NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 2 pages

Island Debris report, weekly safety summary, 11/2001

Machine-extracted title · confidence 33%

Weekly summary of debris site conditions and safety monitoring at Island Debris operations.

NYC-WTC_000289749–000289750
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Evans Environmental a Geosciences Staten Island Debris Disposal Daily Safety Monitor Summary Report for 11/28/01 -11/29/01 Dats: November 30,2001

Date First Reported I Corrective Action Teken Propoeed Long-term Solution Statue Uneafe ActlHazarda Identified

DOS dump trucks appeared overloaded. Notify shlfl supervisor and contractor safety 10/07/01 Activity noted in field logs. Ongoing dragging material out ol back o( truck. supervisor. Emphasize to appropriate parties that all generators Some light plants and generators appeared Io Notified contractor safety supervisor. WalUng 10/07/01 and light plants must be grounded in compliance with Open be not grounded properly. approval of grounding plan. NEC requirments prior to operation. Personnel informed that they should not sit or rest Personnel observed sitting/resting on operaling Notify contractor safety supervisor. Issue presented 10«)7/01 on the screening machines. Notitied agency in the Contractor Safety Meeting Open screening machines. supervisor.

Personnel observed using excessive Noted vehicle, company, time, and location where Notified contractor safety supervisor, impose more 10/07/01 speed/usingBOOi ig techniques wher Open possible. Issue presented Io Immedlale supervisor. stringent Iraffic/driving controls. operating vehlcles/eqiapment.

Identify locations of cords with cones oriersey barriers and Inform operalors of the presence of the cords. Start punch list for P&J Identifying damaged Elecirical supply confs for stadium lights have Notified contractor operations and safely 11/01/01 cords. Incorporate inspection as ongoing activity. Recurring been damaged by heavy equipment. supenrisors. Recommend instalation of power lines through rigid PVC conduit, all connections bom power source to IlghI units to be in compliance with NEC code. Notified contractor supervisor Io coordinate Implement protocols for storing and disposing of Propane/compressed gas tanks observed in removal. System set up to contact operations for 10/07/01 compressed gas/air tanks that are found in the Ongoing debris. Immediate removal when tanks are located. debris. Light plants in need of alignment adjustment or Inspect light plants nightly, identify and correct any 10/07/01 Notified contractor safety supervisor. Ongoing regain problems.

Pege2of2 es&h report table lor 1128.01 and 11.29.01 .xIs

CITY_21MC100_002403088

NYC-WTC_000289750

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000289750Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Debris removal safety summary report, Nov 2001

NYC-WTC_000208427

Summary report documenting safety device deficiencies and personnel PPE compliance issues at the debris removal site on Staten Island from November 12 to 14, 2001.

Similar indexed content

Compare copies and versions →