NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Asbestos inspection, 130 Liberty Street, Jan 2009

Machine-extracted title · confidence 32%

Asbestos inspection entry for 130 Liberty Street, including inspection metadata and photos.

NYC-WTC_000265978
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date: 130 Liberty Street 01/29/09 Floor Zip Borough Block Lot Squad # Badge # Various 10006 1 54 1 1 A062 Inspector Building Type Basis of Inspection Photos Taken M.Gagnidze F TRU2068MN08 yes Contractor’s Name Sample Number LVI Environmental Address City Sample Number

State Zip Phone Sample Number

Laboratory Name Ownerls Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1340 Broadway New York One Liberty Plaza New York State Zip Phone State Zip Phone NY 10018 NY 10006 (212) 962-2300 Contact Person Time of Inspection from: Arnel Javal, Sr. Proj. Mgr/TRC Environmental 1:30 pm to 3:15 pm

I arrived at the premise at 1:30 pm, LVI schedule informed that activities include cleaning work area on 5"’ floor, demo, box debris, clear of floor on 3'“ and 2"‘'floors, check criticals, prepare for demo on V floor

I proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area on 5'^ floor. Negative air pressure on the floor was 0.038. One worker was present for the decon maintenance. s'*’ Floor - 28 workers were present on the floor. Workers on mezzanine south and north side of the work area were fine cleaning the spandular beams, columns, platforms, pipes, using brushes and . HEPA vacuum; electricians were working \electrical cables. Other workers were cleaning the floor. sweeping and vacuuming with equipment equipped with HEPA filters, picking up excess water and gross saturated debris using a wet-dry shop HEPA vacuum, inspecting the critical barriers, preparing boxes, replacing the filters of micro trap machines. 5 Gaylord boxes were sprayed with amended water and ready to be taken out. Inspection was done on micro trap machines and tents. After following the decontamination procedure I signed the log book and used north hoist to proceed to the 3^” floor, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area. Negative air pressure on the floor was 0.010. One worker was present for the decon maintenance. 3’''’ Floor - 42 workers were present inside the work place, cutting and removing glass fibers and air ducts, removing metal fixtures from the ceiling at the various locations on the floor using scaffolds and scissor lifts; removing pipes from the ceiling, cutting metal, using equipment equipped with HEPA filters. demolishing the shaft wall, spraying around the area, picking up debris, placing into the boxes and spraying with amended water; electricians working with the electrical cables; workers were preparing, wrapping and loading out boxes. A large amount of poly wrapped beams exists on the floor. 50 Gaylord boxes were ready for load out. Inspection was done on micro trap machines and tents. I used B stairwell to proceed to the 2™’ floor. 2'’'“ Floor - 42 workers were working on the floor. Two workers were setting up two additional micro trap machines and exhaust ducts. Carpenters were present constructing the platforms on the south side mezzanine. Workers on scaffolds were removing the pipes and air ducts from the ceiling at the various locations of the floor, cutting into the pieces using tools with HEPA vacuum attached, removing debris from the floor, placing into the boxes and spraying the work are with amended water. Others were wrapping beams with poly, preparing and loading out boxes through the waste decon. 35 Gaylord boxes were on the floor. Inspection was done on micro trap machines and tents. I used B stairwell to go back to the 3'"'' floor. After following the decontamination procedure I signed the log book and used north hoist to return to the ground floor. Inspection was done on ATC trailer.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction Supervisor’s Initial

Borough 1 “Manhattan 2=Bronx 3=Brooklyn 4=Queens S^Richmond Building Type A >6 stories B <6 stories C single family D school E hospital F public owned Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV) 5=Public Owned Property

CITY_DEP_WORBY_CANNATA_SUBP_000130863

NYC-WTC_000265978

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000265978Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →