FEMA project worksheet, FEMA-1391-DR NY, 2002

Machine-extracted title · confidence 37%

FEMA project worksheet describing WTC construction and asbestos context.

NYC-WTC_000359485
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

FEDERAL EMERGENCY MANAGEMENT AGENCY O.M.B. No. 3067-0151 PROJECT WORKSHEET - Narrative Sheet Expires April 30, 2001

DECLAFLATION NO: PROJECT NO. FIPS NO. DATE CATEGORY FEMA- 1391 -DR- NY 061-51000-22 08/26/02 E APPLICANT COUNTY New York City, Board of Education New York

Narrative

More than 200.000 tons of steel and 425,000 cubic yards of concrete were used in the construction of the WTC complex. One WTC (North Tower) was completed in December of 1970 and Two WTC (South Tower) was completed in January of 1972. The federal regulations restricting the use of asbestos in concrete and other construction materials began to be enforced in the early l970's. Although asbestos gives concrete a much higher tensile strength, asbestos fibers are known to have caused such diseases as Asbestosis and Mesothelioma, as well as lung cancer, when inhaled. These asbestos fibers are most hazardous when they are in a friable or pulverized state.

A memorandum from R. Radhakrshnen, P.E. from the City of New York, Department of Environmental Protection, dated September 14, 2001, gave guidance to building owners on procedures for clean-up of asbestos containing materials (see attached document). The U.S. Environmental Protection Agency (EPA) - Asbestos Hazard Emergency Response Act (AHERA), Section 206 of Toxic Substance Control Act (TSCA) states that it's legal function is to provide for the establishment of Federal regulations which require inspection for asbestos-containing material and implementation of appropriate response actions with respect to asbestos-containing material in the Nation's schools in a safe and complete manner and to mandate safe and complete periodic reinspection of school buildings following response actions, where appropriate.

School Construction Authority (SCA) School Construction Authority was responsible for the coordination and construction management of the contractors on behalf of the BoE. The SCA acts on behalf of the BoE to manage all major construction, repairs, rehabilitation and clean up of all New York City schools. Costs associated with the work performed by SCA consists of regular time labor ($372.42), including the New York City regular time fringe benefit rate for non-uniform employees of 44.66% ($166.33). Total incurred cost for regular time labor is $538.75. Costs associated overtime labor for SCA ($324.13), including the New York City overtime fringe benefit rate for non-uniform employees of 10.73% ($34.88). Total incurred costs for overtime labor is $359.01.

Total SCA labor costs is S897.76.

Trio Asbestos Removal Corp. Clean-up and remediation of possible asbestos contaminated material, debris and dust were performed by Trio Asbestos Removal Corporation. Clean-up and remediation was performed on the fifth, fourth, third and sub-basement level. All dust and debris: such as towels, rags, suits, filters, gloves, mops, etc.; were disposed. Asbestos waste was disposed of in accordance to federal regulations. Total cost of contractual service provided by TRIO Asbestos Removal Corporation is $84,388.75. Invoice for work performed by Trio i; included.

Taylor Environmental Group, Inc. During the non-emergency, clean-up and remediation project at PS 150, Taylor Environmental Group, Inc. was retained to conduct asbestos project monitoring, air sampling and on-site analytical services. Prior to the collection of TEM air samples, Taylor Environmental conducted visual inspections to identify if there was a presence of visible dust and debris. A total of 33 ambient TEM air samples were collected and analyzed via the AHERA protocol. Taylor Environmental performed project monitoring, air sampling and analytical services at a total cost of $10,500.00. Invoice for work performed by Taylor is included.

PREPARED BY: Dan Martin Project Officer FEMA Form 90-91A, SEP 98 a

CITY_21MC100_007213893

NYC-WTC_000359485

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000359485Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

FEMA Project Worksheet · page 2

NYC-WTC_000251589

FEMA project worksheet and paperwork burden disclosure for disaster-related work.

Similarity score 0.971 (not a probability)

machine-extracted · confidence unavailable · Check page ↗

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000243516

FEMA project worksheet for WTC construction materials context and asbestos discussion.

Similar indexed content

NYC-WTC_000243504

FEMA declaration/project worksheet for WTC asbestos regulations and materials.

Similar indexed content

NYC-WTC_000251589

FEMA project worksheet and paperwork burden disclosure for disaster-related work.

Similar indexed content

Compare copies and versions →