Change Order #088 for fuel oil piping, 7 World Trade

Machine-extracted title · confidence 95%

Contractor submission of change order #088 to install new fuel oil piping and relocate ductwork at 7 World Trade Center.

NYC-WTC_000171303–000171307

Folder label: “Mayor's Office of Emergency Management 7 World Trade Center Change Order #088 Amb. Job #S57-5175

Page image
Scanned page image, NYC-WTC_000171307
OCR text

OCR status: ocr · source: ours

NYC-WTC_000171307 EW 2 HR RATED FIREPROOFING NEW FUEL LINE - EXISTING STEEL BEAN W/ 4 HR FIRE PROOFING •LIGHT AIX 08/18/88 08:32 FAT_2122190256 „S-.SL PUSH-UP FIRE DOOR BY COOKSON MODEL #FD-1 OR EQUAL (3HR FIRE RATED) TIE-IN TO BLDG. FIRE ALARM SYSTEM MEA #114-90-M CLASS "A" FIRE DOOR FUEL STORAGE TANK -4" HIGH : OIL PROO ACCESS t „{-,SZ .0,1 SWANKE HAYDEN CONNELL LIGHT FIX .01-6 •NEW STRUCTURE & 4HR FIRE PROOFING g" CONC BLOCK WALL SECTION - FUEL OIL TANK RM 20' LIMIT HT. # (4) 16" o.c. MAX. VEF W/ HORIZONTAL MASONRY REINFORCING @004/004 NYC 9/11 Public Portal Document

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000171307Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Change Order #88 submission, 7 WTC, June 1999 · Box 7DCAS

NYC-WTC_000168409

Contractor submits Change Order #88 for $120,957 to install an eight-inch conduit for fuel oil piping at the Mayor's Office of Emergency Management.

2 shared non-person entities · Same agency, volume and box · similarity 0.945

machine-extracted · confidence unavailable · Check page ↗
Change order #044R for fuel oil line work, 7 WTC, · Box 7DCAS

NYC-WTC_000168439

Change order for $85,893 covering support structures, concrete encasement, routing, and patching for fuel oil lines and enclosures at 7 World Trade Center.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.918

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000168409 · Box 7DCAS

Contractor submits Change Order #88 for $120,957 to install an eight-inch conduit for fuel oil piping at the Mayor's Office of Emergency Management.

Filed in the same folder

Compare copies and versions →