PROJECT memorandum
TO; M/. ;.M«jh.SHCA SUBJECT; 0EM-7WTC
FROM: M . V. Lemeshev JOBNO-t 1854
CC: DATE: February 15,2000 ,
' 'o improve operating conditions of the fuel oil fill pump set ti’ansferring oil from tiie '
uildins storage tank to the tenant’s storage tank, a? it is based on the field observation
y the equipment manufaauxer’s represmtarive, v/e recommend to remove existing apti-
iphon valve and to install check valve.
?heok valve shall be installed as close as possible to the building's storage tank. Use
pring loaded check valve for horizontal application.