NYC-WTC_000307985
Summary of stormwater and drainage system needs for OEM facility near Gravesend.
10 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗Summary of outstanding activities including storm water management at new OEM HQ site.
NYC-WTC_000247486OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Fax: Oct 19 2001 22:02 P.Ol
Commissioner Miele CC: First Deputy Commissioner Chapin /SOI Deputy Commissioner Avaltroni 718-595-4644/6 Deputy Commissioner Greeley Deputy Commissioner Lopez Deputy Commi^ioner Principe 914-741-0348 FROM: RE: Paul Bennett WlC Daily R^rt for 10/19/01 5 DATE: Oct. 19,2001 via FAX -'idA Summary of outstanding activities for 10/19/01.
OEM requests assistance in design and installation of storm water runoff form their new HQ, OEM has requested assistance in design and installation of a stoma water management system for their new facility being built in Gravesend, BK {W13 St & Ave Z). Apparently, a large parking lot is being constructed and OEM has asked for assistance in installing catch basins / storm drains. Is this something for DEP or DDC?
Health and Safely meeting Quality of water to be / is being pumped front the WTC Update: Additional sampling and analysis of the water in the basement will be conducted by EPA. Industrial Waste is working with DDC and their contractor on developiug a plan. DDC did not identify when dewatering would begin. NYSDOH Jim Covey and NYSDEC questioned the quality ofthe water to be/is being pumped outfrom the basements of the WTC andfrom the PA tunnel and into the sewers. PEC has indicated that they are willing to take the lead on this issue (plan, protocol and ultimate disposal), but th^ need NYC to askfor such assistance. Diana /Al /Doug - Haw do you want me to handle? Please contact me.
Dust Control Dust control was reported as very good at two of the WTC contractors’ sites while it was reported as fair to poor at the other two WTC sites. Dust suppression consultant has not yet started.
At the request of Mike Gilsenan, I informed EPA of debris on the road / sidewalk on N/E/C of Albany St between South End Ave and West St. and asked for their contractors to clean this area.
Training Opportunity The International Union of Operating Engineers will be conducting a seminar on “Trenching and excavation safety, soil analysis, use of protective systems and the requirements of OSHA 1926.650-2 standard excavations and new ANSI standards Al 0.12 excavation” on Sunday, Oct. 21 at 9:00 AM at PS 89. All arc welcome.
OSH A sampling Results Summary as of 10/19 attached. Manpower hours for EMRP on 10/19/01: Paul Bennett Pier 92 10:30 AM-10:30 PM 12 hrs Frank Vazquez Command Bus 12:00 AM-12:00 PM 12 hrs Robert Kepich Command Bus 12:00 PM-12:00 AM 12 hrs Joe Scafidi Command Bus off -end-
NYC-WTC_000247486
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000307985
Summary of stormwater and drainage system needs for OEM facility near Gravesend.
10 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000209380
Memo requesting DEP assistance for storm water runoff design and installation at the OEM new facility in Gravesend.
11 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000307984
Outlining outstanding activities and requests for stormwater and OEM involvement.
8 shared non-person entities · 1 shared topics · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗8 shared non-person entities · 1 shared topics · similarity 0.950
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247487
Update on OEM storm water runoff system design and installation at Gravesend facility.
8 shared non-person entities · 1 shared topics · similarity 0.946
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000455925
Daily OEM report detailing stormwater, site safety, and sampling planning actions.
11 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000455462
Daily WTC operations briefing and stormwater/ID requests for new HQ.
11 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154487
Daily report noting OEM requests for assistance in designing and installing a storm water management system.
6 shared non-person entities · 1 shared topics · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154444
Memo summarizing daily activities including a FEMA meeting request on October 11, 2001.
6 shared non-person entities · 1 shared topics · similarity 0.928
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154446
Memo summarizing WTC daily activities including water access requests and a FEMA meeting on demolition permits.
8 shared non-person entities · 1 shared topics · similarity 0.926
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154442
Summary of outstanding activities for 10/10/01 including cell phone tower placement investigation and pending technical authority site investigation report.
7 shared non-person entities · 1 shared topics · similarity 0.924
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154438
Memo summarizing daily activities including a stray current investigation site visit on October 9, 2001.
4 shared non-person entities · 1 shared topics · similarity 0.920
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000307985
Summary of stormwater and drainage system needs for OEM facility near Gravesend.
Similar indexed content
NYC-WTC_000455925
Daily OEM report detailing stormwater, site safety, and sampling planning actions.
Similar indexed content
NYC-WTC_000455462
Daily WTC operations briefing and stormwater/ID requests for new HQ.
Similar indexed content
Memo requesting DEP assistance for storm water runoff design and installation at the OEM new facility in Gravesend.
Similar indexed content
NYC-WTC_000307984
Outlining outstanding activities and requests for stormwater and OEM involvement.
Similar indexed content