NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 2 pages

WTC Daily Site Evaluation, Oct 2001

Machine-extracted title · confidence 40%

ES&H briefing notes on rigging inspections and contractor coordination at the WTC site.

NYC-WTC_000354388–000354389
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Environmental, Safety, and Heal h WTC Daily Site Evaluation* 10/19/01 Summary report on management of petroleum products. All zones Tin Dowd, Bechtel, will report out findings on 10/19/01._____________ COMP Di: cussed at 8:00am ES&H meeting and 9:00am Contractors meeting. Need to improve process for safety review/coordination of contractor demo, plans. All zones Co itractors will provide demo plans to Bob Adams, DDC/Rob Jones, OPEN Be :htel prior to doing any demolition work.________________________ Unauthorized personnel walking and private vehicles driving through work areas. Un authorized personnel and private vehicles should not be allowed in OPEN All zones wo rk areas.__________________________________________________ Food and water still being brought to pile._________________________________ Various locations cussed with persons bringing the food and water._________________ OPEN Gas cylinders not segregated.___________________________________________ Various locations cussed with contractor’s respective safety reps.___________________ OPEN Gators and other small vehicles still going excessive speeds; also should have flags, Al organizations on site should be required to operate vehicles safe and lights, etc. to increase visibility. All zones OPEN ms intain speeds below 10 mph within work areas.___________________ Be :htel/Liberty Mutual/OSHA/Prime Contractors working to correct IN Crane setup and operating deficiencies as noted on report of 10/9/01. All zones del iciencies.___________________________________________________ PROC Large number of NYPD spectators near pile without proper PPE._______________ All zones_____ Re |uest assistance from NYPD to comply with safety requirements. OPEN Traffic control is congested and speeding continues._________________________ AMEC entrance Di! cussed with all contractor reps._______________________________ OPEN NYPD Gators delivering coffee and snacks to NYPD Officers stationed around or Ne :d letter from NYPD WTC Site Commander directing this practice to near the pile. All areas OPEN ceise.______________________________________________________ Wooden shack constructed at Barclay and Greenwich by Verizon which is in the Di! cussed with Verizon. No action taken. Followed up with letter to Bob WTC7 OPEN way of heavy equipment movement, all trucks, other vehicles and pedestrians. Ad >ms, DDC for follow up action._______________________________ American Red Cross volunteers walking near pile by Church and Liberty. No PPE. Church and Liberty_______ As ted them to please leave area, and they did. COMP Barclay & W. Broadway and Fire barrels observed around site. Greenwich & Barclay and FDNY contacted and fire barrels were allowed to bum out. NEW Albany & West and West St. at closest road block to site. ra 7 NYPD Officers and guests on plaza level near cave-in. Plaza level between WTC 4 No PPE. When asked to leave area their response was “when we feel like NEW &5. _________________ jC________________________________________________________ B 4 Federal Agents on WTC 6 pile without PPE.___________________________ WTC 6 pile._____________ Di! cussed with agents and they left area. NEW g 2 US Customs Officers standing around WTC 6 without PPE._______________ WTC 6 Di: cussed with Customs Officers and they left area. NEW 8 Personal (worker) exposure monitoring: 10 asbestos (PCM), 12 lead, 2 carbon W monoxide, 9 metals (ICAP), and 2 respirable silicas; all below PELs. 1 Lead 113 Various workers Wi 1 continue sampling. NEW B mg/m\

O

H 1"^ to

o o o I o o to ♦Site assessments are conducted daily in the WTC disaster area. The primary focus is to identify and correct any major unsafe practices and unsafe conditions. Cn

NYC-WTC_000354389

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000354389Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

WTC Daily Site Evaluation, Oct 19, 2001 · Box unavailable

NYC-WTC_000204852

Daily environmental, safety, and health evaluation log for the World Trade Center site dated October 19, 2001, noting suspended loads and rigging inspections.

12 shared non-person entities · 1 shared topics · similarity 0.988

machine-extracted · confidence unavailable · Check page ↗
WTC Daily Site Evaluation, Oct 23, 2001 · Box unavailable

NYC-WTC_000204854

Daily environmental, safety, and health evaluation log for the World Trade Center site dated October 23, 2001, noting PPE usage, fall protection, and structural cracks.

10 shared non-person entities · 1 shared topics · similarity 0.971

machine-extracted · confidence unavailable · Check page ↗

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

WTC Daily Site Evaluation, Oct 19, 2001 · page 2

NYC-WTC_000204852

Daily environmental, safety, and health evaluation log for the World Trade Center site dated October 19, 2001, noting suspended loads and rigging inspections.

Similarity score 0.982 (not a probability)

machine-extracted · confidence unavailable · Check page ↗

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000204852

Daily environmental, safety, and health evaluation log for the World Trade Center site dated October 19, 2001, noting suspended loads and rigging inspections.

Similar indexed content

NYC-WTC_000205355

Daily environmental, safety, and health evaluation report for the World Trade Center site noting suspended load operations and contractor meetings.

Similar indexed content

NYC-WTC_000304161

WTC daily safety and environmental evaluation noting rigging inspections and contractor coordination.

Similar indexed content

NYC-WTC_000360439

WTC site safety evaluation noting suspended loads and ES&H review outcomes.

Similar indexed content

Compare copies and versions →