Environmental, Safety, and Hea^h
WTC Daily Site Evaluation*
10/19/01
Major Issues Location Disposition Status
I Working under suspended loads - 15 picks of 15+ tons 60% swinging over
individuals.
AMEC/OSHA/Bechtel conducted rigging inspections 50 chokers and slings taken
out of service. 2 questionable slings left in service and down graded in capacity.
All areas
AMEC area
Reviewed with contractors at 8:00am ES&H meeting and 9:00am
co itractor’s meeting.______________________________________
Af fEC/OSHA/Bechtel/DDC had follow up meeting this morning and
AI I EC to purchase new slings and chokers.
NEW
NEW
Grace backhoe backed into kerosene drums; several drums knocked over but no
Al drums were removed by FDNY and EPA. COMP
ruptures or spills.
Inappropriate storage of flammable liquids. Near WTC 2 Bcivis removed flammable liquids to proper storage area. COMP
Inconsistent use of proper PPE (e.g., hearing protections, safety glasses, respiratory
WTC 2 Met with Bovis safety rep. to discuss corrective action plan. OPEN
“SI protection).
( If Bovis employee slipped on pile. WTC 2
Enkployee suffered lacerations to legs. Treated by DMAT and returned to
work. T'g’rt A M OS 7______ ______________________________
Behm dropped causing Ironworkers to jump out of the way causing one to
NEW
I
6 Bovis Ironworkers cutting beam. WTC 6 NEW
suffer a twisted left knee. tAt45
Inadequate barricading. WTC 2 South side Discussed with Bovis safety rep. NEW
Dust suppression. WTC 2 Exjcellent job of watering and keeping dust down. NEW
Inadequate load spotting during lifting. Yellow crane near FS #10 Tujly assigned full time spotters for each piece of equipment. COMP
Improper excavation access and egress. North of WTC 4, by Church Discussed with contractor’s safety rep. OPEN
Tu lly ordered flash arrestors and will place them on connection one they
Lack of flash arrestors on cutting torches. Various locations OPEN
coi ne in.
i Barricades around excavations and open holes need improvement.
Gas cylinders improperly stored.
Inconsistent use of proper PPE (e.g., safety glasses, respirators).
Inadequate traffic control._______________________________
Various locations
Various locations
All areas
Greenwich & Liberty
Discussed with contractor’s safety rep.; some improvements noted.
Contractor’s safety rep. was informed.
Discussed with contractor’s safety personnel.
Discussed with Tully safety rep., added extra flagman.______________
OPEN
OPEN
OPEN
NEW
Inadequate dust suppression. Tully Discussed with Tully safety rep. NEW
Torch cutting too close to oxygen tube trailer. WTC 7 Safety zone increased to 25 ft. around oxygen tube trailers. COMP
Crane operator lifting loads over personnel. Crane 888 Oplerator instructed not to swing loads over personnel._______________ COMP
Diesel fuel tanks not grounded or posted. Barclay St. Fufel tanks grounded. COMP
Gas cylinders improperly secured and stored. WTC 7 M< t with Seasons safety rep. to discuss corrective action plan. OPEN
Operators eating and drinking on rubble pile. Rubble pile M< t with Seasons safety rep. to discuss corrective action plan. OPEN
Lack of flash arrestors on cutting torches. Tu Tier ordered flash arrestors and will place them on connection one they
Various locations OPEN
come in.
Inconsistent use of proper PPE, particularly respiratory protection on pile. WTC 7 with Seasons safety rep. to discuss corrective action plan. OPEN
Bobcats and gators driving across oxygen and acetylene hoses. WTC 7 Discussed with Seasons safety rep. NEW
I
O Employees walking beneath loaded excavators._____________________ WTC 7 Discussed with Seasons safety rep. NEW
H Two man-baskets with torch cutting gear suspended over personnel. WTC 7 Discussed with Seasons safety rep. NEW
Dust suppression. WTC 7 Excellent job of watering and keeping dust down. NEW
s
o
o
o
I
o
o
Ui
to
to
o
I
o ♦Site assessments are conducted daily in the WTC disaster area. The primary focus is to identify and correct any maljor unsafe practices and unsafe conditions.
co
NYC-WTC_000304161
OCR can misread numbers and units. Confirm readings against the page image before using them.