NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 2 pages

Staten Island debris summary report, Dec 2001

Machine-extracted title · confidence 37%

Island debris summary report with safety observations and exclusion zone notes, Dec 10, 2001.

NYC-WTC_000354326–000354327
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Evans Environmental & Geosciences Staten Island Debris Disposal Daily Safety Monitor Summary Report for 12/6/01 • 12/9/01 □ate: December 10, 2001

Date First Reported Unsafe Act/Hazards Identified Corrective Action Taken Proposed Long-term Solution Status

Back-up alarms reported inoperable or not loud Informed equipment supervisor of the specific 10/07Z01 enough on 1-2 pieces of heavy equipment per Notified supervisor and contractor safety supervtsof. machines that are not in compliance. Open shift. Have operation^manager coorainaie pre- Dump trucks being loaded in roadways, outside determined loading areas inside the exclusion zone 10/07/01 Notified operations and safely supervisors. Closed exclusion zone. wilh heavy equipment operators and dump truck

Install more traffic control signs or designate Apparent lack of traffic control at major on-site 10/07/01 Notified operations and safety supervisors. personnel lo control traffic during high traffic Open intersections. activities. Some personnel were observed listening to Issue presented to agency supervisor, identified Incorporale this topic into the pre-shift safety 10/07/01 Open walkmans in exclusion zone- where the employee may conduct the activity. meetings. Designate rest areas outside the exclusion zone. Issue presented to employee or immediate Notify shift supervisor, emphasize appropriate PPE Item 9. Personnel resting/taking off PPE in 10/07/01 supervisor. Identified where the employee may Open some areas of exclusion zones. use in exclusion zone in pre-shift meetings. Strongly conduct the activity. encourage proper PPE use.

Move drinking coolers out of exclusion zone. Issue presented to employee or immediate Designate outside rest areas adjacent to the Personnel eating, drinking and smoking, in exclusion zone. Notify shift supervisor, emphasize Open 10/07/01 supervisor. Identified where the employee may exclusion zone. appropriate PPE use in exclusion zone in pre-shift conduct the activity. meetings. Strongly encourage proper PPE use.

Load trucks properly, design hauls to avoid ground Rebar falling from payhaulers onio the haul workers, increase worker awareness to the hazards road and in the work area. Hazard to workers 10/07/01 Documented in field notes. on the ground. Design plan for material entering the Ongoing walking, working on screens, or driving through screens. Roadways are routinely cleaned by work zone. endloaders.

Additional light plants have been set up on site. Conducted lighting survey. Safely supervisor Results submitted to Contractor Operations 10/07/01 Inadequate lighting in some roadways. communicates with operations to immediately fix Ongoing Manager. poorly lighted areas. Additional stadium lights have been delivered. DOG dump trucks appeared overloaded, Notify shift supervisor and contractor safety 10/07/01 Activity noted tn field logs. Ongoing dragging material out of back of truck. supervisor. Emphasize to appropriate parties that all generators Some generators appeared to be not grounded Notified contractor safety supervisor. Waiting 10/07/01 must be grounded in compliance with NEC Open properly. approval of grounding plan. requirmenls prior lo operation. Personnel informed that they should not sit or rest Notify contractor safely supervisor. Issue presented Personnel observed sitting/resting on operating Open 10/07/01 on Ihe screening machines. Notified agency in the Contractor Safety Meeting screening machines. supervisor. Personnel observed using excessive Notified contractor safety supervisor, impose more Noted vehicle, company, time, and location where 10/07/01 speed/using aggressive driving techniques Open possible. Issue presented to immediate supervisor. stringent traffic/driving controls. when operating vehicles/equipmenl and ATVs. Identify locations of cords wilh cones or jersey barriers and inform operators of the presence of the cords. Start punch list for P&J identifying damaged Electrical supply cords for stadium lights have Notified contractor operations and safety cords. Incorporate inspection as ongoing activity. Recurring 11/01/01 been damaged by heavy equipment. supervisors. Recommend installation of power lines through rigid PVC conduit, all connections from power source to light units to be in compliance with NEC code. Notified contractor supervisor to coordinate removal. Implement protocols for storing and disposing of Propane/compressed gas tanks observed in Ongoing 10/07/01 System set up to contact operations for immediate compressed gas/air tanks that are found in the debris. debris. removal when tanks are located. Light plants in need of alignment adjustment or Inspect light plants nightly, identify and correct any 10/07/01 Notified contractor safety supervisor. Ongoing repair problems.

Page 2 of 2 es&h report table for 12.06.01 thru 12.09.0l.xls

CITY_21MC100_008918684

NYC-WTC_000354327

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000354327Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000289749

Weekly summary of debris site conditions and safety monitoring at Island Debris operations.

Similar indexed content

Debris removal safety summary report, Nov 2001

NYC-WTC_000208427

Summary report documenting safety device deficiencies and personnel PPE compliance issues at the debris removal site on Staten Island from November 12 to 14, 2001.

Similar indexed content

Compare copies and versions →