Item No. 2
A) Detectors for the preaction sprinkler system are included in the sprinkler bids (ABCO letter
attached),
B) Hot water dispensers are included in the plumbing costs (Par letter attached).
C) Installations and furnishing of the louvers are included in the HVAC estimates (Kaback
letter attached).
D) Dampers are included in the HVAC estimates (Kaback letter attached).
Item No, 3
- Track Tex bid does have the (4) rooms required for the fabric wall panels - proposal has
been revised (see attached).
- The bids for the hollow metal doors are based on the plans and specifications and
the quantities on the drawings.
Item No. 4 _s
- P&S’s bid for purchase items does add up to $16,790 (see breakdown attached).
- Ess & Vee has revised their proposal to add up to their total (see attached). . '■*<
rAWt r
Item No. 5
Geiger Roofing’s bid does include the hurricane wall waterproofing of $8,500. This will not be
duplicated when our budget price for the hurricane wall is submitted.
Item No. 6
Cirocco Ozzimo’s cost of $100,765 is inclusive of all the cement and concrete work.
If you should have any questions, please do not hesitate to call.
Very truly yours,
AM! CT/ON CO. C.
I\)fartin Schneider''
Vice President
cc; Richard Ramos
Kathy Giliberti
Chi Chu
MS:acd
c.\wpdocs\estimate[oem11 .wpd]
NYC-WTC_000173122
OCR can misread numbers and units. Confirm readings against the page image before using them.