June 5th, 1998 FOREST
electric corp.
Ambassador Construction
317 Madison Ave.
New York, NY 10017
ATTN; Mr. Martin Schneider
REF; Mayor's Office of Emergency Management
WTC
1^' fir., 7"*’ fir. and 23'“ Fir.
ELECTRICAL WORK
ESTIMATE #980656
Gentlemen:
We herein submit our revised proposal for the referenced
project in the amount of; $4,234,000.(Four Million Two Hundred
Thirty Four Thousand Dollars),
Qur proposal is based on the following drawings numbered and
fc’Y Swanks Hayden Connell Architects and engineered by
Cosentini & Assoc.: E2-23, El-48, E6-01, E6-02, A-EG-23, A-7-1,
A-23~3 TO A-23-6, A-48-1, D-1 to D-12, FP2-07, FP3-23 TO FP6-23,
Pl-01, P2-07, P3“23 TO P5-23, AV-1 TO AV-4, AV-EO, AV-El TO AV-E5,
AV-Sl TO AV-S8,workstation plan, panel/energy plan. Vikonics
Drawings. - 0382001, 038L002, 038L003, 038L005, ALL DATED 5/4/98.
T-1,A-1-1, A-23-l,A-23-3,D-0,D-l,D-10,Ml-01, Ml-07, Ml-23,M4-01,
EO-01, El-07, El-01, El-23, E3-01, E4-01 TO E4-03, FPl-01, FP3-23,
FP5-23, AV-El, 038L002, dated 5/15/98.
We qualify our proposal as follows:
1. Existing service & panels assumed adequate & available.
2. Control wiring is not included.
3. Overtime and demolition standby is not included.
4. Space assumed free of any hazardous conditions.
5. Furnishing & installation of data & telephone cabling is
included. Terminations, jacks, faceplates, patch-panels, 110
blocks, etc. are not included.
6. Patching & painting of floors, walls & ceilings is not
included.