DEP progress report on wastewater plants, Oct 2001

Machine-extracted title · confidence 49%

Progress report on technical support plan implementation for NYC wastewater plants, Oct 2001.

NYC-WTC_000291027–000291080
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

(service area, estimated sewage flow, cost estimate and task to be performed) prepared by the Village. On 11/23/99 the consulting engineer contacted DEP in regards to the applications/permits’ required by the WR&R. On 12/2/99 DEP received the Final Report for Task 4. The Village of Andes has completed Task 4. The Lead Agency, Village of Andes accepted the DEIS and distributed it to the involved agencies. DEP reviewed the DEIS and sent comments on 1/26/00. The nonresidential O&M cost analysis drafted by the consultant was reviewed by DEP. On 4/19/00, DEP received the Final Environmental Impact Statement (FEIS). The FEIS will be reviewed and any comments will be forwarded by 5/26/00. DEP is reviewing the Task 6 and Conceptual Facility Design Reports which were received on 6/1/00. DEP forwarded Task 6 and conceptual Facility Plan review comments to the Village. DEP conducted a meeting with communities on 7/17 regarding O&M cost. Design and Construction Phase . Agreement and the Tasks that remain to be completed. DEP received a revised cost estimate, requesting additional costs which were not accounted in the previous cost estimate, such as Easements acquisition, WWTP site purchase, DOT Project delay, and inflation. On 9/12/00 DEP received the response to DEP’s comments on the draft Task 6 reports. DEP called the consulting engineer to inform them that the response is acceptable. On 10/4//00 DEP received the Notification of Availability for Review of the SPDES permit application from the DEC. Th. review comments were forwarded on 10/20/00. On 10/10/00 DEP received a copy of review comments from the Department of The Army Corps of Engineers (ACOE), regarding the proposed activity of the NIP. DEP review an Article 15 permit for several crossings at the Tremper Kill for the purpose of installing a new sewer line. On 10/20/00 DEP sent a letter to DEC with comments regarding protection of water quality. On 1/12/01 DEP responded to the Village that DEP has no objection to proceed to enter the design phase contract with the selecte. engineering firm, provided the Draft Scope of Work is satisfactorily completed. The Village o Andes completed the DEC permit application and DEC issued a draft SPDES Permit on 2/26/0 It was noticed that the effluent limitations relevant to the micro-filtration has been amended according to the WR&R and equivalent Turbidity removal to achieve a 99.9 and 99.99% removal/inactivation of Giardia lamblia and Enteric Viruses respectively. On 2/21/01, DEP me with the project manager of the Village of Andes regarding the industrial wastewater and sewei ordinance related subject. On 4/4/01, DEC issued the SPDES Permit. On 4/18/01, DEP received a monthly progress report and costs incurred from Oct. 2000 to March 2001. The consulting engineer has entered into the design phase work by signing the contract. On 8/9/01 DEP met with the Village Mayor, Consultant and NYSDOH to discuss a sewer/water main separation and piping, issues pertinent to the design of the sewer and the treatment plant and schedule. On 8/27/01 DEP received a preliminary design plan showing Site Plan, Process Flo^ Diagram, and Piping and Instrumentation for review. The review comments were verbally giv to the Village of Andes in a meeting on 8/31/01. DEP received a letter from the design engine on 9/13/01, responding to DEP’s review comments.

Town: Andes (V) Drainage Basin: Pepacton Reservoir Project Name: Village of Andes Water Supply Improvement, (Log #8983) Project Description: Improvement of water supply system, supply source, storage, transmission lines and fire flow etc. Status: SEQRA review on 11/15/99. DEP as an “Interested Agency” responded that DEP had no objection to the Village Board’s request to be Lead Agency on 11/15/99. On 4/12/00, DEP received “Notification of Availability for Review”, copy of competed SPDES permit applicat for proposed Library well treatment system, vicinity map and site plan dated 3/30/00 sheet 6 c 23. Verbal comments were issued to DEP due the shortness in time to review information.

28

NYC-WTC_000291054

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000291054Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Permit application, Education Dept. · page 89

NYC-WTC_000245464

Permit application unrelated excerpt; contains mayoral report and NYC identifiers; likely overarching documents for school-related permit.

Similarity score 0.930 (not a probability)

machine-extracted · confidence unavailable · Check page ↗
Permit application, Education Dept. · page 92

NYC-WTC_000245464

Permit application unrelated excerpt; contains mayoral report and NYC identifiers; likely overarching documents for school-related permit.

Similarity score 0.929 (not a probability)

machine-extracted · confidence unavailable · Check page ↗

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000137900

Archival folder label for Department of Environmental Protection biweekly reports related to World Trade Center activities from 2000 to 2001.

Similar indexed content

Compare copies and versions →