OEM 7th and 23rd floor preliminary construction budget, February 1998

Machine-extracted title · confidence 90%

Preliminary construction budget of $10,879,098 for tenant interior fit-out work on the 7th and 23rd floors of 7 World Trade Center.

NYC-WTC_000167743–000167747

Folder label: “OEM®7 World Trade Center®7th & 23rd Floors

Page image
Scanned page image, NYC-WTC_000167744
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document FEB-04-30 :B:02 FROM SILVERSTEJN PROPERTIES ID.2127321207 PAGE 4Z7

ambassador construction co , INC.

OEM 7 World Trade Cent«' 7th & 23rd Roots

February 3, 1998 Page Two

Metal Shelving (Allowance) $5,000.00 Speciaf Doors 10.000.00 Roofing 10,000.00 Fabnc Panels 50.000.00 insulated Panels on Roof 25.000.00 Scaffolding & Miscellaneous Patching 75,000.00 Tetecommunlcatfons (Aliowanoe) 263,000.00 A.V. Work (Allowance) 1,827,106.00 Furniture (Not Included) Equipment (Not Included} •0- Gonwal Conditions 75CL55Z.00 Subtotal $10,136,565.00 Overhead i Fee 608,194.00 Ireuranee 1.25% 134.30SLQQ Total Projwrt Budget $10,679,068.00

Aftematert: Cooling tower on roof ADD $650,000 00

Alternate *2: Mecko Shades in fieu of bfinds ADD $33,000.00

QUALIRCAIfCl«S.«uEXCU«KQNS: > Port Authority fiing and inspection fees » Overtime, eMtept where bididing requires • Telephone cabling ► Security cabling and equipment ► Allowenoos for A.V. and teteoommunications work based on costs in oUftrw specrftcation •• Equipment and fijmiture not included in costs ► Sales Tax » Inspection & testing for steel ► Cost foresdsting fuel oil fines • Elevator Work * Any work to existing bathroom Continued,..

NYC-WTC_000167744

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000167744Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Construction cost estimate, 7 WTC OEM, Feb 1998 · Box 7DCAS

NYC-WTC_000170825

Ambassador Construction submits a $10.8 million cost estimate for demolition and fit-out work at the Mayor's Office of Emergency Management.

4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.968

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →