Staten Island debris summary report, Dec 2001

Machine-extracted title · confidence 37%

Island debris summary report with safety observations and exclusion zone notes, Dec 10, 2001.

NYC-WTC_000354326–000354327
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Evans Environmental & Geosciences Staten Island Debris Disposal Daily Safety Monitor Summary Report for 12/6/01 -12/9/01 Date: December 10, 2001

Date First Reported Unsafe Act/Hazards Identified Corrective Action Taken Proposed Long-term Solution Status

Stopped activity and explained hazards. 12/09/01 Personnel climbing on debris stockpile. Add issue Io pre-shift safety briefing outline Closed Immediately corrected. Personnel rot wearing PPE on roads between Redefine exclusion zone to include roadways 10/07/01 Bring up at safety meeting Open active work areas. between active work areas. Personnel hanging PPE on screener PPE removed from switches. Personnel asked not 12/09/01 Add issue to pre-shift safety briefing outline New emergency shut-off switches. to hang equipment on the switches. Area was evacuated and NYPD Bomb Squad Continue Io cover this issue in pre-shift safety 12/09/01 Grenade discovered in Area C. New removed grenade. briefings. Jersey barriers undercul at C sifter are down and an approximately 24" vertical step up is Refill undercuts at barriers on a regular basis. Install 12/09/01 Requested contractor supervisor to correct. New required lo access the work station entry wood steps or slope at pathway. pathway Near Miss as vehicle traveling at a high rate of speed narrowly avoided running over a group of NYPD personnel at the roadway intersection Continue to emphasize awareness to NYPD Noted time, place and ID number of vehicle between Areas D and C. A verbal personnel at pre-shift briefings. Continue to monitor 12/09/01 involved. Communicated concern to Conlractor New confrontation resulted between driver and and report traffic safety hazards. Impose more Safety Supervisor NYPD Sgt. (Several other vehicles were stringent traffic controls. reported as traveling at high speeds on the E- W road between Areas D and E.)

There is evidence that personnel may be dry­ Communicated concern to Contractor Safety- Develop and implement approved work practice and 12/06/01 sweeping the comfort sheds w/o the benefit of New Supervisor procedure for maintaining comfort sheds. appropriate PPE.

Debris stockpiles between Areas A and B approximately 30' in height. Debns stockpile al Communicated concern to Contractor Safety Request assessment of traffic/material flow plan. 12/05/01 north end of Area C approximately 25' in height Open Supervisor Monitor continuously. with sheer wall (approximately 90 degrees) next to roadway. Advised the work group supervisor of the unsafe NYPD personnel sorting through "screened" Continue to emphasize emergency slop protocol in practice and requested that personnel utilize the 12/04/01 pile beneath the discharge of the conveyor belt the NYPD shift briefings. Discuss equipment Open emergency stop or ask the equipment operator to while the sifter continued to operate. operator intervention in Contractor Safety Meeting. stop the machine if a need arises

Power cord from generator to stadium lights Cones placed to identify cord. (Cones were 12/02/Q1 Retocate/protecl power cord Open around Enn 7 is being run over. removed)

Subcontractor personnel working w/o PRE, 12/01/01 Comunicated with contractor supervisor Emphasize issue in Contractor Safety Meeting Closed badges or site safety training

Vehicle lights (head-lights, lail-lights, back-up Continue to monitor. Provide equipment-specific 11/29/01 lights) reported inoperable on 3-4 pieces of Notified contractor safety supervisor Open information to subcontractor supervisors. heavy equipment per shift.

Advised the work group supervisor of the unsafe Personnel in B7 Sprung tent while heavy practice and requested that personnel leave the This item is covered during the site safely 11/29/01 equipment moving debris. building while the equipment was in operation orientalion. Continure to monitor work practices. Open Compliance was not achieved.

Repeatedly brought to the attention of equipment Lock OuVTag Out procedures inconsistently operators and sub supervisors. On the spot Continue to monitor compliance and emphasize in 11/20/01 Ongoing used at the screeners/sifters (both contractors) corrections made. This issue was presented in the "tool box" meetings and contractor safety meetings. Conlractor Safety Meeting 11/28.

Personnel from Areas A&B who enter/exit break-shed south of Sprung lent are Concern has been incorporated in shift safely Eliminate need for personnel to walk along side the 11/20/01 Open unnecessarily exposed to heavy equipment briefings. building by rotating the shed 180 degrees. operating alongside the shed.

Personnel removing PPE. smoking, eating and Specific deficiencies and requests for corrective drinking in and around break sheds. Mud and 11/19/01 action documented and communicated to work Relocate break sheds outside of exclusion zone. Open general garbage/trash accumulating in and group leaders. around break sheds.

Broken and missing handrails on the yellow Corrective action documented and communicated to Continuous observation and documentation of repair 11/18/01 Open screeners. contractor operators and supervisors. status and screener conditions.

Issue presented to employee or immediate Personnel not consistantly wearing proper PPE, supervisor. Identified where the employee may Notify shift supervisor, emphasize appropriate PPE 10/07/01 (hard hats, respirators, suits, or glasses). conduct the activity. While PPE usage has not use in exclusion zone in pre-shift meetings. Strongly Open includes workers, operators, and supervisors reached our goal of 100% we are currently at encourage proper PRE use. approximately 75% compliance.

Page 1 of 2 es&h report table for 12.06.01 thru 12.09.01 xIs

CITY_21MC1OO_OO8918683

NYC-WTC_000354326

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000354326Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000289749

Weekly summary of debris site conditions and safety monitoring at Island Debris operations.

Similar indexed content

Debris removal safety summary report, Nov 2001

NYC-WTC_000208427

Summary report documenting safety device deficiencies and personnel PPE compliance issues at the debris removal site on Staten Island from November 12 to 14, 2001.