NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 54 pages

DEP progress report on wastewater plants, Oct 2001

Machine-extracted title · confidence 49%

Progress report on technical support plan implementation for NYC wastewater plants, Oct 2001.

NYC-WTC_000291027–000291080
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

parties. The Consultant submitted a revised project construction estimate on 12/14/00. DEP issued a letter to the V/Hunter on 7/20/01. Stated that DEP has not received any information on the Design Contract progress; should conduct a pre-design meeting with DEP, Mayor & engineer.

Town: Hunter (V) Drainage Basin; Schoharie Reservoir Project Name: Hunter Ski Bowl; Skier Learning Center- SPPP, (Log #8606) Project Description; New building and parking lot improvements that will result in approximately 12 acres of disturbance. Status; On 5/12/99 DEP received an SPPP application for a new building and parking lot improvements that will result in approximately 12 acres of disturbance. A NICA was sent on 6/1/99 with a list of items that must be addressed before DEP review can commence. A letter was sent on 7/30/99 detailing project specific requirements regarding the SPPP. DEP sent a letter on 7/30/99 to all involved agencies requesting DEP Lead Agency status under SEQRA. 12/2/99 - Type I Project, DEP issued "Findings Statement" and Neg Dec the project. On 1/14/00 DEP approved a SPPP application for the above referenced project. The proposal is for the construction of a new 30,000 ft^ skier learning center, a new access loop in front of the base lodge and a new 100 space parking lot. Due to the planning of parking and ski facilities, there will be a net reduction of impervious surface. The project will result in the disturbance of approximately 12 acres of land area performed in phases that are detailed within the SPPP. DEP received an application for review of the sewer connection on 2/14/00. However, the sewer connection application had numerous parts of inadequate information. DEP sent NICA on 2/18/00 for the sewer connection DEP received plans for a minor modification to the approved SPPP on 3/20/00. The informatio. received depicts minor modifications to the existing drainage system in the vicinity of the Main Lodge. Since the newly piped segments are sized for the 10-yr storm and have permanent erosion control specified for the outlet, it appears to be in compliance with GP-93-06 and the WR&R. This modification is subject to all conditions stated in the 1/14/00 approval letter. Sent a letter on 3/29/00 stating DEP’s position regarding this minor modification. DEP contacted thi engineer for response to DEP’s comments addressed in the NICA for the sewer connection. Engineer needs more information from the owner. On 1/17/01 DEP received a memo via fax from the consulting engineer regarding DEP’s letter dated 2/18/00. DEP called the engineer on the subsequent day and clarified the subject. On 2/2/01 DEP received additional documentatioi to complete the application. DEP issued the NOCA for the sewer connection on 2/12/01. DEP reviewed the plans and sent a letter of comments on 2/15/01. DEP received engineer’s respons and revised plan on 2/23/01. The revised design was not acceptable for approval and a letter of comments was sent on 2/28/01. On 3/7/01 DEP received the revised plan, reviewed and approved the design plans for the sewer connection on 3/12/01. The construction started on 4/23/01. DEP will observe the sewer and stormwater related work. 5/18/01; Site excavation ir progress. Building construction underway. Temporary erosion control measures in place. The force main was installed on 5/31/01. 6/21/01: Site excavation in progress. Building constructic underway. Temporary erosion control measures in place. Construction of the project is in progress. However, no construction of the sanitary infrastructure is in progress during this month. 7/23/01: Site excavation in progress. Building construction underway. Temporary erosion control measures in place. Construction of the project is in progress. Most of the modifications of the sewer line has been completed and the leakage tests for gravity sewers we nearly completed on 8/29/01, The contractor called informing DEP that excavation for the pumping station construction was to start on 9/18/01. The following day, 9/19/01, DEP recei\ a sketch of a newly proposed pump chamber and emergency sewage storage tank from the

16 NYC-WTC_000291042

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000291042Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000137900

Archival folder label for Department of Environmental Protection biweekly reports related to World Trade Center activities from 2000 to 2001.

Similar indexed content

Compare copies and versions →