Correspondence re: Mayor's Office at 7 WTC, June 1998

Machine-extracted title · confidence 95%

A letter from a contractor to the Department of Citywide Administrative Services regarding work at the Mayor's Office of Emergency Management.

NYC-WTC_000173121–000173122

Folder label: “Mayor's Office of Emergency Management 7 World Trade Center 1st, 7th & 23rd Floors

Page image
Scanned page image, NYC-WTC_000173122
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

AMBASSADOR CONSTRUCTION CO, INC.

Mayor’s Office of Emergency Management

June 9, 1998 Page Two...

Item No. 2 A) Detectors for the preaction sprinkler system are included in the sprinkler bids (ABCO letter attached), B) Hot water dispensers are included in the plumbing costs (Par letter attached). C) Installations and furnishing of the louvers are included in the HVAC estimates (Kaback letter attached). D) Dampers are included in the HVAC estimates (Kaback letter attached).

Item No, 3 - Track Tex bid does have the (4) rooms required for the fabric wall panels - proposal has been revised (see attached).

- The bids for the hollow metal doors are based on the plans and specifications and the quantities on the drawings.

Item No. 4 _s - P&S’s bid for purchase items does add up to $16,790 (see breakdown attached). - Ess & Vee has revised their proposal to add up to their total (see attached). . '■*< rAWt r

Item No. 5 Geiger Roofing’s bid does include the hurricane wall waterproofing of $8,500. This will not be duplicated when our budget price for the hurricane wall is submitted.

Item No. 6 Cirocco Ozzimo’s cost of $100,765 is inclusive of all the cement and concrete work.

If you should have any questions, please do not hesitate to call.

Very truly yours,

AM! CT/ON CO. C.

I\)fartin Schneider'' Vice President

cc; Richard Ramos Kathy Giliberti Chi Chu MS:acd c.\wpdocs\estimate[oem11 .wpd]

NYC-WTC_000173122

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000173122Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Letter re: OEM estimate response, June 1998 · Box 7DCAS

NYC-WTC_000173319

Letter from Ambassador Construction responding to the Division of Citywide Administrative Services regarding project estimates.

5 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.990

machine-extracted · confidence unavailable · Check page ↗
Cost estimate review request, OEM 7 WTC, June 1998 · Box 7DCAS

NYC-WTC_000173109

DCAS memo requesting clarifications and confirmations on itemized cost estimates for Mayor's Office of Emergency Management project at 7 World Trade Center floors 1, 7, and 23.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.944

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →