NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Asbestos inspection report, 129 Street site

Machine-extracted title · confidence 38%

Inspection report for asbestos removal at a site on 129 Street, with inspector details.

NYC-WTC_000282067
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

_________________________ ASBESTOS INSPECTION REPORT PAGE 1 OF 1 PREMISE ADDRESS 3© Broud Sfrect ZIP yORO CODE BLOCK LOT SQUAD 1 BADGE# AO78 lacaaes I PHOTOS TAKEN Yes INSPECTOR R. RAMMOHAN BLDG . TOE BASIS OF INSPECTION TRU1285MN02

Tno'^fsBesFos Removal Corp. SAMPLE NO.-

129 Street CollegpPoint SAMPLE NO.' SAMPLE NO. SY^ 1H56 (Wbl-41(J0 "^Vanzer Engineers P.C. 2immtreetCo.LLC.________ 45 Street NewVork ^Sroad Street New Yo?k l«ri7 (2TW-0077______________ f5Y® 109b4 (W269-8171 CONTACT PERSON Dcnisc Cassidy, Building Manager TIME OF INSPECTION FROM: 8 am — 5 pm

INSPECTION DISCLOSED: Sunday 8/10/02: Henry Infantas, Cert#88020and 8 handlers of Trio and David Ezekwesili AH 01-02104 of Warren&Panzer on site. Cleaning on 26“' floor roof started and completed at 4pm. 28"' floor elevated roof completed at 8pm and lower level cleaning 30% completed. Waste bagout began at 9:30pm. ATC truck arrives at 10pm and loading of waste bags compiled at 10:40pm and I departed after a visual inspection at 11:20pm. Saturday 8/17/02: Henry and 7 handlers and Marek of Trio & David of Warren&Panzer were on site. Mobilization to 28'" floor elevator lobby after plasticization of floor. Continuation of 28"’ floor and starting of 24"' floor setback began. Tom Donohue, The Building Engineer on site providing assistance. I departed from the premise after preparation work was satisfactory in the office space at the 24“ floor. Photographs were taken. I depart on annual Leave from 8/17/02. Saturday 9/14/02: Gerardo A. Quintanille and 8 handlers of Trio & Edman Dibra AH 01-12337 of W’arren and Panzer were on site for the 13* floor setback gravel cleaning. Office space on IS'" floor was plasticized prior to work start on the setback. 13* floor completed at 10pm. Bags were moved out of the building. Saturday 11/16/02: Jan Wolkowicz and 6 handlers of Trio and Celestine Obika of Warren and Panzer were on site. Scaffold #1 was covering the facade on Broad Street from west side covering One Bay of windows (3 Rows) and Scaffold#2 covering two bays of windows (6Rows) at the comer of Exchange Place and Broad Street, began cleaning. Up to the 11'" floor window ledges cleaning completed from the 22"" floor. Sunday ll/17/02:The cleaning of ledges continues on both the scaffolds and the entire levels were completed at the end of the day. The scaffolds were dismantled completely and removed from the premises. Saturday 11/23/02: Jan Wolkowicz and 6 handlers & Oghogho ErhaberofWarren& Panzer. Two scaffoldings were assembled on Broad Street side for the fcade windows and ledges cleaning. Both the scaffoldings were up and cleaning was in progress covering 8 rows of windows. Sunday 11/24/02: Both scaffolds continue from 10“ floor and down cleaning the facade. The facade cleaning completed at the end of the day and scaffolds were dismantled. Saturday 12/07/02: Ireneusz Womoezyl and three handlers were on a 130ft boom lift cleaning the windows and ledges on New Street side facade. Six rows of windows were completed at the end of the day. A second crew comprising of Jan Wolkowicz and five handlers on two scaffolds cleaning windows and ledges on Exchange Place and completed the entire drops. Festy of Wairen and Panzer performed air sampling. Sunday 12/08/02: The same two crew continued working on lift truck and scaffold and completed facades on New Street side and Exchange Place. Saturday 12/14/02: Ireneusz Womoezyl and five handlers were on two scaffolds on Exchange Place facade and began cleaning the windows and ledges. At the end of the day the entire length of facade cleaning was completed and this will conclude the cleaning of the entire exterior of the premises. Project Completed.

NOV# INFRACTIONS RESULT CODE 5 NOV# SUPERVISORS JNITJALS

DV7KU MANHATT.XN 2 = BRONX 3=

BLDG. TYPE A> 6 STORIES B< 6 STORIES C SINGLE FAMILY D SCHOOL E HOSPITAL F PUBLIC OWNED PROPERTY RESULT CODES 1 = Violation Issued 2 = No Violation Issued 3 = No access 4 = Project not Started (no NOV) 5 = Public Owned Property ACP3093

C ITY_D EP_WO R B Y_C AN N ATA_S U B P_000004706

NYC-WTC_000282067

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000282067Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →