NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 70 pages

DEP enforcement actions, Catskill region, Oct 2001

Machine-extracted title · confidence 49%

Report on enforcement actions in Catskill region, Oct 2001.

NYC-WTC_000291081–000291150
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

performed. A design approval was issued on 7/10/01. The violation was resolved and the case was closed on 8/16/01.

3. West Branch, Boyd’s Corner Basins Name; Selca Location:' Kent Type of Use: Residential Type of Violation: Sewage Discharge Date Discovered: 8/7/00 (NOV served) Status: Ongoing Overview-and Action: Owner has yet to submit a proposal for remediation and awaiting schedule to investigate system in field. Have had dialogue with resident, but no follow through to date. Legal has been notified. Owner has constructed a new set of absorption fields without DEP approval. System has failed due to a high water table. Owner to check septic tank for infiltration and construct a curtain drain. This case has been referred to legal due to lack of response.

Town: Kent Drainage Basin: West Branch Project Name: Sedgewood View Project Description; Individual SSTS Status: Closed Overview and Action: A letter was sent to the owner on 2/28/01 with a NOV for initiating construction of a new individual SSTS on lot 8 without approval from DEP. DEP received a letter from the engineer on 3/7/01 regarding the NOV. DEP received plans on 3/9/01 which were not included in the original submission on 3/7/01. On 3/23/01, DEP received delegation status for SSTS with application and plan for joint review from PCHOD. DEP met with the owner and engineer on 4/1/01. The topo is to be field verified with a survey and re-submittal. On 5/9/01, DEP received the revised topo survey map from the engineer. Additional revisions were received on 6/11/01, 6/25/01 and 7/23/01. New soil tests were performed during the week of 8/13/01 and revised plans, approved by county health were received. 8/29/01 DEP issued a no objection letter to the health department allowing the construction of the proposed system. The NOV was closed on 9/10/01.

4. Kensico Basin Name: Midollo Location: North Castle Type of Use: Residential Type of Violation: Sewage Discharge Date Discovered: 4/13/99 Status: Ongoing Overview and Action: Owner to tie into the Quarry Heights sewer system once it is constructed. Owner is still having problems with the SSTS and is pumping out as necessary.

56

NYC-WTC_000291138

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000291138Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000137900

Archival folder label for Department of Environmental Protection biweekly reports related to World Trade Center activities from 2000 to 2001.

Similar indexed content

Compare copies and versions →