NYC 9/11 Public Portal Document
Asbestos inspection Report
Premise No. Inspection Date:
130 Liberty Street 03/09/09
Floor Zip Borough Block Lot Squad # Badge #
Various_________ TiWil 1 54 1 1 A062
Inspector Building Type Basis of Inspection Photos Taken
M.Gagnidze F TRU2068MN08 yes
Contractor's Name Sample Number
LVI Environmental
Address City Sample Number
State Zip Phone Sample Number
Laboratory Name Owner's Name
TRC Environmental Corp The Lower Manhattan Development Corp.
Address City Address City
1340 Broadway New York One Liberty Plaza New York
State Zip Phone State Zip Phone
NY 10018 NY 10006 (212) 962-2300
Contact Person Time of Inspection from:
Arnel Javal, Sr.’Proj, Mgr/TRC Environmental 10:00 pm to 11:05 pm
I arrived at the premise at 10:00 pm. LVI schedule informed that activities include:
clear floor, cut ducts, demo walls, ceilings on 1 floor.
I proceeded to the decon, signed the log book, don the appropriate level of personal
protective equipment to enter the regulated area on 1 “'floor. Three workers were present
for the decon maintenance, cleaning the shower chamber and organizing the clean room.
Negative air pressure manometer reading was -0.050.
1®' Floor - 50 workers were observed at the work area. At the east side vestibule I observed
three workers harnessed in scissor lift. Hard drop ceiling demo was completed,
workers were removing the metal fixtures, and bringing down pieces from ceiling to the floor.
One worker was spraying work area with amended water. On the opposite - west side -
three workers on scissor lift were removing also metal from the ceiling and spraying
the area with amended water.
Two shaft areas were still full of debris and workers were clearing the openings, placing debris
into the boxes and spraying with amended water.
Workers at the various locations were cutting metal into small pieces, placing into the boxes
and spraying with amended water.
One worker was on ladder re-sealing the hole of the east side critical barrier, other workers
were preparing boxes, cleaning floor, picking up debris, loading out sealed and sprayed boxes
through the north side waste decon. A large amount of debris and poly wrapped beams
still exists on the floor.
55 Gaylord boxes were on the floor ready to be taken out.
35 micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents.
I observed that filters of micro trap machines were dirty. Foreman was advised, and
he directed worker to replace filters immediately.
After following the decontamination procedure I signed the log book and left the decon.
Inspection was done on ATC trailer.
NOV# Infraction Infraction Infraction Infraction
NOV# Infraction Infraction Infraction Result Code
2
NOV# Infraction Infraction Infraction Supervisor’s Initial
________
Borough l=Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond
Building Type A >6 stories B <6 stories C single family D school E hospital F public owned
Result Code I = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV)
5=Public Owned Property,'
CITY_DEP__WORBY_CANNATA__SUBP_000131149
NYC-WTC_000182004