NYC 9/11 Public Portal Document
Environmental, Safety, and Health
WTC Daily Site Evaluation*
10/19/01
Summary report on management of petroleum products. All zones Tiip Dowd, Bechtel, will report out findings on 10/19/01. COMP
Dijcussed at 8:00am ES&H meeting and 9:00am Contractors meeting.
Need to improve process for safety review/coordination of contractor demo, plans. All zones Contractors will provide demo plans to Bob Adams, DDC/Rob Jones, OPEN
Be(:htel prior to doing any demolition work.
Ut^uthorized personnel and private vehicles should not be allowed in
Unauthorized personnel walking and private vehicles driving through work areas. All zones OPEN
workareas.
Food and water still being brought to pile. _ Various locations DiYussed with persons bringing the food and water. OPEN
1 > Gas cylinders not segregated.____________ Various locations Discussed with contractor’s respective safety reps. OPEN
Gators and other small vehicles still going excessive speeds; also should have flags, All organizations on site should be required to operate vehicles safe and
All zones OPEN
lights, etc. to increase visibility. maintain speeds below 10 mph within work areas.
Bechtel/Liberty Mutual/OSHA/Prime Contractors working to correct IN
Crane setup and operating deficiencies as noted on report of 10/9/01. All zones deficiencies. PROC
LargenurnberofNYPpspectatorsnearpilewithoutproperPPE_^_ All zones Request assistance from NYPD to comply with safety requirements. OPEN
Traffic control is congested and speeding continues. AMEC entrance Discussed with all contractor reps.________________ OPEN
NYPD Gators delivering coffee and snacks to NYPD Officers stationed around or Ne^ letter from NYPD WTC Site Commander directing this practice to
All areas ce^se._____________ OPEN
near the pile._____________________________________________ _________
Wooden shack constructed at Barclay and Greenwich by Verizon which is in the Discussed with Verizon. No action taken. Followed up with letter to Bob
WTC7 OPEN
way of heavy equipment movement, all tmcks, other vehicles and pedestrians^ Adorns, DDC for follow up action._________________________
American Red Cross volunteers walking near pile by Church and Liberty. No PPE. Church and Liberty Asked them to please leave area, and they did. COMP
Barclay & W. Broadway and
Greenwich & Barclay and NEW
Fire barrels observed around site. FDNY contacted and fire barrels were allowed to bum out.
Albany & West and West St.
at closest road block to site.
Plaza level between WTC 4 No PPE. When asked to leave area their response was “when we feel like
7 NYPD Officers and guests on plaza level near cave-in. NEW
&5. it.”
4 Federal Agents on WTC 6 pile without PPE.___________ WTC 6 pile._____ Dis cussed with agents and they left area.___ NEW
tjj jgl 2 US Customs Officers Ending around WTC 6 without PPE. WTC 6 Discussed with Customs Officers and they left area. NEW
I Personal (worker) exposure monitoring: 10 asbestos (PCM), 12 lead, 2 carbon
monoxide, 9 metals (ICAP), and 2 respirable silicas; all below PELs. 1 Lead 113
mg/m\............................................................................ ...... \Z
Various workers Wi il continue sampling. NEW
g>lAjDUA'
Q
H
K
I
R
o
o
I
o
o
us>
ISO ♦Site assessments are conducted daily in the WTC disaster area. The primary focus is to identify and correct any major unsafe practices and unsafe conditions.
to
o
o
o