NYC 9/11 Public Portal Document
Asbestos Inspection Report
Premises: Inspection Date:
130 Liberty Street 02/13/09
Floor Zip Borough Block Lot Squad # Badge # AO11
Various 10006 1 54 1 1
Inspector Building Type Basis of Inspection Photos Taken
N. Patel________ A TRU2068MN08 Yes
Contractor’s Name Sample Number
LVI Environmental
Address City Sample Number
462 Getty Avenue Clifton
State Zip Phone Sample Number
NJ 07011 (973) 772-3660
Laboratory Name Owner’s Name
TRC Environmental corp. The Lower Manhattan Development Corp.
Address City Address City
1430 Broadway New York One Liberty Plaza New York
State Zip Phone State Zip Phone
NY 10018 NY 10006 (212) 962-2300
Contact Person Time of Inspection from:
Arnel Javal, Sr. Proj. Mgr. / TRC Environmental 9:55 am - 10:45 am (3^", 4‘\ 2'”^ & V floor) and
1:30 pm - 3:50 pm (5*'' floor visual).
On the S'"" floor, 1 entered to the work area with PPE and met Mr. Geraldo, supervisor. There were 42 people
working on the floor. They were demolishing shaft area and partition walls, spraying amended water on the
debris and boxing it, cutting metals into pieces with HEPA vacuum attached to the power tool, preparing
Gaylord boxes, Eagle putting temp platform in shaft and in the decontamination system. Eighteen (18) Gaylord
boxes and poly wrapped beams were on the floor ready to be load out. Negative Air pressure was -0.025.1 used
stair B to go to 4*'' floor.
On the 4'’’ floor. Nobody was working. An inspection was done on the micro trap machines and micro trap tents
- Air pumps were on. One bulb cage was open on the stair B between 3^‘* and 4'" floor. 1 took two photos. 1 used
stair B to go to 2"'* floor.
On the 2"‘* floor, I met Mf. Jose Jimenez, supervisor. There were 50 people working on the floor. They were
demolishing partition walls, cutting duct with HEPA vacuum attached to the power tool, spraying amended
water on the debris and boxing it and preparing Gaylord boxes. Twelve (12) Gaylord boxes and poly wrapped
beams piled on the floor ready to be load out. 1 used stair B to go to floor.
On the H' floor, 1 met Mr. Luis Moya, supervisor. There were 38 people working on the floor. They were
clearing floor, demolishing walls, cutting ducts with HEPA vacuum attached, preparing Gaylord boxes and
spraying amended water on the debris and boxing it. Fourteen (14) Gaylord boxes were on the floor ready, to be
load out. I used stair B to go back to 3"' floor, proceeds to the decon area and showers out. My observation was
discussed with TRC, ATC and Bovis.
On the 5'*' floor, I along with Mr. Bob Fitzpatrick of EPA, Mr. Eric Lutzker of DOL, Mr. R. Rammohan and Mr.
Hany Giurguis of DEP entered through decontamination enclosure system to carry out visual on the 5"’ floor. I
found dust on the floor which was cleaned with HEPA vacuum. We all decided that floor was clean and without
any ACM debris. So it was passed in the final inspection. We all proceeded to the decontamination enclosure
system, decontaminated our self, signed the log book and exited out.
NDV#" Kb5ULI
2
NUV#
NOV#
Borough l=Manliatlan 2=Bronx 3=Brooklyn 4=Queens 5=Richniond
Y?
Building Type A >6 stories B <6 stories C single family D school C hospital F public
Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Projecl not started (no NOV) 5=Public Owned Property
CITY_DEP_WORBY_CANNATA_SUBP_000131208
NYC-WTC_000182037