DEP progress report on wastewater plants, Oct 2001

Machine-extracted title · confidence 49%

Progress report on technical support plan implementation for NYC wastewater plants, Oct 2001.

NYC-WTC_000291027–000291080
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

system and natural channel design methodology. The project is a demonstration site under the Batavia Kill Stream Corridor Management Pilot Project. The project will include excavation to develop stable geomorphic features (dimension, pattern and profile), and will use rock vanes, cross vanes and root wads to reduce near bank shear stresses and provide erosion protection for the streambanks. Vegetative stabilization will be accomplished by the use of live material transplants (both sod mats and shrubs) as well as live fascines. The construction erosion control plan includes provisions and methods for de-watering and the use the adjacent uplands to infiltrate turbid discharges. Status; The DEP issued a NOCA on 8/10/01. An Approval Determination was issued by DEP on 08/10/01. 8/16/01: Construction underway. Dewatering plan being implemented. 9/20/01; Construction 75% complete. Dewatering plan being implemented. SEQRA - Unlisted Action, DEP Neg. Dec on 8/10/01.

NEW PROJECT #24 Town: Windham Drainage Basin: ISchoharie Reservoir Project Name: <Cuomo, Nicholas & Terry, (Log #11773) Project Description: iCPDP for Individual Residence Status: <On 6/15/01, DEP received CPDP application. NOCA & Design Approval letters were issued o 7/6/01. SEQRA - Type II, Individual Residence.

Town; Windham Drainage: Schoharie Reservoir Project Name: Windham Seafood Restaurant, (Log #11769) Project Description: A new owner, purchased a former Martin-Sullivan’s Restaurant and apartment building, and proposed the new seafood restaurant and one apartment. The applicant proposed to operate the existing septic system under Noncomplying Regulated Activity. Status: On 6/6/01 DEP received the Noncomplying Registration Form and other supporting document: and Engineer’s letter dated 6/4/01. However, State Health Department requires the investigati( of the existing septic system. On 6/13/01, DEP received the Application for review and approval for Noncomplying Regulated Activity. On 6/19, DEP sent a letter stating that DEP will not issue Noncomplying Regulated Activity Permit until they have satisfied the Health Department requirements. On 6/21 and 22/01, the engineer conducted the investigation of the existing system and revealed that the system is unsatisfactory to operate the system. The engineer called DEP to advise that the new absorption system must be designed with probably pump station. DEP reported the finding to the Heath Department. On 6/26/01 the engineer conducted the percolation test and DEP observed it. DEP sent a letter addressing that the sept system modification and alteration design must be reviewed and approved by DEP according the WR&R. DEP received the Engineering Report and plans for review and approval. On 7/6/01 DEP sent a letter of review comments. On 7/9/01 DEP received the revised plans. The design was approved on 7/17/01 and sent the plans to NYSDOH for their approval. DET received the sets of NYSDOH approved plans on 7/27/01. On 7/27/01 DEP received a letter dated 7/27/01 requesting a temporary sewage holding and disposal operation permit. DEP responded to the engineer commenting that a grease trap must be installed, drawing must be prepared for review and approval. Permit will end on 10/31/01 as proposed. The proposed temporary sewage holding system was approved on 8/6/01. A new grease trap was installed 8/15/01 and a high water alarm was installed on 8/29/01. On 9/4/01, the engineer submitted 1 certification for a temporary sewage holding system. DEP sent a letter of construction acceptance with a condition of that the complete subsurface sewage treatment system must b(

20 NYC-WTC_000291046

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000291046Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Permit application, Education Dept. · page 92

NYC-WTC_000245464

Permit application unrelated excerpt; contains mayoral report and NYC identifiers; likely overarching documents for school-related permit.

Similarity score 0.942 (not a probability)

machine-extracted · confidence unavailable · Check page ↗
Permit application, Education Dept. · page 93

NYC-WTC_000245464

Permit application unrelated excerpt; contains mayoral report and NYC identifiers; likely overarching documents for school-related permit.

Similarity score 0.942 (not a probability)

machine-extracted · confidence unavailable · Check page ↗

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000137900

Archival folder label for Department of Environmental Protection biweekly reports related to World Trade Center activities from 2000 to 2001.

Similar indexed content

Compare copies and versions →