FEMA project worksheet, FEMA-1591-DR NY, 2002

Machine-extracted title · confidence 37%

FEMA project worksheet narrative on WTC asbestos context.

NYC-WTC_000359486
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

MIBBB FEDERAL EMERGENCY MANAGEMENT AGENCY O.M.B. No. 3067-0151 PROJECT WORKSHEET - Narrative Sheet Expires April 30. 2001

DECLARATION NO: PROJECT NO. FIPS NO. DATE CATEGORY FEMA- 1591 -DR- NY 051-51000-22 02/27/02 E APPLICANT COUNPf New York City, Board of Education New York

N^rr^tiy^

Mote than 200.000 tons of steel and 425.000 cubic yards of concrete were used in the construction of the WTO complex. One WTC (North lower) was compleled in December of 1970 end Two WTC (South Tower) was completed in January of 1972. The federal regulations restricting the use of asbestos in concrete and other construction materials began to be enforced in the early 1970'6. Although asbestos gives concrete a much higher tensile strength, asbestos fibers are known to have caused such diseases as Asbestosis and Mesothelioma, as well as lung cancer, when inhaled. These ssbestos fibers are most hazardous when they ate in a friable or pclverized state.

A memotEndum Ircm R. Radhskrshnen. P.E frorr the City of New York. Depanmer; of Environmental Protection, dated September 14. 2001. gave goidance to building owners on procedures lor clean-up ol asbestos containing materials (see attached document). The U.S. Environmenlsl Prolection Agency lEPA)- Asbestos Hazard Emergency Response Act (AHERA). Section 206 of Toxic Substance Control Act (TSCAi steles that it's legal function is to provide for the establishment of Federal tegulaticns which require inspection for esbeslos-conteining material and mplementstion of appropriate response actions with respect to asbestos-containing material in the Nation's schools in a safe and complete rrianner ano to mandate sate ana complete periodic reinspection of scrioolTuildings following response actions, where appropriate.

School Constniclion Authorltv (SCA) School Construction Authority was responsible foi the coordination arid constructicn mansgement of the contractors on behalf of the BoE. The SCA acts on benslf of the BoE :o manage all major consirc/ciion. repairs, rehabilitation and clean jp of all New York City schools. Costs associated with the work performed by SCA consists of regular time labor (S6.4ld.64), including the New York City regular lime fringe benefit rate for non-unilorm employees of 44.66% ($2,864.78). Total incurred cost for regular lime labor is $£.279.42. Costs associaied overtime labor lor SCA ($19,666.44). including the New York City overtime fringe benebl rate for rron- untform employees of 10.737c (S2.029.70). Total incurrec costs for ovenime labor is $21.666.14. Total SCA labor costs is $30,947,56.

Trio Asbestos Removal Coro Clean-up and remedisiion of possible ssbestos coniaminsied material, debris snc dust were performed by Trio Asbestos Removal Corpoislion. Clesn-up snd remecistion was performed on the first, second, third ninth, tenth, end the 11 th (mechanicel room) floors, as well as me roof level, swimming pool, suditorium and basement. All dust snd debris: such as towels, rags, suits, filters, gloves. mops, etc.: were disposed. Asbestos waste was disposed of in accordance to federal reoulstions. Additional costs for erecting and dismantling scaffolding used in the auditorium and costs for steam cleaning carpeting in numerous sreas wi:hin the school were also encountered Total cost of contrgctusi service provided by TRIO Asbestos Removal Corporation is $603,176.80. Invoice for work pedormed by Trio is incluoed in “Back Up Do Not Scan".

KISS Construction, tnc. KISS Consiruction, Inc. conducted clean up at PS 234 from October 4 to October 7. 2001. This cleanup work was pertormed following the period the school was being usee as a relief center. Emergency clean-up executed by KISS Construction cost $527,449.41. Invoice for work performed by KISS is included in "Back Up Do Not Scan". h Y CorinlhiBn Construction Corinthian Construction was retained to remove all debris and dust irom the ioo< of the building. Because of the fine psrticulalG of the dust. £ll stones and insulaiion were removed from the roof to expose the roof membrane. The roof membrane was washed thoroughly of £11 dusi and debris, end new installslior. filter fabric and stone were replaced ic its state prior to the event. Exterior power washing and repeirs pertormed by Coiinihien Construction loieled S2l4.420.00. Invoice 1oi work pehormed by Corinthian is included in "BecK Up Do Not Seen”.

Taylor Environmental Group. Inc. During the non-emergency. clean-up and remediation project 31 Stuyvesant High School.Taylor Environmental Group. Inc. was retained to conduct asbestos project monitoring, air sampling and on-site analytical services. Prior to the collection of TEM air samples. Taylor Environmental ccnducied visual inspections to identify if there was a presence of visible dust and debris. As requested by SCA, aggressive atr sampling (echrrques were not performed at this facility. A total of 161 ambienf TEM air samples were collected and snalyred vis the AHERA protocol. Tsylor Environmental performed project monilofing. air sampling snd analyiical services at a total cost of $68,300.00. Invoice for work performed by Taylor is included in "Back Up Do Not Scan*.

ATC Associates This additional sampling was conducted for quality control by ATC Associates in coordination with the remediation project performed al Stuyvesant High School by TRIO Asbestos Removal and KISS Construction, Inc. The number of air samples taken and their locations were determined by Mr. Hamid Savoj ol the SCA. lEH Department. Samples were taken on September 30, October 3 and 4, 2001. Costs incurred from quality conlrol ait sampling performed by ATC Associates were 556,500.00. Invoice for work performed by ATC is included in "Back Up Do Not Scan".

TD-X/B-ecom The TDX/Becom Joint Venture was retained by SCA to perform power washing and cleaning of the exterior of Stuyvesanl High School. This conlraci included all union labor, msterjals and ecuipment as required to perform power washing of the masonry and windows of the building. A 131-foot boom-lift enc 8O-I0OI man lifts were used to reach the eleven story building, If flags developed in ihe concrete sidewalk c‘ a result of the comractual work, asphalt pavers or oraniie pavers, al! repair work would be peilormed on s times and micieiir' Le5!: Lest; asset laiec wit’, tcnsiiucuo' m.ar.cper^ren: anr inspeciiC' b\ TD>;'betcr^ tciaiec J if ddd.gc invoice foi work pertormed by TDX-becom rs inciuoeo m ’'Back Up Do Not Scan’'.

PREPARED BY; Dan Martin ProiGCt Officer FEMAForm9G-91A, SEP 98

CITY_21MC100_005170044

NYC-WTC_000359486

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000359486Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

FEMA Project Worksheet · page 2

NYC-WTC_000251589

FEMA project worksheet and paperwork burden disclosure for disaster-related work.

Similarity score 0.977 (not a probability)

machine-extracted · confidence unavailable · Check page ↗

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000243516

FEMA project worksheet for WTC construction materials context and asbestos discussion.

Similar indexed content

NYC-WTC_000243504

FEMA declaration/project worksheet for WTC asbestos regulations and materials.

Similar indexed content

Compare copies and versions →