NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 2 pages

WTC Daily ES&H evaluation, Oct 2001

Machine-extracted title · confidence 34%

Daily site safety and rigging inspections; area classifications and actions.

NYC-WTC_000357900–000357901
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Environmental, Safety, and Health WTC Daily Site Evaluation* 10/19/01

Major Issues Location Disposition Status Working under suspended loads - 15 picks of 15+ tons 60% swinging over Reviewed with contractors al 8:00aui ES&H meeting and 9:00am NEW AU areas individuals._________________________ _________________________________ co itractor’s meeting. _________ __________________________ _ AMEC/OSHA/Bechtel conducted rigging inspections 50 chokers and slings taken AI lEC/OSHA/BechteVDDC had follow up meeting this morning and NEW AMEC area out of service. 2 questionable slings left in service and down graded in capacity. AMEC to purchase new slings and chokers.______________________

■ Grace backhoe backed into kerosene drums; several drums knocked over but no ruptures or spills. Al drums were removed by FDNY and EPA. COMP Inappropriate storage of flammable liquids.__________________________________ Near wrc: Bovis removed flammable liquids to proper storage area. COMP ■It Inconsistent use of proper PPE (e.g., hearing protections, safety glasses, respiratory WTC2 M<!t with Bovis safety rep. to discuss corrective action plan. OPEN protection). Employee suffered lacerations to legs. Treated by DMAT and returned to Bovis employee slipped on pile. WTC2 NEW wc rk. f tJ 6 Sswlronworkers cutting beam. WTC6 WTC 2 South side Beam dropped causing Ironworkers to jump out of the way causing one to su: Fer a twisted left knee. Di icussed with Bovis safety rep. NEW NEW Inadequate barricading._________ Dust suppression. WTC 2 E^llent job of watering and keeping dust down. NEW I Inadequate load spotting during lifting. Yellow crane near FS #10 Tuily assigned full time spotters for each piece of equipment. COMP Improper excavation access and egress. North of WTC 4, by Church Discussed with contractor’s safety rep. OPEN Tully ordered flash arrestors and will place them on connection one they OPEN Lack of flash arrestors on cutting torches. Various locations come in. Barricades around excavations and open holes need improvement. Various locations Discussed with contractor’s safety rep.; some improvements noted. OPEN Gas cylinders improperly stored._____________ _____________ Various locations Contractor’s safety rep. was informed. OPEN Inconsistent use of proper PPE (e.g., safety glasses, respirators). All areas Discussed with contractor’s safety personnel. OPEN Inadequate traffic control. Greenwich & Liberty Discussed with Tully safety rep., added extra flagman. NEW Inadequate dust suppression. Tullv Discussed with Tully safety rep. NEW

Torch cutting too close to oxygen tube trailer. WTC 7 Safety zone increased to 25 ft. around oxygen tube trailers. COMP I Crane operator lifting loads over personnel. Crane 888 Ofjerator instructed not to swing loads over personnel. COMP COMP Diesel fuel tanks not grounded or posted. Gas cylinders improperly secured and stored. Barclay St. WTC 7 Fuel tanks grounded. ^^^f^^Se^Mrsafe^^^7to^dis^s7TO^ctiveact^npim~2Z^^ZZZ OPEN I Operators eating and drinking on rubble pile. Rubble pile Mqt with Seasons safety rep. to discuss corrective action plan. OPEN Turner ordered flash arrestors and will place them on connection .one they Lack of flash arrestors on cutting torches. Various locations OPEN come in. Inconsistent use of proper PPE, particularly respiratory protection on pile. WTC 7 Met with Seasons safety rep. to discuss corrective action plan. OPEN Bobcats and gators driving across oxygen and acetylene hoses._________ WTC 7 Discussed With Seasons safety rep. NEW ■ Employees walking beneath loaded excavators. I'wo man-baskets with torch cutting gear suspended over personnel. WTC 7 WTC 7 Discussed with Seasons safety rep. Discussed with Seasons safety rep. NEW NEW o - Dust suppression. WTC 7 Excellent job of watering and keeping dust down. NEW

KJ

S o

! ♦Site assessments are conducted daily in the WTC disaster area. The primary focus is to identify and correct any major unsafe practices and unsafe conditions. I I

NYC-WTC_000357900

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000357900Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

WTC Daily Site Evaluation, Oct 19, 2001 · Box unavailable

NYC-WTC_000204852

Daily environmental, safety, and health evaluation log for the World Trade Center site dated October 19, 2001, noting suspended loads and rigging inspections.

11 shared non-person entities · 1 shared topics · similarity 0.989

machine-extracted · confidence unavailable · Check page ↗
WTC Daily Site Evaluation, Oct 23, 2001 · Box unavailable

NYC-WTC_000204854

Daily environmental, safety, and health evaluation log for the World Trade Center site dated October 23, 2001, noting PPE usage, fall protection, and structural cracks.

9 shared non-person entities · 1 shared topics · similarity 0.961

machine-extracted · confidence unavailable · Check page ↗

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

WTC Daily Site Evaluation, Oct 19, 2001 · page 1

NYC-WTC_000204852

Daily environmental, safety, and health evaluation log for the World Trade Center site dated October 19, 2001, noting suspended loads and rigging inspections.

Similarity score 0.995 (not a probability)

machine-extracted · confidence unavailable · Check page ↗

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000204852

Daily environmental, safety, and health evaluation log for the World Trade Center site dated October 19, 2001, noting suspended loads and rigging inspections.

Similar indexed content

NYC-WTC_000205355

Daily environmental, safety, and health evaluation report for the World Trade Center site noting suspended load operations and contractor meetings.

Similar indexed content

NYC-WTC_000304161

WTC daily safety and environmental evaluation noting rigging inspections and contractor coordination.

Similar indexed content

NYC-WTC_000360439

WTC site safety evaluation noting suspended loads and ES&H review outcomes.

Similar indexed content

NYC-WTC_000354388

ES&H briefing notes on rigging inspections and contractor coordination at the WTC site.

Similar indexed content

Compare copies and versions →