NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 2 pages

Staten Island debris site summary, Jan 2002

Machine-extracted title · confidence 31%

Site report with hazards identified and actions taken for debris handling at Island debris site.

NYC-WTC_000289810–000289811
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document ■>

Evans Environmental & Geosciences Staten Island Debris Disposal Dally Safety Monitor Summary Report for 1/3/02 -1/6/02 Date: January 7, 2002

Date First Reported Unsafe Act/Hazards identified Corrective Action Taken Proposed Long-term Solution Status

Issue presented to employee or immediate Personnel not consistantly wearing proper PPE. supervisor. Identified where the employee may Notify shift supervisor, emphasize appropriate PPE (hard hats, respirators, suits, or glasses) in 10/07/01 conduct the aclivily. While PPE usage has not use in exclusion zone in pre-shift meetings. Strongly Open Exclusion Zone, includes workers, operators. reached our goal of 100% we are currently at encourage proper PPE use. and supervisors. approximately 75% compliance.

Back-up alarms reported inoperable or not loud Informed equipment supervisor of the specific Notified supervisor and contractor safety supenrisor. 10/07/01 enough on 1 -2 pieces of heavy equipment per machines that are not in compliance. Implemented Open Contractor has ordered replacement parts. shift. a equii It ins program. rprF Dump trucks being loaded in roadways, outside deleimined loading areas inside the exclusion zone 10/07/01 NotUied operations and safety supervisors. Closed exclusion zone. with heavy equipment operators and dump truck rtfiverg ________________________________________ Install more traffic control signs or designate Apparent lack of traffic control al major on-site 10/07/01 Notified operationsand safety supervisors. personnel to control traffic during high traffic Open intersections. activities. Some personnel were observed listening to Issue presented Io agency supervisor. Identified Incorporate this topic into the pre-shift safety 10/07/01 Closed Walkmans in exclusion zone. where the employee may conduct lite activity. meetings. Move drinking coolers out of exclusion zone. Issue presented to employee or immediate Designate outside rest areas adjacent to the Personnel eating, drinking and smoking, in 10/07/01 supervisor. Identified where the employee may exclusion zone. Notify shill supervisor, emphasize Open exclusion zone. conduct the activity. appropriate PPE use in exclusion zone in pre-shift meetings. Strongly encourage proper PPE use.

Load trucks properly, design hauls to avoid ground Rebar falling from payhaulers onto the haul workers, increase worker awareness Io the hazards road and In the work area. Hazard Io workers 10/07/01 Dcxzumented in field notes. on the {pound. Design plan lor malerial entering the Ongoing walking, working on screens, ordriving through screens. Roadways ate routinely cleaned by work zone. endloaders.

Additional light plants have been set up on site. Conducted lighting survey. Safety supervisor Results submitted Io Contractor Operations 10/07/01 Inadequate lighting in some roadways. communicates with operations to immediately fix Ongoing Manager. poorly lighted areas. Additional stadium lights have been delivered. DOS dump trucks appeared overloaded, Notify shift supervisor and contractor safety 10/07/01 Activity noted in field logs. Ongoing dragging material out of back of truck. supervisor.________________________________ Emphasize Io appropriate parties that all generators Some generators appeared to be not grounded Notified contractor safety supervisor. Waiting must be grounded In compliance with NEC Open 10/07/01 property. approval of grounding plan. requlrments prior to operation. Personnel Informed that they should not sit or test Personnel observed siUng/resting on operating Notify contractor safely supervisor. Issue presented 1(W07/01 on the screening machines. Notified agency Closed screening machines. in the Contractor Safety Meeting supervisor. Personnel observed using excessive Notified contractor safety supervisor, impose more Noted vehicle, company, lime, and location where Open 10/07/01 speed/using aggressive driving techniques possible. Issue presented to Immediate supervisor, stringent Iraffic/driving controls. when operating vehides/equipmenl and ATVs. Notified contractor operations and safely Route power lines through rigid PVC conduit, all Electrical supply cords for stadium lights have supervisors. Identified locations of cords with cones ■11/01/01 connections from power source to light units Io be in Recumng been damaged by heavy equipment. or Jersey barriers and informed operators of the compliance with NEC code. presence of the cords. Notified contractor supervisor to coordinate removal. Implement protocols for stonng and disposing of Propane/compressed gas tanks observed In Ongoing 10/07/01 System set up to contact operations for immediate compressed gas/air tanks that are found in the debris. debris.________________________ _ removal when tanks are located. Light plants in need of alignment adjustment or Inspect lighi plants nightly, identify and correct any 10/07/01 Notified contractor safety supervisor. Ongoing problems.

Page 2 of 2 esh report table for 1.03.02 thru 1.06.02.xls

CITY_21MC100_003896986

NYC-WTC_00028981 1

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000289811Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

WTC Daily Site Evaluation, Oct 19, 2001 · Box unavailable

NYC-WTC_000204852

Daily environmental, safety, and health evaluation log for the World Trade Center site dated October 19, 2001, noting suspended loads and rigging inspections.

1 shared non-person entities · 1 shared topics · similarity 0.913

machine-extracted · confidence unavailable · Check page ↗

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000289749

Weekly summary of debris site conditions and safety monitoring at Island Debris operations.

Similar indexed content

Debris removal safety summary report, Nov 2001

NYC-WTC_000208427

Summary report documenting safety device deficiencies and personnel PPE compliance issues at the debris removal site on Staten Island from November 12 to 14, 2001.

Similar indexed content

Compare copies and versions →