Window removal quote, 7 World Trade Center, May 1998 · Box 7DCASNYC-WTC_000172777
Quote for removal of 20 windows on 7th floor and 7 exterior windows on 23rd floor of 7 World Trade Center for $22,700.00.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.975
Construction cost estimate, 7 WTC OEM, Feb 1998 · Box 7DCASNYC-WTC_000170825
Ambassador Construction submits a $10.8 million cost estimate for demolition and fit-out work at the Mayor's Office of Emergency Management.
1 shared topics · Same agency, volume and box · similarity 0.863
Fax transmittal, Glass & Architectural Metal · Box 7DCASNYC-WTC_000172773
Fax cover sheet from Glass, Glass, Architectural Metal to 7WTC-related recipient.
Same agency, volume and box · similarity 0.861
OEM 7th and 23rd floor preliminary construction budget, February 1998 · Box 7DCASNYC-WTC_000167743
Preliminary construction budget of $10,879,098 for tenant interior fit-out work on the 7th and 23rd floors of 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.860
Change Order #26 submission, 7 WTC, Nov 1998 · Box 7DCASNYC-WTC_000171821
Letter from Ambassador Construction submitting change order #26 for drywall and electrical patching work at the Mayor's Office of Emergency Management.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.858
Construction bid proposal, 7 World Trade Center, Feb 1998 · Box 7DCASNYC-WTC_000170836
Submission of a ten million dollar construction bid for demolition and tenant fit-out on the 7th and 23rd floors.
1 shared topics · Same agency, volume and box · similarity 0.857
Fax transmission, Glass & Architectural Metal · Box 7DCASNYC-WTC_000172776
Fax pages from Glass & Architectural Metal to OEM, 7WTC, 05/28/1993.
Same agency, volume and box · similarity 0.854
Change order for electrical riser installation, 7 World Trade Center, · Box 7DCASNYC-WTC_000171626
Proposal to install galvanized conduit and fiber optic cables between the loading dock and 23rd floor LAN room for $45,000.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.852
Ambassador Construction quote for OEM floors, Feb 1998 · Box 7DCASNYC-WTC_000167327
Construction cost estimate submitted by Ambassador Construction for work on the 7th and 23rd floors of 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.851
Construction proposal changes, 7 World Trade Center, Jun 1998 · Box 7DCASNYC-WTC_000173021
Letter detailing scope and cost reductions for electrical and audiovisual work at the Mayor's Office of Emergency Management following a review of bid items.
1 shared topics · Same agency, volume and box · similarity 0.851
Change Order #26 for drywall and electrical work, 7 World · Box 7DCASNYC-WTC_000173876
A memo submits Change Order #26 for $12,599 to close door openings, patch ceilings, and modify electrical systems at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.850
Revised Change Order #26R, drywall and ceilings, 7 WTC, Dec · Box 7DCASNYC-WTC_000168605
Submission of Revised Change Order #26R for drywall closure, scar patching, and ceiling work at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.850