NYC 9/11 Public Portal Document
Asbestos Inspection Report
Premise No. Inspection Date:
130 Liberty Street 03/16/09
Floor Zip Borough Block Lot Squad # Badge #
Various 10006 1 54 1 1 A062
Inspector Building Type Basis of Inspection Photos Taken
M.Gagnidze F TRU2068MN08 yes
Contractor’s Name Sample Number
LVI Environmental
Address City Sample Number
State Zip Phone Sample Number
Laboratory Name Owner’s Name
TRC Environmental Corp The Lower Manhattan Development Corp.
Address City Address City
1340 Broadway New York One Liberty Plaza New York
State Zip Phone State Zip Phone
NY 10018 NY 10006 (212) 962-2300
Contact Person Time of Inspection from:
Arnel Javal, Sr. Proj. Mgr/TRC Environmental 1:45 pm to 2:50 pm
I arrived at the premise at 1:45 pm. LVI schedule informed that activities include: scrape fireproofing,
Clear off floor on S'^floor, clear off floor, scrape fireproofing, erect platforms various locations on
2'’",floor, clear floor, cut ducts, demo walls, ceilings on V* floor.
I proceeded to the decon, signed the log book, don the appropriate level of personal protective
Equipment, to enter the regulated area on I’floor. Four workers were present for the decon
maintenance, cleaning the shower chambers and organizing the clean room.
I used B stairwell to proceed to the 3'“ floor.
3^^“ Floor - 48 workers were present. Workers were spraying and scraping fireproofing of all horizontal and
vertical surfaces at the area 6, washing critical barriers, cleaning platforms of scissor lifts from debris, picking
up debris from the floor, placing into the boxes. Other workers were plasticizing the west side platform with 6
mil poly, replacing filters of micro trap machines, preparing and loading out boxes. 5 Gaylord boxes were ready
to be taken out. Inspection was done on micro trap machines and tents.
I used B stairwell to proceed to the 2™^ floor.
2"'' Floor - 54 workers were found inside the work area. Workers on scaffolds were scraping fireproofing at the
area 6, spraying with amended water, cleaning the floor and platforms of the scissor lifts. Eagle scaffolding
workers erecting the platform at the east side vestibule. Two workers on scissor lifts were cutting metal fixtures
from the ceiling at the north side vestibule. Other workers were covering electrical panel, sweeping and
vacuuming the floor at the B stairwell with equipment equipped with HERA filters, preparing boxes.
8 Gaylord boxes were on the floor sealed, sprayed and ready for load out. 35 micro trap machines were
powered on and 5 on stand by. Inspection was done on micro trap tents.
I used B stairwell to proceed to the V floor.
1®* Floor - 88 workers were on the floor. Workers on scissor lifts at the various locations were removing
insulation and cutting air ducts; demolishing the brick walls and spraying with amended water; clearing shafts,
placing debris into the boxes and spraying with amended water; cutting metal at the various locations into the
pieces using equipment equipped with HERA vacuum, wet wrapping beams, preparing and loading out boxes
through the waste decon. A large amount of debris and poly wrapped beams exists on the floor. 15 Gaylord
boxes were on the floor ready for load out. Inspection was done on micro trap machines and tents.
I observed 1 light bulb hanging without protection. Foreman was advised to conduct emergency repair.
After following the decontamination procedure I signed the log book and left the decon.
Inspection was done on ATC trailer.
NOV# Infraction Infraction Infraction Infraction
NOV# Infraction Infraction Infraction Result Code
2
NOV# Infraction Infraction Infraction Supervisor's Initial
Borough l=Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond
Building Type A >6 stories B <6 stories C single family D school E hospital F public owned
Result Code I = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV)
5=Public Owned Property
CITY_DEP_WORBY_CANNATA_SUBP_000130803
NYC-WTC_000265955
OCR can misread numbers and units. Confirm readings against the page image before using them.