NYC 9/11 Public Portal Document
Asbestos Inspection Report
Premise No. Inspection Date:
130 Liberty Street 04/29/09
Floor iZip Borough Block Lot Squad # Badge #
Various 10006 1 54 1 1 A062
Inspector Building Type Basis of Inspection Photos Taken
M.Gaqnidze F TRU2068MN08 yes
Contractor’s Name Sample Number
LVI Environmental
Address City Sample Number
State Zip Phone Sample Number
Laboratory Name Owner's Name
TRC Environmental Cora The Lower Manhattan Development Corp.
Address City Address City
1340 Broadway New York One Liberty Plaza New York
State Zip Phone State Zip Phone
NY 10018 NY 10006 (212)962-2300
Contact Person Time of Inspection from:
Arnel Javal, Sr. Proi, Mgr/TRC Environmental 2:20 pm to 3:05 pm
I entered the premise at 2:20 pm. LVI schedule informed that activities include:
Clear floor, cut ducts, demo walls, ceilings on V floor.
I proceeded to the decon, signed the log book, don the appropriate level of personal
protective equipment to enter the regulated area on 1^‘floor. Three workers were present
for the decon maintenance, cleaning shower chambers and organizing the clean room.
Negative air pressure was -0.023.
1” Floor - 75 workers were present at the work area. Workers on mezzanine and two
scissor lifts at the north/west side area were demolishing drop ceilings, clearing the floor
from debris, placing into the boxes, spraying with amended water.
Workers on the south/east side of the work area, harnessed in scissor lifts, were
Cutting conduits, using power tools equipped with HEPA vacuum, picking up metal pieces
and placing into the boxes.
Eagle scaffolding workers were erecting scaffolds at the north/east side work area.
Other workers were; cutting metal into small pieces, placing into the boxes and spraying,
loading out sealed and sprayed boxes through the north side waste decon.
Approximately 40 Gaylord boxes were ready for load out. 35 micro trap machines were powered
on and 5 on stand by. Inspection was done on micro trap tents.
I observed that: 1. Part of live electrical cable needed to be covered with poly; 2. light bulb
with melted protection cage was hanging on live electrical cable. Foreman John Rodriguez
was advised to conduct emergency repair of poly; he directed workers to re-seal the cable,
then immediately contacted electricians to place the light bulb properly.
After following the decontamination procedure I signed the log book and left the decon.
I met Luis LVI Supervisor and Arnel Javal Senior Project Manager of TRC to
share the observation.
Inspection was done on ATC trailer.
NOV# Infraction Infraction Infraction Infraction
NOV# Infraction Infraction Infraction Result Code
2
NOV# Infraction Infraction Infraction Supervisor’s Initial,
Borough l=Maiihattan 2=Bronx 3=Brooklyn 4=Queens 5=Riclimond
Building Type A >6 stories B <6 stories C single family D school E hospital F public owned
Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV)
5=Public Owned Property
C ITY_D EP_WO RBY_C AN NAT A SU B POO0131140
NYC-WTC_000181995