NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/OEM®7 World Trade Center®7th & 23rd Floors
Document / 5 pages

OEM 7th and 23rd floor preliminary construction budget, February 1998

Machine-extracted title · confidence 90%

Preliminary construction budget of $10,879,098 for tenant interior fit-out work on the 7th and 23rd floors of 7 World Trade Center.

NYC-WTC_000167743–000167747

Folder label: “OEM®7 World Trade Center®7th & 23rd Floors

Page image
Scanned page image, NYC-WTC_000167743
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document FEB-04-Se 16.02 FROM.SILVERSTEIN PROPERTIES ID.2127321207 PACE 3Z7

AMfiASSADOft CXXCTRUCnON CQ. INC. ❖

February 3,1998

Ms. Cathy Gaibem Silveret^ Properties, Inc. 120 Broadway New YorK NY 10271

RE; OEM 7 World Trade Center 7lh823rdFIoore

OmtM*. Gfliberb:

We ore pleased to submit herewith our Prefim^ary Budget for the work in accordance with Swanke Hayden ConneQ Archtects drawing* (see attached M) and tenant interior fit-out project description dated January 29.1998 for the sum of TEN MILLION EIGHT HUNDRED SEVENTY NINE THOUSAND SIXTY EIGHT DOLLARS ($10,879,098.00).

IHEJEQU£2m(lfiLlSJaURX^

Demolition (7m door) $7,000.00 OrywaH 250.000.00 HoUowmctsd 14,000.00 Hardware 14,000.00 Ceilir^ 250.000.00 Electric 3,700.000,00 HVAC 1,250.000.00 Plumbing 325,000.00 Paindng wallcovering 80.000.00 Roor, Bases Carpet 166,000.00 iron & Steel 100.000.00 Masonry, Cemertf 50.000.00 SprinWera 140,000.00 Architectural Metal 86.000.00 Glass 30,000.00 Ceramic Tile 25.000.00 Woodwork 370,000.00 Projection screen appliance. Toilet accessories, etc. 25,600.00 Raised Roots 91.000.00 Signage (Allowance) 5.00000 Marble, Stone 34,000.00 Window Treatment 18.500.00 Metal & Glass Partition 75,000.00 Radiator convectors 2.500.00 Movable Partition 14.000.00

317 MADISON AVENUE. NEW YORK. NY 1020. FAX 94© 9782

NYC-WTC_OO0167743

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000167743Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Construction cost estimate, 7 WTC OEM, Feb 1998 · Box 7DCAS

NYC-WTC_000170825

Ambassador Construction submits a $10.8 million cost estimate for demolition and fit-out work at the Mayor's Office of Emergency Management.

4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.968

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →