NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 54 pages

DEP progress report on wastewater plants, Oct 2001

Machine-extracted title · confidence 49%

Progress report on technical support plan implementation for NYC wastewater plants, Oct 2001.

NYC-WTC_000291027–000291080
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

requirements. NYSDOH explained that the house has hot been occupied a long time as a! bedroom house and the septic system structure and capacity is unknown, and the whole stn is very old. On 4/17/01, the engineer performed an investigation of the existirig septic syst The excavation followed the piping to find a sewage disposal structure. A cesspool of unto size appears to be located under the walkway and next to a large tree. The excavation was discontinued to avoid damaging the tree. It was agreed that a hydrologic pump test would 1 performed on the existing cesspool, DEP contacted the engineer regarding the pumping tes status on 4/27/01. The engineer told DEP that a flow meter has been installed they will be running approximately 1000 gpd of water for several days to test the hydraulic capacity of 1 cesspool. On 6/4/01, DEP issued the approval for upgrading the existing septic system. A. grease trap and septic tank has been installed as approved by NYSDOH and in accordance DEP review. On 6/11/01 the engineer submitted a letter certifying the completion of the construction with an attachment of an “As Built” sketch. A clean-out between the grease tr and the septic tank was missing in the sketch. DEP returned the sketch with a note and call the engineer requesting the installation of the clean-out be shown on the plans. DEP inspec the site on 6/25/01 and found that the clean-out has not been installed. On 7/23/01 DEP witnessed the installed clean-out on the grease trap discharge line. DEP received an “As B; sketch of the clean-out on 7/30/01. DEP sent a letter of the construction acceptance on 7/31 SEQRA - Type II - Maintenance and repair involving no substantial changes.

Town: Andes (V) Drainage Basin; Pepacton Reservoir Project Name: Village of Andes Proposed WWTP, (Log #3618) Project Description: Proposed WWTP; MOA Program 122 Area #4. Status: SEQRA Type I; Village is Lead Agency. DEP attended the Public Information Meeting on 5/26/98 conducted by the engineer. DEP received the Task 2 report on 7/13/98; sent letter ol preliminary response and held meeting on 7/15/98 to discuss the sewer service area, flow estimate, and potential treatment plant and subsurface discharge sites. DEP received the fma Task 2 report on 7/27/98 and draft of sub task 3,2. DEP received the Task 3 draft report; visi several subsurface disposal sites; issued comments on 8/17/98; met with Village and engine< 8/25/98 to discuss the comment letter and on 9/29/98; also met with DOT to discuss DOT requirements regarding design and construction of sewer line along NYS Route 28 and schei of NYS Route 28 reconstruction. On 11/2/98 DEP received Task 3 report which is under review. On 12/14/98 DEP responded to NYS DOT for the Project PIN 901837, Route 28 Reconstruction, which is relevant to the Village of Andes new sewage infrastructure project. 1/19/99 DEP attended the public information meeting conducted by the Village. On 2/5/991 sent a letter regarding the SEQRA process that the Village of Andes should prepare and responded to the Engineer’s letter regarding Task 4 and parts of Task 6. DEP called the consulting engineer, on 3/19/99, to make comments on the preliminary proposed constructio: costs estimate. DEP received a NIP Monthly Report on 3/25/99. On 5/27/99 DEP attended 1 meeting with the DOT regarding the sewage collection system project and DOT project of th State Route 28 Betterment Project. The subject that discussed were the project schedule, Highway Right-of-Way, sewer locations, contract document preparation and “Betterment Project”of DOT. The consulting engineer conducted subsurface exploratory boring at the potential alternate site for the treatment facility on 6/28/99. DEP received Task 4 Report on 7/14/99 and its review is in progress. DEP reviewed Draft Task 4 Report and sent a letter of comments to the engineer on 8/18/99. On 9/8/99 DEP received a UST investigation report. DEP reviewed the Project Status Report for the month of July. On 10/6/99 DEP met with the Village representative. Village’s attorney and the consulting engineer to discuss the Agenda

27 NYC-WTC_000291053

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000291053Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000137900

Archival folder label for Department of Environmental Protection biweekly reports related to World Trade Center activities from 2000 to 2001.

Similar indexed content

Compare copies and versions →