AMBASSADOR OONSTRUCT ....
❖
OEM
7 World Trade Center
7th &23id Roots
F®bn»fy3,1888
Page Two
Metal Shehring (AKowanoe) $5,000.00
Spectef Doors 10,000.00
Roofing 10,000.00
Fabnc Panels 50,00000
Insulated Panels on Roof 25,000.00
Scaffolding & MIsceUaneous Patching 75,000.00
Tefecommiffiicatiofts (AHowanoe) 263,000.00
A.V. Work (Allowance) 1,627.108.00
Furniture (Not Induded) -0-
Equipment (Not Included) •O-
Genera) Conditions 750.55LQ0
Subtott) $10,136,565.00
Overhead & Foe 608,194.00
insurance 1.29% 1M309LOQ
Total Pn>M Budget $10,878,068.00
Afteontefl:
Goofing tower on rodf ADD $660,000.00
AMacnatetfZ:
Mecto Shades in Heu of Winds ADD $33,000.00
QUAtlFKJAWHSJLElCCUie^
»> Port Authority fling and kwpeetion tees
•> Overtime, except where huKding requires
• Telephone caPBng
> SAcuritv oabbrKf
wwa/sMs^ And
V|BRS Mukxnonf
w>feRer«**wlrs
* Allowances ter A.V. and teteoommunteations work based
on costs in outNne specffication
»■ Equipment and temRure not included in costs
► Sates Tax
» Inspection & testing ter steel
► Cost ter exfating ted oil fines
> Elevator Work
* Any work to existing bathroom
Continued...