MIBBB FEDERAL EMERGENCY MANAGEMENT AGENCY O.M.B. No. 3067-0151 PROJECT WORKSHEET - Narrative Sheet Expires April 30. 2001
DECLARATION NO: PROJECT NO. FIPS NO. DATE CATEGORY FEMA- 1591 -DR- NY 051-51000-22 02/27/02 E APPLICANT COUNPf New York City, Board of Education New York
N^rr^tiy^
Mote than 200.000 tons of steel and 425.000 cubic yards of concrete were used in the construction of the WTO complex. One WTC (North lower) was compleled in December of 1970 end Two WTC (South Tower) was completed in January of 1972. The federal regulations restricting the use of asbestos in concrete and other construction materials began to be enforced in the early 1970'6. Although asbestos gives concrete a much higher tensile strength, asbestos fibers are known to have caused such diseases as Asbestosis and Mesothelioma, as well as lung cancer, when inhaled. These ssbestos fibers are most hazardous when they ate in a friable or pclverized state.
A memotEndum Ircm R. Radhskrshnen. P.E frorr the City of New York. Depanmer; of Environmental Protection, dated September 14. 2001. gave goidance to building owners on procedures lor clean-up ol asbestos containing materials (see attached document). The U.S. Environmenlsl Prolection Agency lEPA)- Asbestos Hazard Emergency Response Act (AHERA). Section 206 of Toxic Substance Control Act (TSCAi steles that it's legal function is to provide for the establishment of Federal tegulaticns which require inspection for esbeslos-conteining material and mplementstion of appropriate response actions with respect to asbestos-containing material in the Nation's schools in a safe and complete rrianner ano to mandate sate ana complete periodic reinspection of scrioolTuildings following response actions, where appropriate.
School Constniclion Authorltv (SCA) School Construction Authority was responsible foi the coordination arid constructicn mansgement of the contractors on behalf of the BoE. The SCA acts on benslf of the BoE :o manage all major consirc/ciion. repairs, rehabilitation and clean jp of all New York City schools. Costs associated with the work performed by SCA consists of regular time labor (S6.4ld.64), including the New York City regular lime fringe benefit rate for non-unilorm employees of 44.66% ($2,864.78). Total incurred cost for regular lime labor is $£.279.42. Costs associaied overtime labor lor SCA ($19,666.44). including the New York City overtime fringe benebl rate for rron- untform employees of 10.737c (S2.029.70). Total incurrec costs for ovenime labor is $21.666.14. Total SCA labor costs is $30,947,56.
Trio Asbestos Removal Coro Clean-up and remedisiion of possible ssbestos coniaminsied material, debris snc dust were performed by Trio Asbestos Removal Corpoislion. Clesn-up snd remecistion was performed on the first, second, third ninth, tenth, end the 11 th (mechanicel room) floors, as well as me roof level, swimming pool, suditorium and basement. All dust snd debris: such as towels, rags, suits, filters, gloves. mops, etc.: were disposed. Asbestos waste was disposed of in accordance to federal reoulstions. Additional costs for erecting and dismantling scaffolding used in the auditorium and costs for steam cleaning carpeting in numerous sreas wi:hin the school were also encountered Total cost of contrgctusi service provided by TRIO Asbestos Removal Corporation is $603,176.80. Invoice for work pedormed by Trio is incluoed in “Back Up Do Not Scan".
KISS Construction, tnc. KISS Consiruction, Inc. conducted clean up at PS 234 from October 4 to October 7. 2001. This cleanup work was pertormed following the period the school was being usee as a relief center. Emergency clean-up executed by KISS Construction cost $527,449.41. Invoice for work performed by KISS is included in "Back Up Do Not Scan". h Y CorinlhiBn Construction Corinthian Construction was retained to remove all debris and dust irom the ioo< of the building. Because of the fine psrticulalG of the dust. £ll stones and insulaiion were removed from the roof to expose the roof membrane. The roof membrane was washed thoroughly of £11 dusi and debris, end new installslior. filter fabric and stone were replaced ic its state prior to the event. Exterior power washing and repeirs pertormed by Coiinihien Construction loieled S2l4.420.00. Invoice 1oi work pehormed by Corinthian is included in "BecK Up Do Not Seen”.
Taylor Environmental Group. Inc. During the non-emergency. clean-up and remediation project 31 Stuyvesant High School.Taylor Environmental Group. Inc. was retained to conduct asbestos project monitoring, air sampling and on-site analytical services. Prior to the collection of TEM air samples. Taylor Environmental ccnducied visual inspections to identify if there was a presence of visible dust and debris. As requested by SCA, aggressive atr sampling (echrrques were not performed at this facility. A total of 161 ambienf TEM air samples were collected and snalyred vis the AHERA protocol. Tsylor Environmental performed project monilofing. air sampling snd analyiical services at a total cost of $68,300.00. Invoice for work performed by Taylor is included in "Back Up Do Not Scan*.
ATC Associates This additional sampling was conducted for quality control by ATC Associates in coordination with the remediation project performed al Stuyvesant High School by TRIO Asbestos Removal and KISS Construction, Inc. The number of air samples taken and their locations were determined by Mr. Hamid Savoj ol the SCA. lEH Department. Samples were taken on September 30, October 3 and 4, 2001. Costs incurred from quality conlrol ait sampling performed by ATC Associates were 556,500.00. Invoice for work performed by ATC is included in "Back Up Do Not Scan".
TD-X/B-ecom The TDX/Becom Joint Venture was retained by SCA to perform power washing and cleaning of the exterior of Stuyvesanl High School. This conlraci included all union labor, msterjals and ecuipment as required to perform power washing of the masonry and windows of the building. A 131-foot boom-lift enc 8O-I0OI man lifts were used to reach the eleven story building, If flags developed in ihe concrete sidewalk c‘ a result of the comractual work, asphalt pavers or oraniie pavers, al! repair work would be peilormed on s times and micieiir' Le5!: Lest; asset laiec wit’, tcnsiiucuo' m.ar.cper^ren: anr inspeciiC' b\ TD>;'betcr^ tciaiec J if ddd.gc invoice foi work pertormed by TDX-becom rs inciuoeo m ’'Back Up Do Not Scan’'.
PREPARED BY; Dan Martin ProiGCt Officer FEMAForm9G-91A, SEP 98
CITY_21MC100_005170044
NYC-WTC_000359486
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000359485
FEMA project worksheet describing WTC construction and asbestos context.
7 shared non-person entities · similarity 0.945
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000359491
Project worksheet with declaration and category for WTC asbestos context.
9 shared non-person entities · similarity 0.943
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000359490
Narrative on asbestos considerations in WTC construction materials.
8 shared non-person entities · similarity 0.943
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000359494
Project worksheet with declaration and category for WTC asbestos context.
9 shared non-person entities · similarity 0.939
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000359488
FEMA project worksheet narrative on WTC construction materials.
8 shared non-person entities · similarity 0.937
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000243516
FEMA project worksheet for WTC construction materials context and asbestos discussion.
9 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000219966
Federal Emergency Management Agency worksheet documenting disaster declaration and narrative regarding asbestos risks in New York City school construction materials.
9 shared non-person entities · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000243504
FEMA declaration/project worksheet for WTC asbestos regulations and materials.
9 shared non-person entities · similarity 0.953
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000385741
FEMA worksheet re: WTC and asbestos regulations with sample data.
9 shared non-person entities · similarity 0.947
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000385739
Narrative describing WTC steel and concrete usage and asbestos regulations.
8 shared non-person entities · 1 shared topics · similarity 0.946
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000251589
FEMA project worksheet and paperwork burden disclosure for disaster-related work.
9 shared non-person entities · similarity 0.946
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000411637
FEMA project worksheet for NY disaster with cost estimates and CFR references.
9 shared non-person entities · similarity 0.929
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000243516
FEMA project worksheet for WTC construction materials context and asbestos discussion.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000219966
Federal Emergency Management Agency worksheet documenting disaster declaration and narrative regarding asbestos risks in New York City school construction materials.
Similarity score 0.978 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000251589
FEMA project worksheet and paperwork burden disclosure for disaster-related work.
Similarity score 0.977 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000243504
FEMA declaration/project worksheet for WTC asbestos regulations and materials.
Similarity score 0.976 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000359491
Project worksheet with declaration and category for WTC asbestos context.
Similarity score 0.974 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000385741
FEMA worksheet re: WTC and asbestos regulations with sample data.
Similarity score 0.973 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
FEMA project worksheet for WTC construction materials context and asbestos discussion.
Similar indexed content
NYC-WTC_000219966
Federal Emergency Management Agency worksheet documenting disaster declaration and narrative regarding asbestos risks in New York City school construction materials.
Similar indexed content
FEMA declaration/project worksheet for WTC asbestos regulations and materials.
Similar indexed content
NYC-WTC_000385741
FEMA worksheet re: WTC and asbestos regulations with sample data.
Similar indexed content
NYC-WTC_000385739
Narrative describing WTC steel and concrete usage and asbestos regulations.
Similar indexed content