WTC Daily ES&H evaluation, Oct 2001

Machine-extracted title · confidence 34%

Daily site safety and rigging inspections; area classifications and actions.

NYC-WTC_000357900–000357901
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

z ■< Z ■<

o o co

Environmental, Safety, and Heal :h WTC Daily Site Evaluation* “0 o c o 10/19/01 CT o o' Ca5 Summary report on management of petroleum products. All zones Til t Dowd, Bechtel, will report out findings on 10/19/01.___________ COMP cn "0 Diiicussed at 8;00am ES&H meeting and 9:00am Contractors meeting. o CO Need to improve process for safety review/eoordinatior, of contractor demo, plans. AU zones Contractors will provide demo plans to Bob Adams, DDC/Rob Jones, OPEN o CD Be :htel prior to doing any demolition work. Unauthorized personnel walking and private vehicles driving through work areas. All zones Unauthorized personnel and private vehicles should not be allowed in OPEN o o wo rk areas. o Food and water still being brought to pile. Various locations Discussed with persons bringing the food and water. __________ OPEN c Gas cylinders not segregated. Various locations Discussed with contractor’s respective safety reps. OPEN 3 CD Gators and other small vehicles still going excessive speeds; also should have flags, All organizations on site should be required to operate vehicles safe and All zones OPEN lights, etc. to increase visibility. maintain speeds below 10 mph within work areas. Be ;htel/Liberty Mutual/OSH.APnme Contractors working to correct IN Crane setup and operating deficiencies as noted on report of 10/9/01. All zones dcHciencies.__________ _________________________________________ PROC Large number of NYPD spectators near pile without proper PPE. All zones Request assistance from NYPD to comply with safety requirements._____ OPEN Traffic control is congested and speeding continues. AMEC entrance Discussed with all contractor reps. OPEN NYPD Gators delivering coffee and snacks to NYPD Officers stationed around or Ne jd letter from NYPD WTC Site Commander directing this practice to All areas OPEN near the pile. cei se. Wooden shack constructed at Barclay and Greenwich by Verizon which is in the Dij cussed with Verizon. No action taken. Followed up with letter to Bob WTC7 OPEN way of heavy equipment movement, all trucks, other vehicles and pedestrians. Ad ims, DDC for follow up action. American Red Cross volunteers walking near pile by Church and Liberty. No PPE. Church and Liberty As' ced them to please leave area, and they did. COMP Barclay & W. Broadway and Greenwich & Barclay and

1 Fire barrels observed around site. Albany & West and West St. at closest road block to site. Plaza level between WTC 4 FDNY contacted and fire barrels were allowed to bum out.

No PPE. When asked to leave area their response was “when we feel like NEW

7 NYPD Officers and guests on plaza level near cave-in. NEW &5. it.” r 4 Federal Agents on WTC 6 pile without PPE. WTC 6 pile. Di! cussed with agents and they left area. NEW 2 US Customs Officers standing around WTC 6 without PPE. WTC 6 Di! cussed with Customs Officers and they left area. NEW Personal (worker) exposure monitoring: 10 asbestos (PCM), 12 lead, 2 carbon monoxide, 9 metals (ICAP), and 2 respirable silicas; all below PELs. 1 Lead 113 Various workers Wi 11 continue sampling. NEW

O 1 H rd I

oi I o ' *Site assessments are conducted daily in the WTC disaster area. The primary focus is to identify and correct any maior unsafe practices and unsafe conditions.

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000357901Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

WTC Daily Site Evaluation, Oct 19, 2001 · Box unavailable

NYC-WTC_000204852

Daily environmental, safety, and health evaluation log for the World Trade Center site dated October 19, 2001, noting suspended loads and rigging inspections.

11 shared non-person entities · 1 shared topics · similarity 0.989

machine-extracted · confidence unavailable · Check page ↗
WTC Daily Site Evaluation, Oct 23, 2001 · Box unavailable

NYC-WTC_000204854

Daily environmental, safety, and health evaluation log for the World Trade Center site dated October 23, 2001, noting PPE usage, fall protection, and structural cracks.

9 shared non-person entities · 1 shared topics · similarity 0.961

machine-extracted · confidence unavailable · Check page ↗

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

WTC Daily Site Evaluation, Oct 19, 2001 · page 2

NYC-WTC_000204852

Daily environmental, safety, and health evaluation log for the World Trade Center site dated October 19, 2001, noting suspended loads and rigging inspections.

Similarity score 0.985 (not a probability)

machine-extracted · confidence unavailable · Check page ↗

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000204852

Daily environmental, safety, and health evaluation log for the World Trade Center site dated October 19, 2001, noting suspended loads and rigging inspections.

Similar indexed content

NYC-WTC_000205355

Daily environmental, safety, and health evaluation report for the World Trade Center site noting suspended load operations and contractor meetings.

Similar indexed content

NYC-WTC_000304161

WTC daily safety and environmental evaluation noting rigging inspections and contractor coordination.

Similar indexed content

NYC-WTC_000360439

WTC site safety evaluation noting suspended loads and ES&H review outcomes.

Similar indexed content

NYC-WTC_000354388

ES&H briefing notes on rigging inspections and contractor coordination at the WTC site.

Similar indexed content

Compare copies and versions →