NYC 9/11 Public Portal Document
Environmental, Safety, and Health
WTC Daily Site Evaluation* i
10/19/01
Major Issues Location Disposition Status
Working under suspended loads - 15 picks of 15+ tons 60% swinging over Reviewed with contractors al 8:00am ES&H meeting and 9:00am
individuals. All areas NEW
co itractor’s meeting. __________________________________
AMEC/OSHA/Bechtcl conducted rigging inspections 50 chokers and slings taken AJ 4EC/OSHA/Bechtel/DDC had follow up meeting this morning and
AMEC area NEW
out of service. 2 questionable slings left in service and down graded in capacity. AI fEC Io purchase new slings and chokers.
K Grace backhoe backed into kerosene drums; several drums knocked over but no
ruptures or spills.
Inappropriate storage of flammable liquids.________________________________ Near WTC 2
Al drums were removed by FDNY and EPA.
Bovis removed flammable liquids to proper storage area.
COMP
COMP
Inconsistent use of proper PPE (e.g., hearing protections, safety glasses, respiratory
protection). WTC 2 Ml it with Bovis safety rep. to discuss corrective action plan. OPEN
Bovis employee slipped on pile. WTC 2 Employee suffered lacerations to legs. Treated by DMAT and returned to
NEW
werk.
6 Bovis Ironworkers cutting beam. Be am dropped causing Ironworkers to jump out of the way causing one to
WTC 6 NEW
SU Ter a twisted left knee.
Inadequate barricading. WTC 2 South side Di icussed with Bovis safety rep._____________ NEW
Dust suppression. WTC2 Ex cellent job of watering and keeping dust down NEW
Inadequate load spotting during lifting. Yellow crane near FS # 10 Tu lly assigned full time spotters for each piece of equipment._________ COMP
Improper excavation access and egress. North of WTC 4, by Church Di icussed with contractor’s safety rep. OPEN
Lack of flash arrestors on cutting torches. Tuily ordered flash arrestors and will place them on connection one they
Various locations OPEN
come in.
Banicades around excavations and open holes need improvement. Various locations Di icussed with contractor’s safety rep.; some improvements noted. OPEN
Gas cylinders improperly stored.__________________________ Various locations Co ntractor’s safety rep. was informed. OPEN
Inconsistent use of proper PPE (e.g., safety glasses, respirators). All areas Di! iCussed with contractor’s safety personnel._______ OPEN
Inadequate traffic control.______________ ,_________________ Greenwich & Liberty Di icussed with Tully safety rep., added extra flagman. NEW
Inadequate dust suppression. Tully Dil icussed with Tully safety rep. NEW
Torch cutting too close to oxygen tube trailer. WTC 7 Sa 'ety zone increased to 25 ft. around oxygen tube trailers. COMP
Crane operator lifting loads over personnel. Crane 888 Op erator instructed not to swing loads over personnel. COMP
Diesel fuel tanks not grounded or posted. Barclay St. Fu il tanks grounded. COMP
Gas cylinders improperly secured and stored. WTC 7 M< t with Seasons safety rep. to discuss corrective action plan. OPEN
I
Operators eating and drinking on rubble pile. Rubble pile M< t with Seasons safety rep, to discuss corrective action plan._________ OPEN
Tu Tier ordered flash arrestors and will place them on connection one they
Lack of flash arrestors on cutting torches. Various locations OPEN
come in.
Inconsistent use of proper PPE, particularly respiratory protection on pile. WTC 7 Mi t with Seasons safety rep. to discuss corrective action plan. OPEN
Bobcats and gators driving across oxygen and acetylene hoses. WTC 7 Dii cussed with Seasons safety rep. NEW
O Employees walking beneath loaded excavators. WTC 7 Di! cussed with Seasons safety rep. NEW
Two man-baskets with torch cutting gear suspended over personnel. WTC 7 Di: Cl;ussed with Seasons safety rep. NEW
Dust suppression WTC 7 Excellent job of watering and keeping dust down. NEW
to
o
o
I
o
o
to
Jis
*Site assessments are conducted daily in the WTC disaster area. The primary focus is to identify and correct any major unsafe practices and unsafe conditions.
cn
NYC-WTC_000354388
OCR can misread numbers and units. Confirm readings against the page image before using them.