NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Electrical Work Estimate
Document / 2 pages

Electrical work proposal, Forest Electric Co., May 1998

Machine-extracted title · confidence 95%

Revised electrical work proposal from Forest Electric Co. for the Mayor's Office of Emergency Management at 7 World Trade Center covering multiple floors.

NYC-WTC_000172684–000172685

Folder label: “Electrical Work Estimate

Page image
Scanned page image, NYC-WTC_000172684
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

95/13/1938 14:41 31817'31 EST PAGE 02

FOREST ELECTFtlC COFIP. May 19, 1998

Ambassador Construction 317 Madison Ave. New York, NY 10017

ATTN: Mr. Martin Schneider

REF: Mayor^s Office of Emergency Management #7 WTC 1*‘ fir.., 7*^ fir. and 23'^ Fir.

ELECTRICAL WORK ESTIMATE #980656

Gentlemen: We herein submit our revised proposal for the referenced project in the amount of: $4,105,000. (Four Million One Hundred and Five Thousand Dollars). Our proposal is based on the following drawings numbered and prepared by Swanke Hayden Connell Architects and engineered by Cosentini & Assoc.: EO-01, El-01, El-07, El-23, E2-23, El-48, E3- 01, E4-01 TO E4-03, E6-01, E6-02, T-1, A-EG-23, A-1-1, A-7-1, A-23- 3 TO A-23-6, A-4S-1, D-0, D-1 TO D-12, FPl-01, FP2-07, FP3-23 TO FP6-23, Pl-01, P2-07, P3-23 TO P5-23, Ml-01, Ml-07, Ml-23, M4-01, AV-1 TO AV-4, AV-EO, AV-El TO AV-E5, AV-Sl TO AV-S8,workstation plan, panel/energy plan. Vikonics Drawings 038Z001, 038L002, 038L003, 038L005, ALL DATED 5/4/98

We qualify our proposal as follows: 1. Existing service & panels assumed adequate & available. 2. Control wiring is not included. 3. Overtime and demolition standby is not included. 4. Space assumed free of ajny hazardous conditions. 5. Furnishing & installation of data & telephone cabling is included. Terminations, jacks, faceplates, patch-panels, 110 blocks, etc. are not included. 6. Patching & painting of floors, walls & ceilings is not included.

NYC-WTC_000172684

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000172684Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Electrical work estimate, WTC OEM, Jun 1998 · Box 7DCAS

NYC-WTC_000172503

Revised electrical work proposal from Forest Electric Corp for the Mayor's Office of Emergency Management at the World Trade Center.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.978

machine-extracted · confidence unavailable · Check page ↗
Letter re: OEM estimate response, June 1998 · Box 7DCAS

NYC-WTC_000173319

Letter from Ambassador Construction responding to the Division of Citywide Administrative Services regarding project estimates.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.910

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →