NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 3 pages

FEMA project worksheet, Feb 2002, NY BOE

Machine-extracted title · confidence 34%

Project worksheet with declaration and category for WTC asbestos context.

NYC-WTC_000359491–000359493
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

FEDERAL EMERGENCY MANAGEMENT AGENCY O.M.B. No. 3O67-O1S1 PROJECT WORKSHEET Expires April 30,2001

----------- PAPERWORK BURDEN DISCLOSURE NOTICE Public reporting burden for this form is estimated Io average 30 minutes. The burden estimate includes the time for reviewing instructions, searching existing data sources, gathering and maintaining the needed data, and completing and submitting the forms. You are not required to respond to this collection of information unless a valid 0MB control number is displayed in the upper right corner of the forms. Send comments regarding the accuracy of the burden estimate and any suggestions for reducing the burden to; Information Collection Management, Federal Emergency Management Agency, 600 C Street, SW, Washington, DC 20472, Paperwork Reduction Project (3067-0151). NOTE: Do not send your completed form to this address._______ __________________ DECLARATION NO: PROJECT NO, r FIPS NO. DATE CATEGORY FEMA- 1391 -DR- NY 061-51000-22 02/27/02 E DAMAGE FACILITY WORK COMPLEI E AS OF: Public School 234 School Clean Up________ 10/31/01 ; 100% APPLICANT COUNTY New York City, Board of Education_________ New York LOCATION LATITUDE LONGITUDE 292 Greenwich Street, New York, NY 10282 DAMAGE DESCRIPTION AND DIMENSIONS

The collapse of the World Trade Center (WTC) on September 11, 2001 caused a massive cloud of concrete and dust to impact neighboring buildings blocks away from Ihe World Trede Center complex. Public School 234 (PS 234) is located at 292 Greenwich Street, approximately two-tenths of a mile from One WTC. The dust cloud from the collapse of One WTC directly impacted the PS 234 facility and covered the building with a layer of dust. Dust and debris entered the building through the ventilation system and through open windows and doors. In addition, PS 234 was also used as a relief center to provide equipment, food, shelter, showers, chance of clothes, and supplies for the emergency rescue and recovery workers. Work to clean PS 234 was perfonned from September 25, 2001 till October 31, 2001.

SCOPE OF WORK

Work complete consists o1 the expenses incurred by the New York City, Board of Education (BoE) for the work performed by the School Construction Authority (SCA). SCA will be submitting all costs to Ihe BoE for reimbursement. These costs include the contractual work for remediation and restoration of PS 234 on the basis of design, capacity and function of the facility prior to the disaster and in conformity with applicable standards.

School Construction Authority was responsible for the coordination and construction management of the contractors performing work at PS 234 related to the collapse of WTC. Costs associated with Ihe work performed by SCA consists of regular lime and overtime for labor totals $13,626.90. New York City's fringe benefit rale for non-uniform employees is 10.73%. totaling $1,462.17. Total incurred cost for labor is $15,089.07.

PAL Environmental Safety Corp. (PAL) and KISS Construction performed clean up and remediation operations of the interior of the building, as well as pressure washing the exterior. Citywide Environmental Services LLC cleaned the HVAC system of dust anc debris. Corinthian Construction Co, Inc. was responsible of clearing debris from the roof of the school. Gravel was removed from the roof, the roof membrane was pressure washed, and new gravel was placed on the roof, Taylor Environmental Group. Inc. conducted quality control air monitoring and analytical services, as well as visual inspections to determine the presence of fine paniculate dust. Warren & Panzer Engineers (Warren & Panzer) conducted aggressive sampling and transmission electron microscopy (TEM) analysis of several floors and the HVAC unit. TDX/Becom performed construction oversight of all contractual activities to insure quality of work. Total contractual costs submitted to BoE from SCA for this project worksheet is $1,252,981.39.

See Narrative for detailed description of the work performed by SCA and each contractor, as well as their respective costs.

Total costs associated with this project worksheet for contractual work and labor is $1,268,070.46.

Does the Scope of Work change the pre-disaster condition al sile? □ Yes ta NO Special Consideration issues included? [X] Yes Q No Hazard Mitigation proposal included? | | Yes £X] No Is there insurance coverage on facility? □ Yes [J] No PROJECT COST ITEM CODE NARRATIVE quantity/unit UNIT PRICE COST 1 9003 Contract - School Conslruclion Authority 1 /___ LS $1,252,981.39 $ 1,252,981,39 2 9007 Tabor - SCA with fringe benefit rale 1 / LS $ 15.089.07 $ 15,089,07

Total $ 1,268,070,46 PREPARED BY; Dan Marfin REMARKS; Project Officer FEMA Form 90-91, SEP 98

CITY_21MC100_007213909

NYC-WTC_000359491

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000359491Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

FEMA Project Worksheet · page 1

NYC-WTC_000251589

FEMA project worksheet and paperwork burden disclosure for disaster-related work.

Similarity score 0.983 (not a probability)

machine-extracted · confidence unavailable · Check page ↗

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000251589

FEMA project worksheet and paperwork burden disclosure for disaster-related work.

Similar indexed content

NYC-WTC_000243504

FEMA declaration/project worksheet for WTC asbestos regulations and materials.

Similar indexed content

Compare copies and versions →