DEP progress report on wastewater plants, Oct 2001

Machine-extracted title · confidence 49%

Progress report on technical support plan implementation for NYC wastewater plants, Oct 2001.

NYC-WTC_000291027–000291080
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Town: Hunter (V) Drainage Basin: Schoharie Reservoir Project Name: Hunter Proposed WWTP, (Log #3615) Project Description: Proposed WWTP; MOA Program 122 Area # 1. Status: DEP received the Village’s intent to declare itself as Lead Agent on 4/16/98; project has not been SEQRA typed yet; Village is prepared to issue a Positive Declaration on the project whi will require an EIS. DEP responded on 4/24/98 with the acceptance of the Village as Lead Agent. DEP sent response letter to engineer in 5/98 regarding design parameters for Tasks 2 { 3. DEP received Task 2 draft report; issued comment letter on 7/28/98 and met with Village, engineer, NYSEFC, CWC, and attorney on 7/30/98 to discuss sewer service area and flow estimates. DEP received follow-up letter to meeting on 7/30/98 from engineer. As of 9/98, awaiting Task 2 report. On 11/10/98 DEP received a draft scope of DEIS, and DEP will revii it. On 11/17/98 the consulting engineer submitted the Task 4.2 subsurface investigation proposal, and DEP will witness the investigation work. DEP jointly investigated the potentia subsurface sewage disposal site. DEP awaiting a draft report. On 12/29/98 DEP sent a letter review comments for DRAFT SCOPE of the SEQRA. 1/19/99 DEP received the Task-3 Repc from the Village for review. On 2/8/99 DEP received a Final Scope for the Village of Hunter New Infrastructure Program and issued a letter of review comments on 3/12/99 for Task 3. E received a Monthly Progress Report on 2/23/99 for up to the month of January activities. 3/8/99 the consulting engineer called to discuss DEP review comments for Task 3 Report. 0 3/9/99 DEP received a letter regarding Subsurface Discharge SPDES Facilities, commercial a housing developments, which the Consulting Engineer and the Village Attorney are requestin revision of the maximum permitted sewage flow. DEP is examining this request, a NIP Monthly Report on 3/25/99. On 3/22/99 DEP received Task 4.2 Subsurface Investigation and Preliminary Report. On 4/27/99 the consulting engineer submitted a secondary treatment alternative analysis, which is a part of Task 4 Report. On 5/19/99 DEP responded to a letter, dated 4/27/99, from the Consultant. 5/18/99 DEP received a letter describing proposal of son Task 6 work. DEP received the Engineering Fee proposal for some of Task 6 to be conductec during the Task 4 study. On 8/2/99 DEP received Draft Task 4 Report. On 8/11/99, DEP did joint site visit with the DOT and consulting engineer to investigate collection sewer feasibility on the site. DEP reviewed Task 4 Report and sent a letter of comments on 9/2/99. The Villag submitted the Monthly Report for the month of July. On 10/29/99 DEP met with the Village Mayor, the village’s attorney and the consultant to discuss the Agenda prepared by the Villagi The discussion was focused on the New Infrastructure Program funding allocation and a coordination with the WWTP Upgrade Program. The Consultant submitted a revised project construction estimate on 1/27/00. DEP received a response to the Task 4 review comments fr the consulting engineer. Also the Consultant proposed a partial task work for Task 6. DEP authorized proceed the preparation of the facility plans described in Task 6. On 4/27/00, DEP attended the DEIS Public Hearing at the Village Hall. The Village submitted the Facility Plan 4/24/00. DEP reviewed the Facility Plan and the comments will be forwarded to the Village. The Village of Hunter representatives were attended a meeting on 7/17/00 with DEP to discus O&M Cost issue. Design Phase agreement, and the Village’s Task to be completed. On 8/8/0 the consulting engineer of the Village of Hunter responded to DEP comments regarding Task and the Facility Plan. DEP made comments on the O&M costs regarding the tertiary filtration and phosphorus removal on 8/23/00. The highlight of activities in September was the Capital and O&M cost discussion for phosphorus removal and sand filtrations, and additional cost claimed for the sludge processing and handling. DEP received a cost analysis for upgrading tl wastewater treatment facilities consolidation into the Village wastewater treatment facility anc collection system. DEP reviewed the analysis and forwarded the comments to the involved

15 NYC-WTC_000291041

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000291041Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000137900

Archival folder label for Department of Environmental Protection biweekly reports related to World Trade Center activities from 2000 to 2001.

Similar indexed content

Compare copies and versions →