totals $13,626.90. New York City's fringe benefit rate for non-uniform employees is 10.73%, totaling $1,462.17. Total incurred cost is $15,069.07,
KISS Construction. Inc. KISS Construction, Inc. conducted clean up at PS 234 from October 4 to October 7,2001. This cleanup work consisted of asbestos abatement of the facility following the period the school was being used as a relief center. Clean-up performefl by KISS Construction cost $156,789.50. Invoice from KIES Construction is included in "Back Up Do Not Scan”.
PAL Environmental Safety Corporation PAL Environmental Safety Corporation was retained by SCA to conduct exterior and interior clean up of PS 234. Dust and debris within the building was considered 1o be potentially contaminated with asbestos. Interior remediation of the facility was performed in accordance to AHERA regulations. Scope of work performed by PAL for the interior remediation included labor, materials, equipment, OSHA monitoring and vjsste disposals. Man lifts were used to facilitate the power washing of the exterior of the building with cas pressure washers. Work was performed as a non-asbestos containing material clean-up because emissions and exposure during the activity would be minima! because the operation was conducted in an "open’ environment. Interior and exterior cleaning performed by PAL Environmental cost $455,620.66. Invoice from PAL Environmental is included in "Back Up Do Not Scan*.
Citywide Environmental Services. LLC Citywide Environmental Services, LLC was retained by SCA to clean the HVAC system in PS 234. This was performed to remove all dust and debris potentially contaminated with asbestos and to prevent asbestos containing material to spread throughout the building. All work performed under this contract was in accordance to AHERA regulations. Costs associated with HVAC cleaning performed by Citywide Environmental was $371,530.66. Invoice from Citywide Environmental is included in “Back Up Do Not Scan".
Ccrinlhian ConstructiOJI Corinthian Construction was retained to remove all debris and dust from the roof of the building, Because of the fine particulate of the dust, all stones and insulation were removed from the roof to expose the roof membrane. The roof membrane was washed thoroughly of all dust and debris, and new installation, filter fabric and stone were replaced to its state prior to the event. Roof cleaning conducted by Corinthian cost $ 159.600.00. Invoice from Corinthian is included in "Back Up Do Not Scan”.
Taylor Environmental Group. Inc, During the clesn-up and remediation project at PS 234, Taylor Environmental Group, Inc, was retained to conduct quality control asbestos project monitoring and analytical services. Prior to the collection of TEM ait samples, Taylor Environmental conducted visual inspections to identify if there was a presence of visible dust and debris. Quality control air monitoring and analytical services provided by Taylor Environmental totaled $2,100.00, Invoice from Taylor Environmental is included in "Back Up Do Not Scan",
Warren & Panzer Engineers Warien & Panzer Engineers conducted aggressive air sampling of ihe basement, 1st floor. 2nd floor, 3rd floor, the mechanical room and the ventilation system of PS 234. The samples analyzed for transmission electron microscopy (TEM). Work performed by Warren and Panzer total $71,610.34. A copy of the invoice for work performed by Warren & Panzer Engineers was not obtained from
TDX-Bccorn Joint Venture The TDX-Besom Joinf Venture was retained by SCA to perform construction msnagement and oversight duties at P.S. 234 to coordinate the coniractual duties and to insure that work performed by contractors met the proposed scope of work and professional quality. TDX-Becom was also responsible to insure that the v/ork performed adhered to AHERA regulations. Costs associated with construction management and inspection by TDXZBecom totaled $35,730.23. Invoice from TDX/Becom is included in "Back Up Do Not Scan".
PREPARED BY: Dan Martin Project Officer FEMA Form 90-91A, SEP 98
CITY_21MC100_007213910
NYC-WTC_000359492
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000359494
Project worksheet with declaration and category for WTC asbestos context.
12 shared non-person entities · 1 shared topics · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000359488
FEMA project worksheet narrative on WTC construction materials.
16 shared non-person entities · 1 shared topics · similarity 0.953
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000359487
PAPERWORK BURDEN DISCLOSURE for FEMA project worksheet.
10 shared non-person entities · 1 shared topics · similarity 0.951
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000251589
FEMA project worksheet and paperwork burden disclosure for disaster-related work.
23 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000385739
Narrative describing WTC steel and concrete usage and asbestos regulations.
19 shared non-person entities · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000243504
FEMA declaration/project worksheet for WTC asbestos regulations and materials.
18 shared non-person entities · 1 shared topics · similarity 0.967
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000219966
Federal Emergency Management Agency worksheet documenting disaster declaration and narrative regarding asbestos risks in New York City school construction materials.
19 shared non-person entities · 1 shared topics · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000385738
Project worksheet with declaration, project, and FIPS details.
12 shared non-person entities · 1 shared topics · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000385737
FEMA 1391-DR-NY worksheet; declaration, project, and narrative overview.
11 shared non-person entities · 1 shared topics · similarity 0.953
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000385741
FEMA worksheet re: WTC and asbestos regulations with sample data.
13 shared non-person entities · 1 shared topics · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279702
FEMA disaster-1391 summary of project costs and damage facility at PS 234, 292 Greenwich Street.
9 shared non-person entities · similarity 0.950
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000195787
Administrative form documenting a Federal Emergency Management Agency disaster declaration and project completion status in December 2001.
9 shared non-person entities · similarity 0.949
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000385739
Narrative describing WTC steel and concrete usage and asbestos regulations.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000251589
FEMA project worksheet and paperwork burden disclosure for disaster-related work.
Similarity score 0.987 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000243504
FEMA declaration/project worksheet for WTC asbestos regulations and materials.
Similarity score 0.985 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000385741
FEMA worksheet re: WTC and asbestos regulations with sample data.
Similarity score 0.970 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000243516
FEMA project worksheet for WTC construction materials context and asbestos discussion.
Similarity score 0.967 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000411637
FEMA project worksheet for NY disaster with cost estimates and CFR references.
Similarity score 0.959 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
FEMA project worksheet and paperwork burden disclosure for disaster-related work.
Similar indexed content
NYC-WTC_000359494
Project worksheet with declaration and category for WTC asbestos context.
Similar indexed content
NYC-WTC_000385739
Narrative describing WTC steel and concrete usage and asbestos regulations.
Similar indexed content
FEMA declaration/project worksheet for WTC asbestos regulations and materials.
Similar indexed content
NYC-WTC_000219966
Federal Emergency Management Agency worksheet documenting disaster declaration and narrative regarding asbestos risks in New York City school construction materials.
Similar indexed content