NYC 9/11 Public Portal Document
Asbestos Inspection Report
Premise No. Inspection Date:
130 Liberty Street 04/30/09
Floor Zip Borough Block Lot Squad # F Badge#
Various 10006 1 54 1 1 ' A062
Inspector Building Type Basis of Inspection Photos Taken
M.Gagnidze F TRU2068MN08 yes
Contractor's Name Sample Number
LVl Environmental
Address City Sample Number
State Zip Phone Sample Number
Laboratory Name Owner's Name
TRC Environmental Corp The Lower Manhattan Development Corp.
Address City Address City
1340 Broadway New York One Liberty Plaza New York
state Zip Phone state Zip Phone
NY 10018 NY 10006 (212) 962-2300
Contact Person Time of Inspection from;
Arnel Javal, Sr. Proj. Mgr/TRC Environmental 8:45 am to 9:45 am
I entered the premise at 8:45. LVl schedule informed that activities include;
Clear floor, cut ducts, demo walls, ceilings on l“ floor.
I proceeded to the decon, signed the log book, don the appropriate level of personal
protective equipment to enter the regulated area on Tfloor. Three workers were present
for the decon maintenance, cleaning shower chambers and organizing the clean room.
Negative air pressure was -0.027.
1” Floor - 75 workers were present at the work area. Eagle scaffolding workers were on the
north/west side of the work area erecting scaffolds, preparing the area for hard drop
ceiling removal.
At the north/east side mezzanine workers were clearing the floor from debris, cutting conduit,
breaking drop ceiling, spraying around the area with amended water, picking up debris,
placing into the boxes.
Workers on scaffolds at the north side of work area by the north side waste decon were removing
the metal plates, that was attached to the partitions; workers were wearing body safety equipment.
Between two demolished shafts in the hallway next to the A stairwell workers area cutting metal
cables, clearing the area to build the scaffold for fireproofing removal.
Workers harnessed in scissor lifts, were cutting conduits, using power tools equipped with
HEPA vacuum, picking up metal pieces and placing into the boxes.
Other workers were: cutting metal into small pieces, placing into the boxes and spraying
with amended water, loading out sealed and sprayed boxes through the north side waste decon.
Approximately 30 Gaylord boxes were ready for load out. 35 micro trap machines were
powered on and 5 on stand by. Inspection was done on micro trap tents.
Air monitoring pumps were powered on.
I observed that two light bulbs at the south side vestibule had broken protections on and one light
Bulb inside the former computer storage room was powered on with no protection cage.
I met John Rodriguez LVl Supervisor and advised to conduct emergency repair of light cages.
After following the decontamination procedure I signed the log book and left the decon.
I met Gerard Nugget LVl Supervisor at the LVl office and Arnel Javal Senior Project Manager of
TRC to Inform them of light protection damages.
Inspection was done on ATC trailer.
NOV# Infraction Infraction infraction Infraction
NOV# Infraction Infraction Infraction Result Code
2
NOV# Infraction Infraction Infraction Supervisor’s Initial
Borough l“Manhattan 2=Bronx 3=Brook]yn 4=Queens 5=Richmond
Building Type A >6 stories B <6 stories C single family D school E hospital F public owned
Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV)