NYC 9/11 Public Portal Document
Asbestos Inspection Report
Premise No. Inspection Date:
130 Liberty Street 03/10/09
Floor Zip Borough Block Lot Squad # Badge #
Various_________ 10006 1 54 1 1 A062
Inspector Building Type Basis of Inspection Photos Taken
M.Gagnidze_____ F TRU2068MN08 yes
Contractor’s Name Sample Number
LVI Environmental
Address City Sample Number
State Zip Phone Sample Number
Laboratory Name Owner’s Name
TRC Environmental Corp The Lower Manhattan Development Corp.
Address City Address City
1340 Broadway New York One Liberty Plaza New York
State Zip Phone State Zip Phone
NY 10018 NY 1 liiiw6 (212) 962-2300
Contact Person Time of Inspection from:
Amel Javal, Sr. Proj. Mgr/TRC Environmental 6:00 pm to 7:00 pm
I arrived at the premise at 6:00 pm. LVI schedule informed that activities include:
clear floor, cut ducts, demo walls, ceilings on 1"' floor.
I proceeded to the decon, signed the log book, don the appropriate level of personal
protective equipment to enter the regulated area on 1 ”floor. Three workers were present
for the decon maintenance, cleaning the shower chambers and organizing the clean room.
Negative air pressure manometer reading was -0.038.
l” Floor - 64 workers were present inside the work area. At the east side vestibule I observed
six workers harnessed on two scissor lifts, breaking plaster ceiling into the pieces,
using hammer and power tools attached to HEPA vacuum, bringing down pieces from ceiling
to the floor; one worker was spraying the area with amended water. At the west side vestibule
four workers on two scissor lifts were cutting and removing drop Ceilings.
The area has been also sprayed.
Four workers were observed at the east side mezzanine, right next to the B stairwell,
cutting metal fixtures from the ceiling. Three other workers were using ladders inside the
engine room, cutting and removing conduit.
Workers were clearing the shafts from debris, placing debris into the boxes and spraying
with amended water. At the various locations workers were cutting metal into small pieces,
placing into the boxes and spraying with amended water.
Other workers were: replacing filters, preparing boxes, wrapping beams with poly,
loading out sealed and sprayed boxes through the north side waste decon. A large amount
of debris and poly wrapped beams still exists on the floor.
70 Gaylord boxes were on the floor ready to be taken out. 35 micro trap machines were
powered on and 5 on stand by. Inspection was done on micro trap tents.
After following the decontamination procedure I signed the log book and left the decon.
Inspection was done on ATC trailer.
NOV# Infraction Infraction Infraction Infraction
NOV# Infraction Infraction Infraction Result Code
2__________________
NOV# Infraction Infraction Infraction Supervisor’s Initialj^^
Borough l=Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond
Building Type A >6 stories B <6 stories C single family D school E hospital F public owned
Result Code I = Violation Issued 2=No Violation Issued 3^No access 4^Project not started (no NOV)
5=Public Owned Property
C ITY_D EP_WO RBY_C AN NAT A SU B POO0131162