FEMA project worksheet narrative, 2001

Machine-extracted title · confidence 28%

Narrative describing WTC steel and concrete usage and asbestos regulations.

NYC-WTC_000385739
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

PROJECT WORKSHEET - Narrative Sheet Expires April 30, 2001

DECLARATION NO: PROJECT NO. FIPS NO. DATE CATEGORY FEMA- 1391 -DR- NY 061-61000-22 02/27/02 E APPLICANT COUNTY New York City, Board of Education New York NARRATIVE

More than 200,000 tons of steel and 425,000 cubic yards of concrete were used in the construction cf the WTC complex. One WTC (North Tower) was completed in December of 1970 and Two WTC (South Tower) was completed in January- of 1972. The federal regulations restricting the use of asbestos in concrete and other construction material began to be enforced in the early 197O’s. Although asbestos gives concrete a much higher tensile strength, asbestos fibers are known to have caused such diseases as Asbestosis and Mesothelioma, as well as lung cancer, when inhaled. These asbestos fibers are most hazardous when they are in a friable or pulverized state.

The U.S. Environmental Protection Agency (EPA) - Asbestos Hazard Emergency Response Act (AHERA), Section 206 of Toxic Substance Contol Act (TSCA) states that it's legal function is to provide for the establishment of Federal regulations which require inspection fo' asbestos-containing material and Implementation of appropriate response actions with respect to asbestos-containing material in the Nation's schools in a safe and complete manner and to mandate sate and complete periodic reinspection of school buildings following response actions, where appropriate. A memorandum from R. Radhakrshnen, P.E. from the City of New York. Department of Environmental Protection, dated September 14, 2001, gave guidance to building owners on procedures for clean-up of asbestos containing materials (see attached document). This memorandum and tne U.S. Environmental Protection Agency (EPA) - Asbestos Hazard Emergency Response Act (AHERA), Section 206 of the Toxic Substance Control Act (TSCA) were used as a basis for the necessary procedures to be performed at each school.

Schoo} Construction Authority fSCA) School Construction Authorily was responsible for the coordination and construction management of the contractors on behalf of BoE. The School Construction Authority (SCA) acts on behalf of the New York Board of Education (BoE) to manage all major constructor repairs, rehabilitation and clean up of all New York City schools. Costs associated with the work performed by SCA cogsists-Oh""-*®^ regular time and overtime for labor totals $13,626.90. New York City's fringe benefit rate for non-uniform employeesi? 10.73%, totaling $1,462.17. Total incurred cost is $15,089.07. ''s-., _ , ___

KfSS Construction, Inc. KISS Construction. Inc. conducted clean up at PS 234 from October 4 to October 7, 2001. This cleanup work consisted of asbestos abatement of the facility following the period the school was being used as a relief center. Clean-up perfonred by KISS Construction cost SI 56,789.60. Invoice from KISS Construction is included in "Back Up Do Not Scan".

PAL Environmental Safety Corporation PAL Environmental Safety Corporation was retained by SCA to conduct exterior and interior clean up of PS 234. Dust and debris within the building was considered to be potentially contaminated with asbestos. Interior remediation of the facility was performed In accordance to AHERA regulations. Scope of work performed by PAL for the interior remediation included labor, materials, equipment, OSHA monitoring and waste disposals. Man lifts were used to facilitate the power washing of the exterior of the building with gas pressure washers. Work was performed as a non-asbestos containing material clean-up because emissions and exposure during the activity would be minimal because the operation was conducted in an "open" environment. Interior and exterior cleaning performed by PAL Environmental cost $455,620.66. Invoice from PAL Environmental is included in "Back Up Do Not Scan".

Citywide Environmental Services. LLC Citywide Environmental Services, LLC was retained by SCA to clean the HVAC system in PS 234. This was performed to remove all dust and debris potentially contaminated with asbestos and to prevent asbestos containing material to spread throughout the building. All work performed under this contract was in accordance to AHERA regulations. Costs associated with HVAC cleaning peifunned by Citywide Environmental was $371,530.66. Invoice from Citywide Environmental is included in "Back Up Do Not Scan".

Corinthisn Construction Corinthian Construction was retained to remove all debris and dust from the roof of the building. Because of the fine particulate of the dust, all stones and insulation were removed from the roof to expose the roof membrane. The roof membrane was washed thoroughly of all dust and debris, and new installation, filter fabric and stone were replaced to its state prior to the event. Roof cleaning conducted by Corinthian cost $159,600.00. Invoice from Corinthian is included in "Back Up Do Not Scan".

Taylor Environmftntal Group. Inc During the clean-up and remediation project at PS 234, Taylor Environmental Group, Inc. was retained to conduct quality control asbestos project monitoring and analytical services. Prior to the collection of TEM air samples, Taylor Environmental conducted visual inspections to identify if there was a presence of visible dust and debris. Quality control air monitoring and analytical services provided by Taylor Environmental totaled $2,100.00. Invoice from Taylor Environmental is included in "Back Up De Not Scan".

Warren & Panzer Engineers Warren & Panzer Engineers conducted aggressive air sampling of the basement, 1st floor, 2nd floor, 3rd floor, the mechanical room and the ventilation system of PS 234. The samples analyzed for transmission electron microscopy (TEM). Work performed by Warren and Panzer total $71,610.34. A copy of the invoice for work performed by Warren & Panzer Engineers was not obtained from SCA.

TDX*B6Coni Joint VsHture The TDX-Becom Joint Venture was retained by SCA to perform construction management and oversight duties at P.S. 234 to coordinate the contractual duties and to insure that work performed by contractors met the proposed scope of work and professional quality. TDX-Becom was also responsible to insure that the work performed adhered to AHERA regulations. Costs associated with construction management and inspection by TDX/Becom totaled $35,730.23. Invoice from TDX/Becom is included in "Back Up Do Not Scan".

PREPARED BY: Dan Martin Project Officer FEMA Form 90-91 A. SEP 98

CITY_21MC100_012692602

NYC-WTC_000385739

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000385739Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

FEMA Project Worksheet · page 2

NYC-WTC_000251589

FEMA project worksheet and paperwork burden disclosure for disaster-related work.

Similarity score 0.986 (not a probability)

machine-extracted · confidence unavailable · Check page ↗

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000243504

FEMA declaration/project worksheet for WTC asbestos regulations and materials.

Similar indexed content

NYC-WTC_000251589

FEMA project worksheet and paperwork burden disclosure for disaster-related work.

Similar indexed content

Compare copies and versions →