Island Debris report, weekly safety summary, 11/2001

Machine-extracted title · confidence 33%

Weekly summary of debris site conditions and safety monitoring at Island Debris operations.

NYC-WTC_000289749–000289750
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Evans Environmental & Geosciences Staten Island Debris Disposal Dally Safety Monitor Summary Report for 11/28/01 - 11/29/01 Date; November 30.2001

Date First Reported Unsafe ActfHazards Identified Coirectfve Action Taken Proposed Long-term Solution Status

Vehide lights (headlights, tail-lights, back-up Continue to monitor. Provide equipment-specific 11/29rt)1 lights) reported inoperable on 3-4 pieces of Notified contractor safely supervisor New/Recurring information to subcontractor supervisors. heavy equipmenl per shift.

Jersey bamers undercut al Yannuzzi sifters and Advised contractor safety supervisor Continue to monitor. Recommend 'as needed' 11/29/01 New In Area A Sprung tent. plaoemenl of fill to eliminate undercut areas.

/Ldvised the work group supervisor of the unsafe Personnel In B7 Sprung tent while heavy practice and requested that personnel leave the This item is covered during the site safely 11/29«1 New equipment moving debris. building while the equipmenl was in operation. orientation. Continure to monitor work practices. Compliance was not achieved.

Repeatedly brought to Ihe attention of equipment Lock Out/Tag Out procedures Inconsistently operators and sub supervisors. On the spot Continue to monitor compliance and emphasize In 11/20A)1 Open used at the screeners/sifters (both contractors) corrections made. This issue was presented in the 'tool box' meetings and contractor safety meetings. Contractor Safety Meeting 11128.

Personnel from Areas A4B who enter/exil break shed south of Spning tent are unnecessarily Concern has been incorporated in shift safety EIbninate need for personnel Io walk along side Ihe 11/20^)1 Open exposed to heavy equipment operating briefings. building by rotating the shed 180 degrees alongside the shed. Personnel removing PPE. smoking, eabng and Incorporate this topic into the pre-shift safety Specific defidendes and requests for corrective drinking in and around break sheds. Mud and meetings. Develop housekeeping procedures, 11/19/01 action documented and communicated to work Open general garbage/liash accumulabng in and provide trash containers and post corresponding group leaders. around break sheds. InsInKtions. See Item 9. Multiple safety device deficiencies al mechanica Prepare and submit repair punchfist. Continuous screeners. Deficient equipment includes loose, Specific defidendes and requests for corrective observation and documentation of repairs/conditions. 11/18A)1 broken and missing handrals, broken and action documented and communicated to Note: Emergency stop switches have been Open missing safety chains, and Inoperable contractor operators and supervisors. repaired/replaced. Handrails and safety chains emergency stop switches. remain bl defiaenl condition.

Issue presented Io employee or bnmedlate Personnel not consistently wearing proper PPE. supervisor, identified where the employee may Notify shift supervisor, emphasize appropriate PPE 10A)7/01 (hard hats, respirators, suits, or glasses). conduct the activity. While PPE usage has not use in exclusion zone in pre-shifi meetings. Strongly Open Indudes workers, operators, and supervisors. reached our goal of 100% we are currently at encourage proper PPE use. approximately 75% compliance.

Back-up alarms reported inoperable or not loud Notified supervisor and contraefor safety Informed equipmenl supervisor of the specific 10/07/01 enough on 1-2 pieces of heavy equipmenl per Open supervisor. machines that are not bi compliance. shifL Vehide light deficiencies reported on 3-4 pieces Develop summary of specific equipment deficendes. 10/07/01 Notified contractor safety supervisor. of heavy equipment per shift. Provide biformation to subconlraclcr supervisors.

Have operabons manager coordinate pre-determined Dump trucks being loaded in roadways, outside 10A)7/01 Notified operations and safety supervisors. loading areas inside Ihe exclusion zone with heavy Open exclusion zone. equipment operators and dump truck drivers. Install more traffic control signs or designate Apparent lack of traffic control at major on-site 10^17/01 Notified operations and safety supervisors. personnel to control traffic during high traffic Open Intersections. activilies. Some personnel were observed listening Io Issue presented to agency supervisor. Identified Incorporate this topic bilo Ihe pre-shift safety 10/07W1 Open walkmans In exclusion zone. where the employee may conduct the acMvIty. meetings.__________________________________ Designate rest areas outside the exclusion zone. Issue presented to employea or bnmedlate Kama. Personnelresling/takingoffPPEin Notify shifi supervisor, emphasize appropriate PPE 10/07/01 supervisor, ktenlified where the employee may Open some areas of exduslon zones. use in exclusion zone m pre-shift meellngs. Strongly conduct the activity. encourage proper PPE use.

Move drinking coolers out of exclusion zone. Issue presented to employee or immediate Designate outside rest areas adjacent Io the Personnel eating, drinking and smoking. In 10/07/01 supervisor. IdentMied where the employee may exclusion zone. Notify shill supervisor, emphasize Open exclusion zone- conduct the activity. appropriate PPE use in exclusion zone in pre-shift meetings. Strongly encourage proper PPE use.

Load trucks properly, design hauls to avoid ground Rebar falling from payhaulers onto the haul road workers, increase weaker awareness to the hazards and In the work area. Hazard to workers 10/07/01 Documented in field notes. on the ground. Design plan for material entering the Ongoing walking, working on saeens. or driving through screens. Roadways are routinely cleaned by work zone. endloaders.

Additional light plants have been set up on site. Conducted lighling survey. Safety supervisor 10/07/01 Inadequate lighting in some roadways. communicates with operations to immediately fix Results submitted to Contractor Operations Manager. Ongoing poorly lighted areas. Additional stadium lights have been deliveted.

Page 1 of 2 es&h report table for 11.28.01 and 1129.01 .xIs

CITY_21MC100_002403087

NYC-WTC_000289749

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000289749Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Debris removal safety summary report, Nov 2001

NYC-WTC_000208427

Summary report documenting safety device deficiencies and personnel PPE compliance issues at the debris removal site on Staten Island from November 12 to 14, 2001.