FEB 03 ’98 15:03 FR ANBRSSfiDOR CONSTR. C0212 949 9762 TO 5517382 P.03/06
.AMBASSADOR CONSTRUCTION CO , INC.
OEM
7 Worid Trade Center
7th & 23rd Floors
February 3,1998
Page Two
Metal Shelving (Allowance) $5,000.00
Special Doors 10,000.00
Roofing 10,000.00
Fabnc Panels 50,000.00
Insulated Panels on Roof 25,000.00
Scaffolding & Miscellaneous Patching 75,000.00
Telecommunications (Allowance) 263,000.00
A.V, Work (Allowance) 1,827.108,00
Furniture (Not Included) -0-
Equipment (Not Included)
General Conditions 75QJB57..Q0
Subtotal $10,136,565.00
Overhead & Fee 608,194.00
Insurance 1.25% 134.309.00
Total Project Budget $10,879,068.00
Alternate *1:
Cooling tower on roof ADD $650,000.00
Alternate #2:
Mecko Shades in lieu of blinds ADD $33,000.00
QUALIFLCATJOI4S-&-EXCLUS1QNS;
* Port Authority filing and inspection fees
* Overtime, except where building requires
• Telephone cabling
► Security cabling and equipment
► Allowances for A V. and telecommunications work based
on costs in outline specification
Equipment and furniture not included in costs
► Sales Tax
inspection & testing for steel
Cost for existing fuel oil lines
* Elevator Work
► Any work to existing bathroom
Continued...
NYC-WTC_000170826
OCR can misread numbers and units. Confirm readings against the page image before using them.