NYC 9/11 Public Portal Document
95/13/1938 14:41 31817'31 EST PAGE 02
FOREST
ELECTFtlC COFIP.
May 19, 1998
Ambassador Construction
317 Madison Ave.
New York, NY 10017
ATTN: Mr. Martin Schneider
REF: Mayor^s Office of Emergency Management
#7 WTC
1*‘ fir.., 7*^ fir. and 23'^ Fir.
ELECTRICAL WORK
ESTIMATE #980656
Gentlemen:
We herein submit our revised proposal for the referenced
project in the amount of: $4,105,000. (Four Million One Hundred and
Five Thousand Dollars).
Our proposal is based on the following drawings numbered and
prepared by Swanke Hayden Connell Architects and engineered by
Cosentini & Assoc.: EO-01, El-01, El-07, El-23, E2-23, El-48, E3-
01, E4-01 TO E4-03, E6-01, E6-02, T-1, A-EG-23, A-1-1, A-7-1, A-23-
3 TO A-23-6, A-4S-1, D-0, D-1 TO D-12, FPl-01, FP2-07, FP3-23 TO
FP6-23, Pl-01, P2-07, P3-23 TO P5-23, Ml-01, Ml-07, Ml-23, M4-01,
AV-1 TO AV-4, AV-EO, AV-El TO AV-E5, AV-Sl TO AV-S8,workstation
plan, panel/energy plan. Vikonics Drawings 038Z001, 038L002,
038L003, 038L005, ALL DATED 5/4/98
We qualify our proposal as follows:
1. Existing service & panels assumed adequate & available.
2. Control wiring is not included.
3. Overtime and demolition standby is not included.
4. Space assumed free of ajny hazardous conditions.
5. Furnishing & installation of data & telephone cabling is
included. Terminations, jacks, faceplates, patch-panels, 110
blocks, etc. are not included.
6. Patching & painting of floors, walls & ceilings is not
included.
NYC-WTC_000172684