DEP progress report on wastewater plants, Oct 2001

Machine-extracted title · confidence 49%

Progress report on technical support plan implementation for NYC wastewater plants, Oct 2001.

NYC-WTC_000291027–000291080
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

4/30/01 status; The well water treatment facility is nearly complete. The water main construction is in progress. DEP inspected the dewatering sediment and erosion control. D found unsatisfactory sediment control on two separate site visits, and notified the contractoi resident inspector. DEP also sent a letter to the Village of Andes to advise the contractor to provide proper sediment control and not to discharge muddy water into the stream. The activities have no issue that DEP concerns.

Town: Andes Drainage Basin; Pepacton Reservoir Project Name: Ackerly Farms Subdivision, (Log #2296) Project Description: 17 lot non-realty residential subdivision on 228 acres. Status: Planning Board granted Preliminary approval in 7/93. SEQRA - Type I Determination. Tow will assume Lead Agency. Individual lots will require DEP review/approval at time of lot development. DEP met with applicant for a pre-application conference on 10/30/98. Applic proposes a major sub-division of a 158.6 acre parcel into 12 residential lots. On 11/10/981 sent a letter to the applicant detailing all pre-application conference concerns and findings oi this major subdivision consisting of 12 lots on 158.6 acres. Issues at hand are several watercourses and several wetlands. DEP conducted a comprehensive site evaluation of this major subdivision consisting of 12 lots on 158.6 acres on 12/15/98. At this time DEP identi watercourses present on-site. A letter addressing the details of this site evaluation as well as further outlining the requirements set forth in the WR&R was sent to the owner on 12/22/98 a follow up to the site pre-application conference and additional conversations with the owns on 1/22/99 DEP met with the owners, their consulting engineer, project surveyor, as well as ACOE to discuss in more detail the requirements pertaining to the project. A 2/9/99 correspondence was issued to all involved parties as a clarification and summary of the 1/2; project meeting with the owners, their consulting engineer, project surveyor, as well as ACO Informational items discussed were the various components needed to be included in the SPI such as hydrology calculations, pollutant loading analyses, as well as erosion and sediment control. ACOE also answered several site specific concerns regarding their Federally require permits needed to be obtained for this major subdivision. No applications have been receive* date. DEP completed its review of the revised wetland delineation information prepared by Delaware County Soil and Water Conservation District for this site, and has determined that delineation now accurately reflects the extent of wetlands at the site. DEP issued an evaluati* letter dated 8/16/99 to the consulting engineer. Owner is proposing a 12 lot subdivision on 158.6 acres. Soils testing is taking place on the lots 9/13 thru 9/15/99. Soils testing was completed on 10/27/99. Engineer submitted application on 1/3/00. NICA was issued on 1/14 for the SSTS’s due to the fact that the SEQRA process has not been completed. DEP issued: NICA on 2/16/00 for the SPPP. DEP issued a NOCA for the SPPP and the SSTS on 3/31/00 after receiving a Findings Statement from the Town of Andes Planning Board. The Lead Age (Town Planning Board) issued a Neg Dec on 3/21/00. On 4/10/00 percolation test for lot 2 SSTS reserve area was redone. Design determination is in the process. A letter was sent on 5/15/00 with comments regarding revisions necessary to the SPPP. Separate Extension of Review and Approval Time were issued for the SSTS and SPPP on 5/12/00. On 5/15/00, left* of comments on SSTS was issued to owner. On 5/30/00 comments were sent to the Engineer, that several soils tests are not located where the SSTS are located on plan. On 6/15/00 the Extension of Review and Approval Time letter was signed and returned by the applicant. SST Approval Determination completed on 7/25/00. DEP issued a approval for Ackerly Farm Subdivision SPPP on 7/24/00. The project stormwater control include provisions for extended detention to mitigate peak flows and pollutant loads in several ponds. Temporary and perman*

29 NYC-WTC_000291055

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000291055Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000137900

Archival folder label for Department of Environmental Protection biweekly reports related to World Trade Center activities from 2000 to 2001.

Similar indexed content

Compare copies and versions →