Asbestos Inspection Report
Premise No. Inspection Date:
130 Liberty Street 03/28/09
Floor Zip Borough Block Lot Squad # Badge #
Various 10006 1 54 1 1 A062
Inspector Building Type Basis of Inspection Photos Taken
M.Gagnidze F TRU2068MN08 yes
Contractor’s Name Sample Number
LVI Environmental
Address City Sample Number
State Zip Phone Sample Number
Laboratory Name Owner’s Name
TRC Environmental Corp The Lower Manhattan Development Corp.
Address City Address City
1340 Broadway New York One Liberty Plaza New York
State Zip Phone State Zip Phone
NY 10018 NY 10006 (212) 962-2300
Contact Person Time of Inspection from:
Arnel Javal, Sr, Proj. Mgr/TRC Environmental 1:30 pm to 2:35 pm
I arrived at the premise at 1:30 pm. LVI schedule informed that activities include: scrape fireproofing, clear off
floor on 3''Jfloor, clear off floor, scrape fireproofing, erect platforms various locations on 2"^' floor, clear floor,
cut ducts, demo walls, ceilings on V floor
I proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to
enter the regulated area on 3"’loor.
One worker was present for the decon maintenance, cleaning and organizing the clean room. Negative air
pressure on the floor was -0.028.
3'^'' Floor - 37 workers were on the floor in the process of scraping fireproofing at the area 13, spraying
amended water, washing and cleaning the beams, columns, scaffolds, removing metal fixtures from the
columns, picking up debris, cleaning the floor. Other workers were preparing boxes, attaching the high visibility
fencing in part of the south area around shaft.
20 Micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents.
I used B stairwell to proceed to the 2"'^ floor.
2"'’ Floor - 36 workers were observed inside the work area. Workers on scaffolds at the high ceiling vestibule
were still setting up plywood on platforms, preparing the area for fireproofing removal. All scaffolds have been
covered with poly. Two workers in scissor lift were removing metal fixtures from the wall. At the north west side
of the work area workers were removing vertical metal panel. At the north side of the high ceiling vestibule
workers were demolishing glass/metal frame partition. Others were preparing boxes. 7 Gaylord boxes were
ready for load out. 22 micro trap machines were powered on and 5 on stand by.
Inspection was done on micro trap tents.
I used B stairwell to proceed to the V' floor.
1” Floor - 67 workers were present. Workers in scissor lifts, wearing harnesses and attached to a life safety
line, were removing the insulation and cutting air duct, removing metal fixtures from the ceiling at the various
locations, cutting conduit at the shaft, placing debris into the boxes and spraying with amended water; cutting
metal at the various locations into the pieces using power tools with HEPA vacuum attached. Workers were
observed on mezzanine cutting vertical pipes. A large amount of debris and poly wrapped beams exists on the
floor. Other workers were clearing off the floor from debris, preparing boxes.
50 Gaylord boxes were on the floor ready for load out. Inspection was done on micro trap machines and tents.
I used B stairwell to proceed to the 3"^ floor.
After following the decontamination procedure I signed the log book and used south hoist to return to the
ground floor.
Inspection was done on ATC trailers.
NOV# Infraction Infraction Infraction Infraction
NOV# Infraction Infraction Infraction Result Code
2_____________________
NOV# Infraction Infraction Infraction Supervisor’s Initial
Borough l=Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond
Building Type A >6 stories B <6 stories C single family D school E hospital F public owned
Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV)
5=Public Owned Property