Town: Hunter (V) Drainage Basin: Schoharie Reservoir Project Name: Hunter Proposed WWTP, (Log #3615) Project Description: Proposed WWTP; MOA Program 122 Area # 1. Status: DEP received the Village’s intent to declare itself as Lead Agent on 4/16/98; project has not been SEQRA typed yet; Village is prepared to issue a Positive Declaration on the project whi will require an EIS. DEP responded on 4/24/98 with the acceptance of the Village as Lead Agent. DEP sent response letter to engineer in 5/98 regarding design parameters for Tasks 2 { 3. DEP received Task 2 draft report; issued comment letter on 7/28/98 and met with Village, engineer, NYSEFC, CWC, and attorney on 7/30/98 to discuss sewer service area and flow estimates. DEP received follow-up letter to meeting on 7/30/98 from engineer. As of 9/98, awaiting Task 2 report. On 11/10/98 DEP received a draft scope of DEIS, and DEP will revii it. On 11/17/98 the consulting engineer submitted the Task 4.2 subsurface investigation proposal, and DEP will witness the investigation work. DEP jointly investigated the potentia subsurface sewage disposal site. DEP awaiting a draft report. On 12/29/98 DEP sent a letter review comments for DRAFT SCOPE of the SEQRA. 1/19/99 DEP received the Task-3 Repc from the Village for review. On 2/8/99 DEP received a Final Scope for the Village of Hunter New Infrastructure Program and issued a letter of review comments on 3/12/99 for Task 3. E received a Monthly Progress Report on 2/23/99 for up to the month of January activities. 3/8/99 the consulting engineer called to discuss DEP review comments for Task 3 Report. 0 3/9/99 DEP received a letter regarding Subsurface Discharge SPDES Facilities, commercial a housing developments, which the Consulting Engineer and the Village Attorney are requestin revision of the maximum permitted sewage flow. DEP is examining this request, a NIP Monthly Report on 3/25/99. On 3/22/99 DEP received Task 4.2 Subsurface Investigation and Preliminary Report. On 4/27/99 the consulting engineer submitted a secondary treatment alternative analysis, which is a part of Task 4 Report. On 5/19/99 DEP responded to a letter, dated 4/27/99, from the Consultant. 5/18/99 DEP received a letter describing proposal of son Task 6 work. DEP received the Engineering Fee proposal for some of Task 6 to be conductec during the Task 4 study. On 8/2/99 DEP received Draft Task 4 Report. On 8/11/99, DEP did joint site visit with the DOT and consulting engineer to investigate collection sewer feasibility on the site. DEP reviewed Task 4 Report and sent a letter of comments on 9/2/99. The Villag submitted the Monthly Report for the month of July. On 10/29/99 DEP met with the Village Mayor, the village’s attorney and the consultant to discuss the Agenda prepared by the Villagi The discussion was focused on the New Infrastructure Program funding allocation and a coordination with the WWTP Upgrade Program. The Consultant submitted a revised project construction estimate on 1/27/00. DEP received a response to the Task 4 review comments fr the consulting engineer. Also the Consultant proposed a partial task work for Task 6. DEP authorized proceed the preparation of the facility plans described in Task 6. On 4/27/00, DEP attended the DEIS Public Hearing at the Village Hall. The Village submitted the Facility Plan 4/24/00. DEP reviewed the Facility Plan and the comments will be forwarded to the Village. The Village of Hunter representatives were attended a meeting on 7/17/00 with DEP to discus O&M Cost issue. Design Phase agreement, and the Village’s Task to be completed. On 8/8/0 the consulting engineer of the Village of Hunter responded to DEP comments regarding Task and the Facility Plan. DEP made comments on the O&M costs regarding the tertiary filtration and phosphorus removal on 8/23/00. The highlight of activities in September was the Capital and O&M cost discussion for phosphorus removal and sand filtrations, and additional cost claimed for the sludge processing and handling. DEP received a cost analysis for upgrading tl wastewater treatment facilities consolidation into the Village wastewater treatment facility anc collection system. DEP reviewed the analysis and forwarded the comments to the involved
15 NYC-WTC_000291041
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000290962
Status report on DEP nonpoint source pollution projects and activities, Jul–Sep 2001.
10 shared non-person entities · 1 shared topics · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291081
Report on enforcement actions in Catskill region, Oct 2001.
12 shared non-person entities · 1 shared topics · similarity 0.949
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000137900
Archival folder label for Department of Environmental Protection biweekly reports related to World Trade Center activities from 2000 to 2001.
12 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000143501
A scanned page containing fragmented text and symbols from the Department of Environmental Protection archives.
4 shared non-person entities · 1 shared topics · similarity 0.950
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000144412
Semi-annual compliance progress report for Wards Island STP covering January through June 2002.
2 shared non-person entities · 1 shared topics · similarity 0.945
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000137580
Cover sheet for a file folder containing World Trade Center environmental protection records from the Office of the Mayor.
12 shared non-person entities · 1 shared topics · similarity 0.945
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000137749
Archival folder label for Department of Environmental Protection invoices related to World Trade Center activities from 1999 to 2001.
8 shared non-person entities · similarity 0.939
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000411617
SEQR Appendix A supporting data for environmental assessment process.
5 shared non-person entities · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000411602
Full SEQR environmental assessment form and guidance for project significance.
4 shared non-person entities · similarity 0.930
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000141695
Section of an environmental assessment describing existing physical conditions and construction impacts at the World Trade Center site.
7 shared non-person entities · similarity 0.930
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000137473
Cover sheet for a file folder containing World Trade Center environmental coordination records from the Office of the Mayor.
10 shared non-person entities · 1 shared topics · similarity 0.930
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000159234
Document outlining goals and responsibilities for addressing stormwater flooding at MTA subway stations.
2 shared non-person entities · 1 shared topics · similarity 0.928
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000291081
Report on enforcement actions in Catskill region, Oct 2001.
Similarity score 0.938 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291015
Quarterly progress on upgrades for non-City owned SPDES plants in NYC Watershed, Oct 2001.
Similarity score 0.937 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290962
Status report on DEP nonpoint source pollution projects and activities, Jul–Sep 2001.
Similarity score 0.933 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290962
Status report on DEP nonpoint source pollution projects and activities, Jul–Sep 2001.
Similarity score 0.928 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291081
Report on enforcement actions in Catskill region, Oct 2001.
Similarity score 0.927 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000148621
Memo outlining DEP activities including assessment and coordination with federal agencies for street and sidewalk cleaning.
Similarity score 0.922 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000290962
Status report on DEP nonpoint source pollution projects and activities, Jul–Sep 2001.
Similar indexed content
Archival folder label for Department of Environmental Protection biweekly reports related to World Trade Center activities from 2000 to 2001.
Similar indexed content
NYC-WTC_000143501
A scanned page containing fragmented text and symbols from the Department of Environmental Protection archives.
Similar indexed content
NYC-WTC_000291081
Report on enforcement actions in Catskill region, Oct 2001.
Similar indexed content
Semi-annual compliance progress report for Wards Island STP covering January through June 2002.
Similar indexed content