NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Mayor's Office of Emergency Management 7 World Trade Center 1st, 7th, & 23rd Floors NY, NY Project # 96-1346
Document / 3 pages

Request for cost clarifications on 7 WTC project, June 1998

Machine-extracted title · confidence 90%

Department of Citywide Administrative Services requests specific clarifications and confirmations for itemized costs in a bid package for 7 World Trade Center.

NYC-WTC_000173360–000173362

Folder label: “Mayor's Office of Emergency Management 7 World Trade Center 1st, 7th, & 23rd Floors NY, NY Project # 96-1346

Page image
Scanned page image, NYC-WTC_000173362
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

EXHIBIT

General comments;

1. The following work items have less than three bids: Cement & Concrete, Masonry/ J^idster, Purchase Items, Manhole cover. Marble Stone, Terrazzo, Metal & Glass Partition, Fireproofing, Roofing and Waterproofing, Projection Screen, Folding Walls, Metal Panel Wall, Safe door. Rolling Fire Door & Wire Mesh Partition.

2. Please confirm that the costs for the following items are included: a) Detectors for the preaction sprinkler systems. b) Hot water dispenser. c) Who will provide and install the louvers? d) Are the dampers included in the mechanical contract by 'Kaback' ?

3. Discrepancies between the quantity of work: • The bid by 'Interior Wall Design' for the Fabric and Wall Panels are for 4 rooms. 'Track Tex' is for two rooms. • The bid for the number of hollow metal door is not uniform for all contractors.

4. Mathematics do not add up: • Purchase items: 'P & S Ind Ltd'. • Ceilings: 'ESS VEE Acoustical'.

5. Please confirm if 'Geiger Roofing Co.' bid includes the hurricane wall. If it does it should be deleted because the design is revised.

6. Confirm that 'Cirocco Ozzimo' costs of $100, 765 is all inclusive of c<5ment and concrete work.

PG 1 OF 1

NYC-WTC_000173362

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000173362Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Cost estimate review request, OEM 7 WTC, June 1998 · Box 7DCAS

NYC-WTC_000173109

DCAS memo requesting clarifications and confirmations on itemized cost estimates for Mayor's Office of Emergency Management project at 7 World Trade Center floors 1, 7, and 23.

6 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.995

machine-extracted · confidence unavailable · Check page ↗
Letter re: OEM estimate response, June 1998 · Box 7DCAS

NYC-WTC_000173319

Letter from Ambassador Construction responding to the Division of Citywide Administrative Services regarding project estimates.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.946

machine-extracted · confidence unavailable · Check page ↗
DCAS letter on alteration costs, Aug 1998 · Box 7DCAS

NYC-WTC_000167314

Letter from DCAS regarding approved costs and revisions for alteration work on the 1st, 7th, and 23rd floors of 7 World Trade Center.

3 shared non-person entities · Same agency, volume and box · similarity 0.944

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →